Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

The Missing 99

Date du début: 3 mars 2015, Date de fin: 2 sept. 2018,

The Missing 99 (production title) is a stylish, modern adventure game about Robert Capa’s life and work in the Western Fronts of World War II. The game is not only a sheer example of the new generation of mobile adventure game, it has a strong cultural and historical value for a wider audience. We believe a game is a most suitable way to tell a story about our common history for a younger generat ...
Voir le projet

 1

 TERMINÉ 
One of the most widespread social phenomena that we witness nowadays is the emergence of collective action movements in which low-status groups mobilize in order to trigger social change (e.g. Arab Spring, Indignados, the Occupy Movement). Interest in collective action has mushroomed in the last decade, as confirmed by the fact that from the 1602 hits found in Psycarticles using the “collective ac ...
Voir le projet

 1

 TERMINÉ 

SME's tool to prevent burnout

Date du début: 1 déc. 2016, Date de fin: 31 mai 2019,

...resilience, framework - to give some background about burnout and resilience, and a gudelines for workshop in the elearning (m- learning) format. The project target group is SMEs sector (almost 99% of companies in Europe are SMEs.) , owners, managers ,as this sector often do not have enough financial resourses to organize trainings and is at risk of being left without support. Each partner will ...
Voir le projet

 5

 TERMINÉ 
Background Copper is a raw material of high economic importance in the EU. While the world’s largest copper reserves are found in the Americas (Chile, USA, Peru and Mexico), Europe has significant deposits in Poland. EU-27 production of copper was 814 277 tonnes in 2010, but this is not sufficient to meet EU demands. Copper mining and refining is highly ...
Voir le projet

 2

 TERMINÉ 

Bissap be cool

Date du début: 1 juin 2015, Date de fin: 31 janv. 2017,

The Bissap is the traditional drink in Senegal. Made of red flowers of Ibiscus, this beverage is drinked cold during the summer with friends and family. The associations of Le Créneau and Teraanga are working together to built connexions between the village of Nguekokh in Senegal and the local community in France. The aims of this partnership are to increase the mutual understanding between the 2 ...
Voir le projet

 4

 TERMINÉ 
... full capacity and results met or exceeded all specific objectives except energy recovery - attributed to constituents of the feed. The process delivered a pathogen kill capacity of 99.9999%, a figure so high that the main problem was accurately monitoring such a rate. Because secondary digesters were not required, the process time of between 10.2 and 16.8 days was two to three times faster than ...
Voir le projet

 2

 TERMINÉ 

SCHOOL IN MOVEMENT: enjoying wealth being in good health!

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

Our project takes place in a context of modern industrial societies where more and more young people suffer from problems related to rapid growth, sedentary life, drug and alcohol abuse, feeding disorders. This European project aims to make participants aware of these problems, mitigate the adverse effects of unhealthy habits, improve their lifestyle and prevent future pathologies; educate them, ...
Voir le projet

 4

 TERMINÉ 

Genetics of High Cognitive Abilities (GHCA)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2017,

"Although there are many types of cognitive ability, they correlate substantially; general cognitive ability (g) indexes this covariance and is an important predictor of many key life outcomes. The PI’s 40-year programme of research has contributed to a once controversial finding that is now widely accepted: Individual differences in g are substantially influenced by genes, as well as the environ ...
Voir le projet

 1

 TERMINÉ 

Open up entrepreneurship

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

Internet and the WWW is changing our lives: the way we communicate, work, shop, socialise, play and educate. Digital technologies also reshape traditional industries and totally transform the business environment. They speed up and improve the way new innovative products and services are produced and accessed. ICT is also changing the very nature of consumption, competition and how markets operat ...
Voir le projet

 5

 TERMINÉ 

Internationaliseringsproject Reformatorisch Primair Onderwijs Urk

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

If reformatory schools in Urk (a place where 99% of the children speak dialect and their inherent no television), we have a big disadvantage compared to the national average in terms of English. The teachers give for most English classes in Dutch. We want to give a huge boost to the English in our schools to prevent failure in secondary education and children get more into contact with internation ...
Voir le projet

 1

 TERMINÉ 
The project aim is to enhance the competitiveness of international SMEs by assisting them to identify language and culture barriers which arise from cross-border trade. The following objectives will be implemented: 1) To pilot a European communication audit and language auditor training scheme (ECLAT) in Latvia and Bulgaria based on models developed in the previous PROTOCOL (UK/99/1/077159/PI/III. ...
Voir le projet

 5

 TERMINÉ 

Hungarian forest fire prevention and training program (FIRELIFE)

Date du début: 1 juil. 2014, Date de fin: 30 juin 2018,

... Hungary. It aims to provide targeted information and messages on the basis of an up-to-date communication framework plan. Some target groups will be involved more deeply through personal contact. As 99% of forest fires are caused by human activity in Hungary, targeted and instant communication can effectively cut the number of forest fires. In order to extend the range of available communicatio ...
Voir le projet

