Rechercher des projets européens

32 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Information and Communication technologies (ICT) and robotics for sustainable agriculture
Voir le projet

 24

 TERMINÉ 
"The increase of the identity theft phenomenon across Europe and its related human and economical impacts is a major concern for all M.S. Several EU initiatives are ongoing to try to curb this concern. Today’s identity can take various forms, either in the “real” world, as a primary identity delivered by a M.S. (passport, ID card, driving license...) but more and more in the “2.0” world (secondary ...
Voir le projet

 12

 TERMINÉ 

Sustainable and robust networking for smart electricity distribution (SUNSEED)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

SUNSEED proposes an evolutionary approach to utilisation of already present communication networks from both energy and telecom operators. These can be suitably connected to form a converged communication infrastructure for future smart energy grids offering open services. Life cycle of such communication network solutions consists of six steps: overlap, interconnect, interoperate, manage, plan an ...
Voir le projet

 9

 TERMINÉ 

Self-Management for Unified Heterogeneous Radio Access Networks (SEMAFOUR)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

The SEMAFOUR project will design and develop a unified self-management system, which enables the network operators to holistically manage and operate their complex heterogeneous mobile networks. The ultimate goal is to create a management system that enables an enhanced quality of user experience, improved network performance, improved manageability, and reduced operational costs. SEMAFOUR aims at ...
Voir le projet

 9

 TERMINÉ 
"The PRISMS project will analyse the traditional trade-off model between privacy and security and devise a more evidence-based perspective for reconciling privacy and security, trust and concern. It will examine how technologies aimed at enhancing security are subjecting citizens to an increasing amount of surveillance and, in many cases, causing infringements of privacy and fundamental rights. It ...
Voir le projet

 8

 TERMINÉ 

Governments ENabled with IPv6 (GEN6)

Date du début: 1 janv. 2012, Date de fin: 31 mai 2015,

...lly in the last 6 months of the project, which are aimed to a targeted European-wide dissemination campaign aimed to the stimulation of the IPv6 take-up in public administrations and other relevant stakeholders (targeted to experts and public authorities).As a practical way to further stress this dissemination, an event will be organized in Brussels together with the EC, and a book with the projec ...
Voir le projet

 20

 TERMINÉ 
iCargo IP aims at advancing and extending the use of ICT to support new logistics services that: (i) synchronize vehicle movements and logistics operations across various modes and actors to lower CO2 emissions, (ii) adapt to changing conditions through dynamic planning methods involving intelligent cargo, vehicle and infrastructure systems and (iii) combine services, resources and information fro ...
Voir le projet

 32

 TERMINÉ 
...f network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support across management domains, and improve security to ensure service integrity and protect network resources. These initiatives will be complemented by the deve ...
Voir le projet

 72

 TERMINÉ 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Voir le projet

 44

 TERMINÉ 
The key objective of the EcoGrid EU project is to demonstrate efficient operation of a distribution power system with high penetration of many and variable renewable energy resources. The demonstration will take place on the Danish island Bornholm with more than 50 % of electricity consumption from renewable energy production.A real-time market concept will be developed to give small end-users of ...
Voir le projet

 17

 TERMINÉ 

SCUBA - Self-organising, Cooperative, and robUst\n Building Automation (SCUBA)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

Large scale embedded Monitoring and Control (M&C) systems in energy management, transporta-tion, security and safety often co-exist alongside each other with little cooperation within and among heterogeneous systems which hampers the increasing demand to operate the whole system optimally. A good example is building management, a market worth in excess of $36 billion annually by 2015, where a wide ...
Voir le projet

 9

 TERMINÉ 

Social Telemedia Environment for Experimental Research (STEER)

Date du début: 1 sept. 2012, Date de fin: 30 nov. 2014,

Social media already influence social relationships thus changing social structure enabled by technological advances. These advances transform the environment(s) we are surrounded by, as they introduce new kinds of interactions between humans and objects. It is therefore natural for users within this emerging social cyberspace to demand the kind of experiences they are accustomed to in their daily ...
Voir le projet

 6

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

...pan all levels of the framework, and consider the ownership and privacy of data, as well as the actual access to objects.The validation of the proposed solution will be carried out by considering relevant Future Internet application areas enabled by the IoT. In particular, the use cases addressed by iCore are the following: ambient assisted living, smart office, smart transportation, and supply ch ...
Voir le projet

 28

 TERMINÉ 

Monitoring Atmospheric Composition and Climate Interim Implementation (MACC II)

Date du début: 1 nov. 2011, Date de fin: 31 juil. 2014,

MACC II (Monitoring Atmospheric Composition and Climate – Interim Implementation) is designed to meet the requirements that have been expressed for prototype operational GMES services for the atmospheric domain. From late-2011 MACC II will continue the operation and development of the GMES service lines established by the MACC project and prepare for its transition in 2014 to become the atmospheri ...
Voir le projet

 39

 TERMINÉ 

Next-Generation Hybrid Broadcast Broadband (HBB-NEXT)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2014,

Description Exploring the Future of Connected TV: HBB-NEXT presents novel applications and innovative research You say “hello” and your TV set knows it’s you; it recommends those programmes which you are interested in. Your wife and children join you – the TV is aware of this change of audience an ...
Voir le projet

