Rechercher des projets européens

24 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Brighter neighborhood

Date du début: 30 nov. 2013, Date de fin: 30 déc. 2014,

The project "Brighter neighborhood" is implemented by two partners, Lithuania and Poland cross - border region, Alytus and Elk town municipalities. The main problem to be solved with the help of the project - to improve border towns of energy efficiency. The main objective of the project - improving energy efficiency in Alytus and Elk, replacing old street lamps with new economic lamps. The genera ...
Voir le projet

 2

 TERMINÉ 

Improvement of energy efficiency of educational buildings in the cross-border region

Date du début: 30 nov. 2013, Date de fin: 30 déc. 2014,

...on level in the cross-border region. The subject of the project is the thermal efficiency improvement of three schools: the School Complex No. 8 in Suwalki (PL), Dailes School and Volunges School in Alytus (LT). The thermal efficiency improvement of the public buildings will contribute to the environmental protection and preservation of the heritage of the natural environment in the cross-border ...
Voir le projet

 2

 TERMINÉ 

Development of sports and culture infrastructure in Lithuania – Poland cross border

Date du début: 31 août 2013, Date de fin: 30 déc. 2014,

...ct is seeking to encourage Lithuanian and Polish cross-border youth communication and cooperation in the sports and culture area. In order to seek this goal there will be built 3 floor sports hall in Alytus with the ground floor for 14 person locker-room women and men, showers, room for cyclists, coach room, hall; in the first floor balcony for audience 199 places; in the second floor 10 double ro ...
Voir le projet

 3

 TERMINÉ 

Development of cross-border tourism in Elk and Alytus

Date du début: 1 déc. 2013, Date de fin: 30 déc. 2014,

The aim of the project "Development of the cross-border tourism in Ełk and Alytus" is increase of the tourism attractiveness in Ełk and Alytus through development of public squares in the city, renovation of the basement in the culture house in Alytus, preparation of the Ełk and Alytus International Tourism Development Strategy, issue a cross-border book with places of interest and maps promoting ...
Voir le projet

 2

 TERMINÉ 

d environment – healthy young generation (ILPR.01.01.00-28-072/10-00)

Date du début: 13 juil. 2012, Date de fin: 12 juil. 2014,

The overall idea of the project is to contribute to reduction of the consumption of non-renewable energy sources in the border area. Expected Results: 1. Increasing the knowledge and skills about energy saving among citizens l ...
Voir le projet

 3

 TERMINÉ 

CLEAN WATER AND ENVIRONMENT - HEALTHY SOCIETY (LT-BY) (CleanWater(LT-BY))

Date du début: 31 déc. 2012, Date de fin: 30 mars 2014,

Current situation in water supply and sewerage networks in Alytus and Grodno is complex. In Grodno city and Alytus the number of water pipeline and sewerage network accidents is big. The numbers clearly show the need for water supply and sewerage system accidents prevention increase. It also reflects the necessity to decrease pollution from economical activities (sewerage infiltration) and to mana ...
Voir le projet

 3

 TERMINÉ 
The milestone of the project is to develop existing sports facilities while using renewable energy sources and integration of children and youth of Ełk and Alytus through sports activities. The project output will serve communities on both sides of the border as it will increase the access of community to sports infrastructure. The partners also foresee positive impact for region investment attrac ...
Voir le projet

 3

 TERMINÉ 

Let's learn from each other.

Date du début: 31 août 2012, Date de fin: 27 févr. 2014,

... Expected Results: The activities involve the modernisation of school buildings in Giżycko and Alytus, purchase of teaching equipment for the school in Giżycko, improvement of teaching techniques and methods, and finally organization of numerous events: 2 meetings on the modernisation and energy ...
Voir le projet

 3

 TERMINÉ 
This project is a continuation of other successful activities implemented in the field of arrangement of public industrial infrastructure (both physical and informational): in 2008 partners jointly prepared the technical documentation for infrastructure improvement of industrial areas, in 2011 continued their cooperation and shifted all activities from paper to reality. As the third stage partners ...
Voir le projet

 2

 TERMINÉ 
In the frame of the project 2 amphitheatres in Ełk and Alytus will be built. These objects will be used for the cross-border cooperation in the field of culture, tourism and sustainable development. The publication of The Cross-border Culture Catalogue, which is planned to be produced in the frame of this project, will serve as a guidebook for the joint tourism and cultural offers of partner regio ...
Voir le projet

 4

 TERMINÉ 
The overall objective of the project was to create favourable conditions for business development in Alytus and Suwałki by strengthening business environment, improving competition level and the growth of export potential by improving public infrastructure and information activity – issuing publications, participation in international exhibitions, arrangement of conferences about attractive invest ...
Voir le projet

