Rechercher des projets européens

35 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Large-scale computing systems are today built as distributed systems (for reasons of scale, heterogeneity, cost and energy efficiency) where components and services are distributed and accessed remotely through clients and devices. In some systems, in particular latency-sensitive or high availability systems, components are also placed closer to end-users (in, e.g., radio base stations and other s ...
Voir le projet

 9

 TERMINÉ 
C3ISP mission is to define a collaborative and confidential information sharing, analysis and protection framework as a service for cyber security management. C3ISP innovation is the possibility to share information in a flexible and controllable manner inside a collaborative multi-domain environment to improve detection of cyber threats and response capabilities, still preserving the confidential ...
Voir le projet

 11

 TERMINÉ 

European Network for Cyber-security (NeCS)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

The European Network for Cybersecurity (NECS) was formed in response to the increased need of highly qualified experts able to cope with all the aspects of the European cybersecurity strategy that is currently under implementation.There is indeed an evident need and opportunity to grow a new generation of young researchers able to answer this demand for expertize, trained to the changing nature o ...
Voir le projet

 8

 TERMINÉ 
Surveys show that, although around 80% of people are using a second device (phone, tablet or laptop) when watching TV only 20% of them are engaging with ‘companion content’.The 2-IMMERSE project will innovate around the delivery of experiences that are created to be multi-screen in production yet delivered to be flexible across single and multiple-screens and responsive to the preferences of indiv ...
Voir le projet

 7

 TERMINÉ 

Superfluidity: a super-fluid, cloud-native, converged edge system (SUPERFLUIDITY)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Superfluidity is “a state in which matter behaves like a fluid with zero viscosity”. Our project aims at achieving superfluidity in the network: the ability to instantiate services on-the-fly, run them anywhere in the network (core, aggregation, edge) and shift them transparently to different locations.The SUPERFLUIDITY project tackles crucial shortcomings in today’s networks: long provisioning ti ...
Voir le projet

 18

 TERMINÉ 
The objective of SPEED-5G is to research and develop technologies that address the well-known challenges of predicted growth in mobile connections and traffic volume. A major challenge is the cost of meeting the objective, in terms of both infrastructure and deployment. Today, lack of dynamic control across wireless network resources is leading to unbalanced spectrum loads and a perceived capacit ...
Voir le projet

 10

 TERMINÉ 

Service Programing and Orchestration for Virtualized Software Networks (SONATA)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Virtualisation and software networks are a major disruptive technology for communications networks, enabling services to be deployed as software functions running directly in the network on commodity hardware. However, deploying the more complex user-facing applications and services envisioned for 5G networks presents significant technological challenges for development and deployment. SONATA addr ...
Voir le projet

 17

 TERMINÉ 

Enforceable Security in the Cloud to Uphold Data Ownership (ESCUDO-CLOUD)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Cloud computing is increasingly a necessary strategical ICT infrastructure component for European companies to successfully compete in the world-wide economy. The advantages of renting ICT infrastructures, platforms, and services, with easy access to scalability and elasticity, are driving an ever accelerating transfer toward the cloud of data and applications. Unfortunately, such a convenience co ...
Voir le projet

 9

 TERMINÉ 
Despite the potential benefits of public cloud services (i.e. lower CAPEX, improved functionality/scalability, reduced TCO for ICT), their penetration within public sector organizations is still low, which is a lost opportunity in an era where public bodies are under pressure to operate with constrained ICT budgets. The main goal of STRATEGIC is to facilitate organizations (notably public bodies) ...
Voir le projet

 9

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 
The COCONUT proposal aims at the definition, study and realization of a new fully scalable optical access network significantly extending the network dimensions in terms of bandwidth utilization, reach and number of accommodated users. The envisioned access network evolves from the almost-commercial WDM-PON architecture to the realisation of the Ultra-Dense WDM solutions, opening the way to the "w ...
Voir le projet

 8

 TERMINÉ 

Trilogy 2: Building the Liquid Net (Trilogy 2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

This Trilogy 2 project is a 3-year Small or medium-scale focused research project (STREP) targeting Challenge 1 of the 7th FrameworkProgramme: "Pervasive and Trusted Network and Service Infrastructures".The project scope lies entirely within Objective 1.1, "Future Networks"and in particular in bullet c) Novel Internet architectures, management and operation frameworks.The aim of the project is to ...
Voir le projet

