Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Federation for FIRE Plus (Fed4FIREplus)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Fed4FIRE+ project has the objective to run and further improve Fed4FIRE’s “best-in-town” federation of experimentation facilities for the Future Internet Research and Experimentation initiative. Federating a heterogeneous set of facilities covering technologies ranging from wireless, wired, cloud services and open flow, and making them accessible through common frameworks and tools suddenly op ...
Voir le projet

 24

 TERMINÉ 

GrowSmarter

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Voir le projet

 41

 TERMINÉ 

Facility for Large-scale Adaptive Media Experimentation (FLAME)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Future Media Internet (FMI) will be driven by evolving existing over-the-top (OTT) solutions towards a stronger integration with emerging programmable communication and computing infrastructures to address consumer demand for personalised, interactive, mobile and localised media experiences. Creating a trusted platform that brings together technology, creative sectors and consumers in the deve ...
Voir le projet

 11

 TERMINÉ 
Nowadays, cybercrime is one of the most relevant and critical threats to both the economy and society in Europe. Establishing efficient and effective ways to protect services and infrastructures from ever-evolving cyber threats is crucial for sustaining business integrity and reputation as well as protecting personal and sensitive data.To that end, the SHIELD project proposes a universal solution ...
Voir le projet

 12

 TERMINÉ 
Small Cells, Cloud-Radio Access Networks (C-RAN), Software Defined Networks (SDN) and Network Function Virtualization (NVF) are key enablers to address the demand for broadband connectivity with low cost and flexible implementations. Small Cells, in conjunction with C-RAN, SDN, NVF pose very stringent requirements on the transport network. Here flexible wireless solutions are required for dynamic ...
Voir le projet

 12

 TERMINÉ 
The arrival of immersive head-mounted displays to the consumer market will create a demand for immersive content of over 2 Billion euros in 2016. However, current audiovisual content is ill-suited for Immersive displays. For example, cuts between shots, which constitute the very basic fabric of traditional cinematic language, do not work well in immersive displays. ImmersiaTV will create a novel f ...
Voir le projet

 10

 TERMINÉ 

Empowering citizens to make meaningful use of open data (Open4Citizens)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

The project aims at shows the potential of open data to citizens, by creating open playgrounds where citizens, students, experts, start up companies, academia and public institutions can collaborate to generate meaningful applications. Thus, applications that meet citizens' needs and desires and contribute to their everyday life. The playground is a virtual and physical place where citizens, inter ...
Voir le projet

 8

 TERMINÉ 

Small cEllS coordinAtion for Multi-tenancy and Edge services (SESAME)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

SESAME targets innovations around three central elements in 5G: the placement of network intelligence and applications in the network edge through Network Functions Virtualisation (NFV) and Edge Cloud Computing; the substantial evolution of the Small Cell concept, already mainstream in 4G but expected to deliver its full potential in the challenging high dense 5G scenarios; and the consolidation o ...
Voir le projet

 21

 TERMINÉ 

Complete Dynamic Multi-cloud Application Management (CYCLONE)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Application service providers (ASPs) now develop, deploy, and maintain complex computing platforms within multiple cloud infrastructures to improve resilience, responsiveness and elasticity of their applications. The CYCLONE project targets the ASPs, providing them with software and tools that 1) facilitate the deployment, management, and use of their complex, multi-cloud applications and 2) enha ...
Voir le projet

 7

 TERMINÉ 

Large-scale RINA benchmark on FIRE (ARCFIRE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

ARCFIRE will bring RINA from labs into the real-world. RINA, the Recursive InterNetwork Architecture, is an innovative “back-to-basics” network architecture that solves current limitations and facilitates full integration between distributed computing and networking. RINA addresses the challenges that drive the communications industry in moving from dedicated hardware to almost completely virtuali ...
Voir le projet