 2

 TERMINÉ 
The project included a lot of activities contributing to the achievement of the main aim, which was the protection of air quality in the Lithuanian-Polish borderline region. Achievements: The realization of the project helped to reduce energy consumption in educational ...
Voir le projet

 2

 TERMINÉ 

CROSS-BORDER SPORT-YOUTH EXCHANGE

Date du début: 31 déc. 2008, Date de fin: 30 déc. 2009,

The project was developed in cooperation between the Polish partner Rodowo Foundation and the Lithuanian organisation Alytus Sport and Recreation Centre. The fundamental aims of the project were strengthening social relations between local societies on both sides of the Polish-Lithuanian border, developing cooperation networks in the field of youth and sport exchanges, developing cross-border yout ...
Voir le projet

 3

 TERMINÉ 

Innovation Circle (IC)

Date du début: 31 janv. 2005, Date de fin: 30 oct. 2007,

In many European countries urban areas are magnets that attract people from villages, smaller towns and rural districts because cities offer more hope for jobs, education, cultural and leisure activities, health care and better living standards. At the same time rural areas and small towns located far from the large cities or other growth centers face: downsizing and ageing population; out-migrati ...
Voir le projet

 16

 TERMINÉ 

The PIPE project (PIPE )

Date du début: 31 mai 2002, Date de fin: 29 sept. 2004,

The PIPE project was aiming at demonstrating a holistic approach towards territorial development with a particular focus on engaging the young generation.Participation – Identity – Planning - Entrepreneurship are 4 key elements in development strategies for smaller and medium sized communities and regions located in the periphery. The PIPE project was aiming at demonstrating a holistic approach to ...
Voir le projet

 9

 TERMINÉ 
The overall objective of the project is to improve the image of the Lithuanian, Polish and Russian parties of the Euroregion Nemunas. In order to promote their region, the partners should launch the e-news agency, publish 13 magazines, and organise a number of common meetings and conferences.
Voir le projet

 10

 TERMINÉ 
The project partners established the Renewable energy educational centre in Gizycko and the Energy efficiency laboratory in Alytus and provided them with modern energy metering equipment and devices, as well as installed solar heaters for practical application, demonstration and education. Also, the energy efficiency audit was carried out in several public buildings of Alytus and one energy-saving ...
Voir le projet

 4

 TERMINÉ 
Project aims at developing favourable conditions for business growth in Alytus and Suwalki cities by strengthening business environment, improving the level of competition, increasing export and improving industrial zones infrastructure. Technical documentation, topographical photos, detailed plans for the industrial zones development shall be prepared and lead to 3 investment projects.
Voir le projet

 3

 TERMINÉ 
The objective of the project is to support the cultural and historical development of borderland cities.Direct objectives:- promoting the idea about European integration,- enrichment of cultural offer through underlining partnership,exchanges and promotion of local artistic groups.
Voir le projet

 3

 TERMINÉ 
Project aims at increasing security of tourists in the territory of Lithuania and Poland. In places of interest cameras shall be installed to reduce criminality and make regions more attractive for tourists.
Voir le projet

 10

 TERMINÉ 
General purpose of this project is to establish the network in the field of cultural relations and visual arts between Alytus and Suwalki cities for the artist cooperation; this would improve cultural environment of city dwellers, the image of the region, and preserve national cultural identity at the same time.Proximate objectives are:To establish the network of cultural communication in the fiel ...
Voir le projet

 2

 TERMINÉ 
...imulate economic and scientific co-operation among the border-regions of Euroregion "Nemunas-Niemen-Neman". Specific aims of the project are establishing co-operation network of young scientists from Alytus, Suwalki, Marijampole— and Chernyakhovsk in order to foster sustainable development of the region; to elaborate the colleges-co-operation strategy in order to strengthen their position in resea ...
Voir le projet

 11

 TERMINÉ 
General objective of the project is to develop co-operation of the countries in order to stimulate investments, to improve business environment, to increase competitiveness and productivity in Euroregion Nemunas.The main activities consist of:1. Preparing possibility study of investment stimulation of industrial areas and green fields in Euroregion Nemunas. ...
Voir le projet

 10

 TERMINÉ 
Social services are often delivered at the local level, as local institutions are thought of being in position of having more specific knowledge of local conditions and, therefore, can respond more directly to local needs. According to EU, for such a response, social services must be comprehensive and personalised, conceived and delivered in an integrated manner. This integration involves not only ...
Voir le projet

 7