 11

 TERMINÉ 

Reducing Internet Transport Latency (RITE)

Date du début: 1 nov. 2012, Date de fin: 30 nov. 2015,

The present Internet limits the performance of applications that need real-time interaction. In part this is because the design of the network has been optimised to boost throughput, maximising efficiency for bulk applications. There is evidence that large buffers throughout the network have added to the end-to-end latency, with excessive delays severely impacting the quality experienced by users. ...
Voir le projet

 9

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

Leone: From global measurements to local management (LEONE)

Date du début: 1 sept. 2012, Date de fin: 30 avr. 2015,

The Leone project is a 30-month long STREP targeting "Future Networks" within the 7th Framework programme. The project addresses "Novel Internet architectures, management and operation frameworks".The goal of the Leone project is to research and develop an innovative network management framework that has two novelties:• It is focused on Quality of Experience: Probes sited alongside end use ...
Voir le projet

 10

 TERMINÉ 

Video Communications for Networked Communities (Vconect)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

The inability to discover the conversations that matter, to understand how others are feeling, to recognise a friend in need, to share the joy of someone happy, or to see how certain things should be done, are common limitations of social networks. All these require people to be able to see and hear each other. Vconect targets this space by aiming to develop capabilities that will allow ad-hoc gro ...
Voir le projet

 9

 TERMINÉ 

MIRROR - Reflective Learning at Work (MIRROR)

Date du début: 1 juil. 2010, Date de fin: 30 juin 2014,

Description MIRROR will develop technologies that are integrated in the daily work environment of employees to support learning-on-the-job and experience sharing through reflection.Due to the dynamics in business environments and the large number of changes in job roles and tasks for employees, a time-consuming development of formal learn ...
Voir le projet

 15

 TERMINÉ 

Optimized Infrastructure Services (OPTIMIS)

Date du début: 1 juin 2010, Date de fin: 31 mai 2013,

With the challenges of service and infrastructure providers as the point of departure, OPTIMIS focuses on open, scalable and dependable service platforms and architectures that allow flexible and dynamic provision of advanced services.The OPTIMIS innovations can be summarized as a combination of technologies to create a dependable ecosystem of providers and consumers that will be the foundation of ...
Voir le projet

 16

 TERMINÉ 
iNTeg-Risk is a large-scale integrating project aimed at improving the management of emerging risks in the innovative industry. This will be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will red ...
Voir le projet

 67

 TERMINÉ 

Economics and Technologies for Inter-Carrier Services (ETICS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

ETICS aims at creating a new ecosystem of innovative QoS-enabled interconnection models between Network Service Providers allowing for a fair distribution of revenue shares among all the actors of the service delivery value-chain. To this end, we will propose and analyze new business and regulatory models for converged infrastructures, taking into account applications' QoS constraints and incentiv ...
Voir le projet

 18

 TERMINÉ 

Quality of Service and MObility driven cognitive radio Systems (QoSMOS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

QoSMOS is a 3-year Integrated Project that aims at researching, developing and integrating a Cognitive Radio (CR) framework to enable mobile broadband systems to improve utilisation of licensed and/or unlicensed bands, by adding dynamic exploitation of under-utilised spectrum. The technical focus is on opportunistic use of spectrum combined with managed Quality of Service (QoS) and seamless mobili ...
Voir le projet

 15

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Quantitative Assessment of Secondary Spectrum Access (QUASAR)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The need for the radio spectrum for the rapidly growing broadband access services is evident. Abundant and fast access to spectrum has three main advantages: it fosters rapid innovation in wireless systems and services lowering entry barrier on the market; it enables affordable mobile broadband access to all; and makes new energy efficient wireless systems possible. Secondary use of already lice ...
Voir le projet

 11

 TERMINÉ 

Together Anywhere, Together Anytime (TA2)

Date du début: 1 févr. 2008, Date de fin: 31 mars 2012,

How can technology help to nurture family-to-family relationships? This is the question asked by the collaborative project "Together Anywhere, Together Anytime" (TA2).For many people, families form the key social unit. Many of our enduring experiences, holidays, celebrations and moments of fun and laughter are framed as family events. This is something that current technology does not address well ...
Voir le projet