 8

 TERMINÉ 

Service Programing and Orchestration for Virtualized Software Networks (SONATA)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Virtualisation and software networks are a major disruptive technology for communications networks, enabling services to be deployed as software functions running directly in the network on commodity hardware. However, deploying the more complex user-facing applications and services envisioned for 5G networks presents significant technological challenges for development and deployment. SONATA addr ...
Voir le projet

 17

 TERMINÉ 

SESAME - Software Defined Wireless Backhaul for Small Cells (SESAME)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

"The forecasted traffic growth in mobile networks is one of the biggest challenges faced by the mobile industry. In addition, declining average revenues per user (ARPUs) and rising costs of ownership increase the difficulties for service providers to fulfill this upcoming demand. Densifying mobile networks by means of adding small cells, which have a limited footprint but high data rates, is seen ...
Voir le projet

 1

 TERMINÉ 

Network Functions as-a-Service over Virtualised Infrastructures (T-NOVA)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

Network Functions Virtualisation (NFV) is an emerging concept, which refers to the migration of certain network functionalities, traditionally performed by hardware elements, to virtualized IT infrastructures, where they are deployed as software components. NFV leverages commodity servers and storage, including cloud platforms, to enable rapid deployment, reconfiguration and elastic scaling of net ...
Voir le projet

 19

 TERMINÉ 

Combining Optics and SDN In next Generation data centre Networks (COSIGN)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

The role of Data Centres (DCs) is vital for the Future Internet. However, DC infrastructures are already stressed by data volumes and service provisioning and consumption trends. Emerging demands cannot be addressed by today's DCs and call for a massive redesign or even transformation of DC architectures.COSIGN proposes a new DC architecture empowered by advanced optical technologies and will demo ...
Voir le projet

 14

 TERMINÉ 

FIRE LTE testbeds for open experimentation (FLEX)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

FIRE initiative targets the creation of a multidisciplinary research platform for investigation and experimental evaluation of innovative ideas in networking and services.At the infrastructure level, such a platform should embrace all major wired and wireless access technologies.FLEX aims at contributing a crucial missing piece in FIRE's infrastructure puzzle:cellular access technologies and Long- ...
Voir le projet

 17

 TERMINÉ 

CreatiFI: Leveraging the Future Internet for the Creative Industries (CREATI-FI)

Date du début: 1 sept. 2014, Date de fin: 30 nov. 2016,

CreatiFI addresses key challenges for ICT creative entrepreneurs in Europe in a decentralised way. CreatiFI integrates 4 Hubs located in Europe's most creative Regions: Brussels, Barcelona, Helsinki, and Trento. CreatiFI hubs will provide business and technical guidance and assistance to regional SMEs and web entrepreneurs and beyond. CreatiFI offers (1) a very intensive dissemination and networki ...
Voir le projet

 8

 TERMINÉ 
DOLFIN addresses the demand/response and energy stabilisation scenario of the Smart Grid by optimising the energy consumption of Data Centres (DC), accompanied, if necessary, with a respective negotiation and readjustment of the DC's Service Level Agreements (SLAs). To achieve this, DOLFIN adopts an innovative energy closed control loop that targets to deliver the following advancements:• Create a ...
Voir le projet

 10

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 

FEderated Test-beds for Large-scale Infrastructure eXperiments (FELIX-EU)

Date du début: 1 avr. 2013, Date de fin: 30 juin 2016,

Description The primary objective of the FELIX project is to create a common framework in which users can request, monitor and manage a slice provisioned over distributed and distant Future Internet experimental facilities in Europe and Japan. FELIX, submitted as a joint effort of two independent consortia (i.e. FELIX-EU in Europe, FELIX-JP ...
Voir le projet

 6

 TERMINÉ 

Programmability In RINA for European supremacy of virTualised NEtworks (PRISTINE)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2016,

The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Voir le projet

 16

 TERMINÉ 

Renewal, Innovation and Change: Heritage and European Society (RICHES)

Date du début: 1 déc. 2013, Date de fin: 31 mai 2016,

For many in 21st century Europe, Cultural Heritage (CH) is more about what it is than who we are: though enormously rich, this treasure is often locked away, or crumbling, or in a foreign language, or about a past which to many people - young , old, newcomers to Europe and settled inhabitants - seems of little relevance. But this is changing. As digital technologies permeate all of society, compe ...
Voir le projet