 1

 TERMINÉ 
... 17% of the chemical oxygen demand (COD). Objectives The overall objective of the project was to contribute to a 99% reduction of formaldehyde (HCHO) in industrial wastewater streams using a process reliant upon the formose reaction. This chemical reaction, by which formaldehyde is converted to sugars, was first repor ...
Voir le projet

 1

 TERMINÉ 

SKILLS+ - Soft skills development programme for micro-companies in ICT sector

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

Over 99% of ICT firms in Europe are SMEs, of which about 90% are micro-sized companies with 1-9 employees. It's hard to overemphasize their importance to the sector and economy in general, but at the same time there is much to be done to improve competitiveness and sustainability of these micro-businesses. While most of them possess strong technical or so-called hard skills, the soft skills are mu ...
Voir le projet

 6

 TERMINÉ 
To contribute the readiness to the emergency situation in the medicine sphere in the cross-border area of Bukovyna and Moldova. Expected Results: Purchased equipment for the Novoselytsya district central hospital, Zastavna dis ...
Voir le projet

 5

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

This is a Mobility project for HE students and staff with programme countries. The figures for outgoing students are for SMS: 218 and SMP:99, which makes 317 student mobility periods in total. That is 15 students more than last year, in other words ca 5% increase. The corresponding outgoing staff figures are as follows: STA: 55 and STT: 38, which makes 93 staff mobility periods in total. That is a ...
Voir le projet

 1

 TERMINÉ 

Speciális szakiskolai tanulók szakmai gyakorlata Erdélyben

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The Nyírbátori Éltes Mátyás Primary School, Special Vocational School, Children Home, Dormitory and Pedagogical Services began operating in the school year 1977/78 and still mainttained by Klebelsberg Intézményfenntartó Központ. Currently there are 99 students in our special school. This is due to countinuous development of number and quality of our training provision.Our trades: park keeper, pain ...
Voir le projet

 2

 TERMINÉ 

Ultra Legionella Inmunoanalysis System for Early Sensing (ULISENS)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2015,

...ed on information and communication technologies to minimise the time for obtaining results. ULISENS will have the following functionalities:- Faster response time, with a time reduction of up to 99% compared with standard laboratory tests (1h vs 288h)- Greater reliability thanks to the certified detection and enumeration technology (accuracy of detection higher than 99%)- Lower cost, with reduct ...
Voir le projet

 1

 TERMINÉ 

Business Environment – sustainable promotion and development

Date du début: 29 août 2013, Date de fin: 28 déc. 2014,

The increase and the expanding of cross border cooperation between the institutional actors of Galati, Romania, Cahul, the Republic of Moldova and Odessa, Izmail, Ukraine with responsibilities in the economic regional development. Expected R ...
Voir le projet

 6

 TERMINÉ 
.... approximately 1 A/cm2 with water utilisation >60% and a stack efficiency > 90%). These operation points and degradation values will yield an efficiency of up to 80% (LHV) at the system level with >99% availability. Cost issues will also be addressed by considering cost effective materials and processes in order to meet the “non energy” 1€/kg H2 target."
Voir le projet

 7

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

Moholy-Nagy University of Art and Design, Budapest (MOME) has joined to the European Union’s Erasmus programme in 1998/99. Our primary objective is the development of the quality of training, learning and research in the area of creative activity. Our university strives to implement the mixed model of internalization involving as many academic staff and industrial professionals as possible. The m ...
Voir le projet

 1

 TERMINÉ 

SMEs & eLEARNING

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...est advantage to ensure acceptance by the Managers and workforce. Throughout Europe SMEs are increasingly important to the economic well being of the EU. It is estimated that they account for 99% of all business with 42% of all turnover. Meeting the training needs of SME employees/managers is a challenge that requires review; their very survival may depend on an appropriately trained workforce. E ...
Voir le projet

 8

 TERMINÉ 

Profissionais para a Europa

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This is a two year-project, from 09/2015 to 09/2017 and is related to the school internationalization policy with the following main objectives: -improving the level of basic and soft skills, with special relevance in the world of work and its contribution to social cohesion, especially between the world of education, training and work; -to promote transnational cooperation between education and t ...
Voir le projet

 3

 TERMINÉ 

Act for your Community! Training on community development

Date du début: 1 mai 2015, Date de fin: 30 juin 2016,

This is a Key Action 1 project devoted to community development. As such, the project will promote and empower participants with new competencies focusing on active participation. We see our communities as a wide spectrum of people of different levels of education, experience, and age. This is why we propose an innovative approach to community development, focusing on three different pillars. The ...
Voir le projet

 11

 TERMINÉ 
CO2 emissions are growing extremely fast in Rapidly Developing Countries, which will account for 99% of the global emissions increase by 2035 (BP 2014). Energy demand is set to increase by 75% by 2035 and (if no change incurs) will largely depend on fossil fuels (IEA 2013). In response to these concerns, Rapidly Developing Countries are currently seeking to tap its vast renewable energy potential ...
Voir le projet

