Rechercher des projets européens

29 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ROS-Industrial quality-assured robot software components (ROSIN)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

...ated code quality testing led by IT University Copenhagen, complemented with a full palette of quality assurance measures including novel model-in-the-loop continuous integration testing with ABB robots. Simultaneously, more ROS-Industrial tools and components will be created by making 50% of the ROSIN budget available to collaborating European industrial users and developers for so-called Focused ...
Voir le projet

 7

 TERMINÉ 
Machine learning have revolutionized the way we use computers and is a key technology in the analysis of large data sets. The FUDIPO project will integrate machine learning functions on a wide scale into several critical process industries, showcasing radical improvements in energy and resource efficiency and increasing the competitiveness of European industry. The project will develop three large ...
Voir le projet

 11

 TERMINÉ 

PROMOTioN - Progress on Meshed HVDC Offshore Transmission Networks (PROMOTION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance componen ...
Voir le projet

 35

 TERMINÉ 
The European robotics industry is moving towards a new generation of robots, based on safety in the workplace and the ability to work alongside humans. This new generation is paramount to making the factories of the future more cost-effective and restoring the competitiveness of the European manufacturing industry. However, the European manufacturing industry is facing the following challenges: (1 ...
Voir le projet

 18

 TERMINÉ 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Voir le projet

 39

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Smart Assembly Robot with Advanced FUNctionalities (SARAFun)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

While Industrial robots are very successful in many areas of industrial manufacturing, assembly automation still suffers from complex time consuming programming and the need of dedicated hardware. ABB has developed FRIDA (Friendly Robot for Industrial Dual Arm Assembly), a collaborative inherently safe assembly robot that is expected to reduce integration costs significantly by offering a standard ...
Voir le projet

 7

 TERMINÉ 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Voir le projet

 17

 TERMINÉ 
The DISIRE project has been inspired by the real existing needs of multiple industrial sectors, including the world leading industrial partners in the non-ferrous, ferrous, chemical and steel industries that are highly connected and already affiliated with the SPIRE PPP and its objectives. The overall clear and measurable objective of the DISIRE project is to evolve the existing industrial process ...
Voir le projet

 15

 TERMINÉ 

Security for smart Electricity GRIDs (Segrid)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

SEGRID’s main objective is to enhance the protection of smart grids against cyber-attacks. We do this by applying a risk management analysis approach to a number of smart grid use cases (the SEGRID use cases), which will define security requirements and determine gaps in current security technologies, standards and regulations. The identified gaps and the analysis itself will give input to the enh ...
Voir le projet

 12

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Cross-Layer Early Reliability Evaluation for the Computing cOntinuum (CLERECO)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Advanced multi-functional computing systems realized in forthcoming manufacturing technologies hold the promise of a significant increase in device integration density complemented by an increase in system performance and functionality. However, a dramatic reduction in single device quality and reliability is also expected.CLERECO research project recognizes early accurate reliability evaluation a ...
Voir le projet

 11

 TERMINÉ 

From education to the labour market

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

The project's overall objective is to ensure that students, teachers and education managers achieve subject-related and intercultural competence through an individually planned and qualitative cooperation with the international partners. With this project we aim to help strengthen our VET-students' progress from being a student to enter the labour market by giving them access to practice-oriented ...
Voir le projet

 10

 TERMINÉ 
As the patterns of power generation and distribution are rapidly changing in Europe towards a highly dispersed and volatile system, Distribution System Operators need to completely change traditional ways of grid operations. Currently developed solutions to increase the intelligence of medium and low voltage grids to cope with this task are often highly specialized, non-replicable and therefore no ...
Voir le projet

 13

 TERMINÉ 
The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only these eco-efficient mines will contribute to improved access to domestic mineral resources, secure the supply of mineral raw materials for Europe and reduce the import dependency.IntelliMine will contr ...
Voir le projet

 27

 TERMINÉ 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Voir le projet

 28

 TERMINÉ 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Voir le projet

 15

 TERMINÉ 
"HERCULES was conceived in 2002 as a long-term R&D Programme, to develop new technologies for marine engines. It is the outcome of a joint vision by the two major European engine manufacturer Groups MAN & WARTSILA, which together hold 90% of the world’s marine engine market.The present proposed HERCULES-C project is the Phase III of the HERCULES Programme. In order to take marine engine technology ...
Voir le projet

 23

 TERMINÉ 
This project aims at improving the operational efficiency of large-scale dynamic plants as found in petrochemical, chemical and other process industries. Costs related with industrial implementation of current model-based operation support systems, like Model Predictive Control, Real-Time Optimization and soft-sensors for these complex processes are currently very high. Moreover it is widely recog ...
Voir le projet

 7

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 
Description Developing "human-centric" technology for industrial robots Robots for industrial production still need a lot of skilled engineering effort for installation, setup and programming. They also require closed-ended environments, with physical protection devices to separate them from human ...
Voir le projet

 8

 TERMINÉ 

Infrastructure Roadmap for Energy Networks in Europe (IRENE-40)

Date du début: 1 sept. 2008, Date de fin: 31 oct. 2012,

The IRENE-40 project will identify strategies for investors and regulators to build a more secure, ecologically sustainable and competitive European electricity system. The strategies will be presented in a roadmap, i.e. a timeline with actions and a description of development stages towards future electricity networks over the coming 40 years. It will provide investment strategies for the indivi ...
Voir le projet

 9

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 
"The interstate integration of power grids provides multiple advantages concerning operation security, integration of renewable energy as well as energy trading. Due to this fact the UCTE interconnection expands continually since its establishment. Consideration is given to different scenarios of joint operation of UCTE and NORDEL with power grids on the territory of the former USSR. Due to the fa ...
Voir le projet

 22

 TERMINÉ 

HIGHER-EFFICIENCY ENGINE WITH ULTRA - LOW EMISSIONS FOR SHIPS (HERCULES-B)

Date du début: 1 sept. 2008, Date de fin: 31 déc. 2011,

"The project HERCULES-B is the Phase II of the HERCULES programme, conceived in 2002 as a 7-year strategic R&D Plan, to develop the future generation of optimally efficient and clean marine diesel powerplants. The project is the outcome of a joint vision by the two major European engine manufacturer Groups, MAN Diesel and WARTSILA, which together hold 90% of the world’s marine engine market. The r ...
Voir le projet

 32

 TERMINÉ 
Society is increasingly dependent on the proper functioning of the electric power system, which in turn supports most other critical infrastructures: water and sewage systems; telecommunications, internet and computing services; air traffic, railroads and other transportation. Many of these other infrastructures are able to operate without power for shorter periods of time, but larger power outage ...
Voir le projet

 10

 TERMINÉ 

Active distribution network (ADINE)

Date du début: 1 oct. 2007, Date de fin: 30 sept. 2010,

Considerable amount of renewable energy in Europe represents distributed generation (DG). One of the main barriers for the penetration of DG at distribution network level is the complexity of the interconnection of DG. The overall aim of the ADINE-project is to develop, demonstrate and validate a new Active Network Management (ANM) method of distribution network including DG and enabling solutions ...
Voir le projet

 7

 TERMINÉ 

Eco-Efficiency evaluation of new and existing products (DANTES) (Dantes)

Date du début: 1 sept. 2002, Date de fin: 1 sept. 2005,

Background Over the past ten years, a number of environmental tools have been developed for the purpose of monitoring and controlling the environmental impact of industrial activities and that of separate products or product groups. Examples of such tools include risk assessment, life-cycle assessment (LCA), life-cycle cost (LCC), design for environment ...
Voir le projet

 4