 10

 TERMINÉ 

Television Ring - Testbeds for Connected TV services using HbbTV (TV-RING)

Date du début: 1 sept. 2013, Date de fin: 29 févr. 2016,

Description TV-Ring, testing advanced network infrastructures and Connected TV applications.The TV-Ring project joins European broadcasters, research centres, software developers and service providers with a common objective: to develop and test applications and infrastructures that will shape the future internet-based television, aiming ...
Voir le projet

 8

 TERMINÉ 

Testbeds for Reliable Smart City Machine-to-Machine Communication (TRESCIMO)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2015,

Smarter and greener cities are essential to address economic, social, and environmental challenges due to the increase in urbanization, requiring informed decisions based on Internet of Things generated data. A particular challenge is the unstable power supply of cities in underdeveloped countries (e.g. South Africa), thus requiring smart energy management. Future handling of grid overload in Sout ...
Voir le projet

 8

 TERMINÉ 

Smart Platforms Enabling the Creative Industries for the Future Internet (SPECIFI)

Date du début: 1 janv. 2013, Date de fin: 30 nov. 2015,

Focal areas that Smart Cities try to overcome are the reduction of pollution, traffic, or crime, and the introduction of models for public data. However, it is SPECIFI's guiding principle that Smart Cities need to go beyond upgrades related to control tasks and public data. They can only become a success if they also become Smart Creative Cities, by employing open, Future Internet infrastructures ...
Voir le projet

 17

 TERMINÉ 

Access to cultural heritage networks for Europeana (AthenaPlus)

Date du début: 1 mars 2013, Date de fin: 31 oct. 2015,

AthenaPlus will build on the successful experience developed by the previous ATHENA project – where LIDO and the ATHENA Ingestion Server and Mapping Tool (MINT), widely used across the Europeana's ecosystem of projects including the ongoing Linked Heritage project were developed, in order to further advance and complete the effective infrastructure and tools developed to support museums and other ...
Voir le projet

 41

 TERMINÉ 
CONTENT will focus on developing next generation high capacity end-to-end, heterogeneous infrastructure technologies to support the network of the future. The model proposed will be based on the Infrastructure as a Service (IaaS) paradigm and provide a technology platform interconnecting geographically distributed IT resources that can support a variety of Cloud services. This platform will includ ...
Voir le projet

 7

 TERMINÉ 

Future media Internet for large scale CONTENT experimentation 2 (FI-CONTENT 2)

Date du début: 1 avr. 2013, Date de fin: 31 oct. 2015,

The FI-CONTENT 2 project aims at establishing the foundation of a European infrastructure for promoting and testing novel uses of audio-visual content on connected devices. The partners will develop and deploy advanced platforms for Social Connected TV, Mobile Smart City services, and Gaming/ Virtual worlds. To assess the approach and improve these platforms, user communities in 6 European locatio ...
Voir le projet

 31

 TERMINÉ 

eXperimental Infrastructures for the Future Internet (XIFI)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Voir le projet

 38

 TERMINÉ 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Voir le projet

 72

 TERMINÉ 

VISION ADVANCED INFRASTRUCTURE FOR RESEARCH (VISIONAIR)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

VISIONAIR is a project of creation of a European infrastructure that should be a unique, visible and attractive entry towards high level visualisation facilities. These facilities must be open to the access of a wide set of research communities. By integrating existing facilities, it will create a world-class research infrastructure enabling to conduct frontier research. This integration will prov ...
Voir le projet

 27

 TERMINÉ 

Investigating RINA as an Alternative to TCP/IP (IRATI)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

Driven by the requirements of the emerging applications and networks, the Internet has become an architectural patchwork of growing complexity which strains to cope with the changes. Moore's law prevented us from recognising that the problem does not hide in the high demands of today's applications but lies in the flaws of the Internet's original design. The Internet needs to move beyond TCP/IP to ...
Voir le projet