 1

 TERMINÉ 

SME and Higher Education Institutes in Innovation Partnerships

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2016,

...ate knowledge that could spur innovation (HEIs), and those who can translate that knowledge into marketable strategies and use it to produce economic growth (SMEs). Since the SME sector accounts for 99% of all businesses, provides two thirds of private sector jobs and contributes more than half of the total value-added created by businesses in the EU, the implementation of greater innovation in S ...
Voir le projet

 9

 TERMINÉ 
... The main objective of the LIFE-PURIWAT project is to design and development a pilot plant, with a treatment capacity of 5000 dm3 per hour, which will be able to remove between 97% and 99% of hydrocarbons, oil and fats from wastewater, thereby satisfying the requirements of current European directives (91/271/EC and 2000/60/EG). The project’s pilot plant will use a filter with a ...
Voir le projet

 4

 TERMINÉ 
...t followed by a plasma torch treatment to extract silicon metal. It tested the plant on contaminated sediments dredged from the port of Ravenna, successfully demonstrating the possibility to turn 99% of the dredged volumes into secondary raw materials. It proved the efficiency of the plasma treatment in separating silicon - in particular valuable Ferrosilicon – from the sediment and the efficie ...
Voir le projet

 8

 TERMINÉ 
Vor dem Hintergrund eines notwendigen Systemwandels in Europas Wirtschaft - regionale Wirtschaftskreisläufe statt Auslagerung nach Fernost / sinnvolle Wiederverwendung betrieblicher Reststoffe statt Verschwendung von Ressourcen - findet ein Umdenkprozess in Wirtschaft und Politik statt. In Österreich sind es Unternehmen die gesellschaftliche Verantwortung übernehmen (CSR), in Ungarn ist es besonde ...
Voir le projet

 9

 TERMINÉ 

Accelerating Cross-Border Transaction of SME

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

BACKGROUND SMEs are a vital for economic growth and employment, representing 99% of EU economy and generating more than 50% of jobs. SMEs’ full growth potential can only be realized in their integration in international value chains and participation to international markets. Many impediments still undermine the capacity of SMEs to strive internationally, as recognised by EU papers and strategies ...
Voir le projet

 8

 TERMINÉ 
...t in separation methods for electronic assemblies that reduce manual work (>80% automation) as well as in subsequent recovery methods that yield recycled materials of commercial-grade quality (>99-99.99%, depending on the element), apt to fit an industrial context and being environmentally compliant. To this end, (thermal) disconnection methods, part recognition methods and hydrometallurgical refi ...
Voir le projet

 12

 TERMINÉ 

Medieval Jewelleries: Khotyn, Soroca, Suceava, Mejekss

Date du début: 17 mai 2012, Date de fin: 17 mai 2014,

The objective of the project is to increase the competitiveness and attractiviness of the Soroca-Suceava-Khotyn region by implementing in cross-border partnership activities related to enrichment of tourism potential and promotion of common cultural and historical values. Achievemen ...
Voir le projet

 4

 TERMINÉ 
In 2010, there were 285million blind and visually impaired people in the world (a 77% increase from 161million in 2002) and that is a number that is still growing. In line with the European Disability Strategy 2010 – 2020 and to provide a technological solution to help the visually blind increase their level of security and independence, Aticser has been developing a kit of small, assistive device ...
Voir le projet

 1

 TERMINÉ 
...hanges in the aquifer levels have been monitored for many years and reveal severe over-exploitation. This situation represents a quantity and quality risk for groundwater resources, which provide 99% of the drinking water in Gironde. To counteract this, the beneficiary has implemented active water management since the 1990s. A water management scheme had suggested savings were needed of up to 30 ...
Voir le projet

 4

 TERMINÉ 

Discover Informal Education to Reduce Early School Leaving

Date du début: 1 sept. 2014, Date de fin: 1 févr. 2015,

European Union as being the foundation which is very sensitive to the education issue and scientific researches, takes up its position. It maintains all the oppotunities in terms of facilitating the education circumstances which has already had rate of literacy 99,9 %. European Union specified its frame in order to reach the 2020 targets which is determined by The Erasmus + Programme. Accordingly ...
Voir le projet

 8

 TERMINÉ 

TransAgROpolis - TransfROntier AgRObusiness Support

Date du début: 14 févr. 2012, Date de fin: 14 févr. 2015,

The project's objective is the develop the agricultural marketing infrastructure in order to improve the economis performance of the border economy in the inter-regional area. Expected Results: TransAgropolis Agro-industrial P ...
Voir le projet

 7

 TERMINÉ 
...the outlet concentration was consistently below the relevant water quality criteria. Copper was reduced from an average of 310 μg/L down to 4 μg/L, corresponding to an overall removal rate of 99%. Phosphorous was reduced from 0.27 to 0.025 mg/L, corresponding to an overall removal rate of 91%. Tests with iron enrichment of the bottom sediments and the dosing of aluminium to enhance coagulation/ ...
Voir le projet

 5