 14

 TERMINÉ 
The general objective of this Thematic Network (TN) is to foster and promote large-scale integration of domestic and distributed micro generation and improve energy efficiency through the implementation of innovative ICT solutions into local smart power grids.The TN will bring together key relevant players in the telecommunications and energy sector. They will overview and provide insight of exist ...
Voir le projet

 15

 TERMINÉ 

Service Oriented Architectures for All (SOA4ALL)

Date du début: 1 mars 2008, Date de fin: 30 avr. 2011,

Description Towards a Web of billions of servicesComputer science is entering a new generation, a generation that starts by abstracting from software and hardware components and sees all resources as services in a service-oriented architecture (SOA). With this in mind, the aim of SOA4ALL is to create a 'web of billions of services' and he ...
Voir le projet

 24

 TERMINÉ 
This Trilogy proposal is for a 3-year Integrated Project targeting Challenge 1 of the 7th Framework Programme: "Pervasive and Trusted Network and Service Infrastructures". The project scope lies entirely within Objective 1.1, "The Network of the Future".The aim of the project is to develop new solutions for the control architecture of the Internet that remove the known and emerging technical defic ...
Voir le projet

 12

 TERMINÉ 

ACTIVE: Enabling the Knowledge Powered Enterprise (ACTIVE)

Date du début: 1 mars 2008, Date de fin: 28 févr. 2011,

Description Effective means for supporting the productivity of knowledge workersACTIVE technology aims at increasing the productivity of knowledge workers through tools that leverage hidden factual and procedural knowledge. The project will advance research and integrate technologies to realise the vision of an integrated and contextualis ...
Voir le projet

 12

 TERMINÉ 

Managing Assurance, Security and Trust for sERvices (MASTER)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2011,

The business of the future will be characterized by highly dynamic service-oriented architectures where outsourcing and distributed management constitute the norm rather than the exception with an increasing complexity in security and trust requirements from regulations and business standards. Best-effort security will no longer be accepted and business entities will have to provide certified ass ...
Voir le projet

 15

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 

Dynamic Personalization of Multimedia (MyMedia)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

MyMedia addresses the key social problem of what has been called the "Crisis of Choice", the problem of information overload. We want to increase the level of relevant content over the "noise". The problem worsens year-by-year as more and more content, including self-created content, becomes available online as well as through traditional broadcast means (delivered through satellite, over-the-air ...
Voir le projet

 7

 TERMINÉ 

CARrier grade MEsh Networks (CARMEN)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

CARMEN, CARrier grade MEsh Networks, will study and specify a wireless mesh network supporting carrier grade triple-play services for mobile/fixed network operators. Future operator networks will be comprised of a common core network and several access networks, and the CARMEN access network will complement other access technologies by providing a low cost and fast deployment mesh network access t ...
Voir le projet

 9

 TERMINÉ 

Publish-subscribe Internet Routing Paradigm (PSIRP)

Date du début: 1 janv. 2008, Date de fin: 30 sept. 2010,

Despite its success, the Internet suffers from several shortcomings, forcing a fundamental reform of its paradigms and core technologies. A major flaw in the design of the Internet is its imbalance of powers in the favour of the sender of information. The network accepts anything that the sender wants to send and will make a best effort to deliver it to the receiver. This has led into increasing p ...
Voir le projet

 8

 TERMINÉ 

NESSI Open Framework - Reference Architecture (NEXOF-RA)

Date du début: 1 mars 2008, Date de fin: 31 juil. 2010,

Description NEXOF-RA aims to build the Reference Architecture for the NESSI Open Service Framework (NEXOF) by leveraging research in the area of service-based systems.The primary objective of NEXOF-RA is to build the Reference Architecture for the NESSI Open Service Framework (NEXOF) by leveraging research in the area of service-based sys ...
Voir le projet

 20

 TERMINÉ 

Ethernet Transport Networks, Architectures of Networking (ETNA)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

Description Ethernet Transport Networks, Architectures of NetworkingMain Objectives“Low cost, scalable and efficient networks will make it possible to develop a wide range of innovative applications, and generate new opportunities for high value products and services.”Most of today’s European communications transport networks are based on ...
Voir le projet

 7