 6

 TERMINÉ 

Application and Analytics Platform Demonstration (AAPD)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2014,

"The project AAPD is the follow-up of RAISME, the very successful 'Research for SMEs' project (Grant Agreement number 262469), that came to a successful conclusion on 31st of August 2012. RAISME was aimed at providing a configurable platform for rapid development of software applications, with embedded advanced interactive interfaces and visualisation services, enabled to allow an integration ecol ...
Voir le projet

 4

 TERMINÉ 

Future Internet testbeds/experimentation between BRazil and Europe - EU (FIBRE-EU)

Date du début: 1 juin 2011, Date de fin: 31 juil. 2014,

In the last two decades networks, and especially the Internet, have become part of the critical infrastructure of governments, businesses, homes and schools. The current Internet architecture, designed about 30 years ago, has suffered many extensions in recent years, to include new functionalities, which were unforeseen in the original design. Many network experts now consider it is necessary to u ...
Voir le projet

 9

 TERMINÉ 
Depression is one of the most common causes of short and long term disability in Europe. It accounts for substantial costs both directly to health services and indirectly through lost productivity and the burden of caring. Most patients with Major Depression (MD) recover with treatment, which may be with antidepressant drugs, psychological therapy or, in severe cases, hospitalisation. However for ...
Voir le projet

 10

 TERMINÉ 

Building service testbeds on FIRE (BonFIRE)

Date du début: 1 juin 2010, Date de fin: 31 déc. 2013,

Description BonFIRE will design, build and operate a multi-site Cloud prototype FIRE facility to support research across applications, services and systems at all stages of the R&D lifecycle, targeting the services research community on Future Internet.The BonFIRE vision is to give researchers in these areas access to a facility that support ...
Voir le projet

 26

 TERMINÉ 

Open Flow in Europe: Linking Infrastructure and Applications (OFELIA)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

The aim of the OFELIA project is to create a unique experimental facility that allows researchers to not only experiment 'on' a test network but to control the network itself precisely and dynamically. To achieve this, the OFELIA facility is based on OpenFlow, a currently emerging networking technology that allows to virtualize and control the network environment through secure and standardized in ...
Voir le projet

 18

 TERMINÉ 
Linked Heritage has 3 main objectives: I) to contribute large quantities of new content to Europeana, from both the public and private sectors; II) to demonstrate enhancement of quality of content, in terms of metadata richness, re-use potential and uniqueness; III) to demonstrate enable improved search, retrieval and use of Europeana content.Linked Heritage will facilitate and deliver large-sca ...
Voir le projet

 38

 TERMINÉ 

IP Networks as a Service (MANTYCHORE)

Date du début: 1 oct. 2010, Date de fin: 30 juin 2013,

Current National Research and Education Networks (NRENs) in Europe provide connectivity services to their customers: the research and education community. Traditionally these services have been delivered on a manual basis, although some efforts towards automating the service setup and operation have been initiated. At the same time, more focus is being put in the ability of the community to contro ...
Voir le projet

 9

 TERMINÉ 

Networking innovations Over Virtualized Infrastructures (NOVI)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

NOVI (Networking innovations Over Virtualized Infrastructures) research concentrates on efficient approaches to compose virtualized e-Infrastructures towards a holistic Future Internet (FI) cloud service. Resources belonging to various levels, i.e. networking, storage and processing are in principle managed by separate yet interworking providers. NOVI will concentrate on methods, information syste ...
Voir le projet

 13

 TERMINÉ 

International Network for a Digital Cultural Heritage e-Infrastructure (INDICATE)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2012,

The INDICATE project will coordinate policy and best practice regarding the use of e-Infrastructures for digital cultural heritage in countries all around the Mediterranean.The project will establish and nurture a network of common interest made up of experts and researchers in all the relevant fields, whose sustainability will be planned on a long term beyond the project duration. The network wil ...
Voir le projet

 10