 9

 TERMINÉ 

Secure Web OS Application Delivery Environment (webinos)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

The webinos project will define and deliver an Open Source Platform and specific components for the Future Internet, which will enable web applications and services to be used and shared consistently and securely over a broad spectrum of converged and connected devices, including mobile, PC, home media (TV) and in-car units. Promoting a "single service for every device" vision, webinos will move t ...
Voir le projet

 23

 TERMINÉ 

Small Integrated Navigator for PLanetary EXploration (SINPLEX)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2013,

"The main goal of the SINPLEX project is to develop an innovative solution in order to reduce significantly the mass of the navigation subsystem for exploration missions which include a landing and/or a rendezvous and capture or docking phase. It is a contribution to the strengthening of the European position for space exploration. It targets increasing the scientific return of exploration mission ...
Voir le projet

 5

 TERMINÉ 
"Taking benefit from the previous and on-going efforts in the GMES context, the DOLPHIN project intends to develop the key technological and operational gap-filling innovations, leading in the mid-term to a full and sustainable operational exploitation of Earth Observation Satellites capabilities in the EU and MS maritime policies applications.DOLPHIN aims at developing new tools providing effecti ...
Voir le projet

 21

 TERMINÉ 

Future Internet Gateway-based Architecture of Residential Networks (FIGARO)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

...s into the future Internet will spur trans-sector innovation and create new businesses. The project is expected to result in technologies that will strengthen Europe's position and give competitive advantage to European industry in the areas of Future Internet technologies and services, residential gateways and home automation.
Voir le projet

 13

 TERMINÉ 

Collaborative Information Services for Container Management (COMCIS)

Date du début: 1 sept. 2011, Date de fin: 31 août 2013,

"This project is about interoperability between e-freight systems that have been developed in previous EU projects as well as in commercial undertakings. We will therefore show how the following e-freight systems will be integrated: Logit 4SEE (resulting from Freightwise), Smart-CM Neutral Layer and ICS-SEAP (from Smart-CM), SICIS (from Integrity), Port Community Systems (e.g. from Descartes) and ...
Voir le projet

 13

 TERMINÉ 
"VIRTUOSO projects aims at providing European Security stakeholders with a toolkit based on an open-source-software framework and a set of advanced information processing tools. This toolkit will allow building end-user oriented applications: - Ranging from open source collection to decision support - Providing at each step actionable, rated, validated information - Integrated in an open framework ...
Voir le projet

 19

 TERMINÉ 

VOIce-based Community-cEntric mobile Services for social development (VOICES)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2013,

... FP7 Digital World Forum project, makes it clear that realizing the potential of mobile ICT services requires addressing two major types of challenges:1. The leveraging of content that is locally relevant; and2. The removal of a range of access barriers, notably limitations related to access channels, literacy, and languages.VOICES intends to take a major step forward in realizing the potential of ...
Voir le projet

 13

 TERMINÉ 
...een brokers, large producers/consumers and grid operators. Standardisation is pursued throughout the project.The project is led by SAP Research (Germany), a group that is very active in the area of advanced analytics and infrastructure development. SAP Research is associated to SAP, the world's leading provider of BI solutions. With Aalborg Universitet (Denmark), TU Dresden (Germany), and the Jože ...
Voir le projet

 9

 TERMINÉ 
"The main objective of the proposed project GLOWASIS is to pre-validate a GMES Global Service for Water Scarcity Information. In European and global pilots on the scale of river catchments, it will combine in-situ and satellite derived water cycle information and more government ruled statistical water demand data in order to create an information portal on water scarcity. This portal will be made ...
Voir le projet

 11

 TERMINÉ 
...rnet. The intelligence, efficiency, sustainability and performance of the agri-food sector can be radically enhanced by using information & decision support systems that are tightly integrated with advanced internet-based networks & services. Concurrently, the sector provides extremely demanding use cases for Future Internet design from physical layer all the way up to the service layer. This proj ...
Voir le projet

 23

 TERMINÉ 
In current wireless communications, radio spectrum and infrastructure are typically used such that interference is avoided by exclusive allocation of frequency bands and employment of base stations. SAPHYRE will demonstrate how equal-priority resource sharing in wireless networks improves spectral efficiency, enhances coverage, increases user satisfaction, leads to increased revenue for operators, ...
Voir le projet

 12

 TERMINÉ 

WEB to Energy (W2E)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

The unbundling of the energy market requires new business models and new integrating technologies to optimize the economy of the whole value chain. To realize the Europe-wide electricity network of the future, a crucial ingredient is an open, universally accessible and standardized ICT communication infrastructure. All market participants shall be provided with required information without discrim ...
Voir le projet

 15

 TERMINÉ 

UrbanFlood

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2012,

More than two thirds of European cities are regularly confronted with climate change induced disasters. Early Warning Systems (EWS) play a crucial role in mitigating the effects of such disasters by detecting conditions which forecast the onset of a catastrophe and to compute its impact. EWSs provide alarming, decision support and information services to governments, companies and the general publ ...
Voir le projet

 6

 TERMINÉ 

Together Anywhere, Together Anytime (TA2)

Date du début: 1 févr. 2008, Date de fin: 31 mars 2012,

How can technology help to nurture family-to-family relationships? This is the question asked by the collaborative project "Together Anywhere, Together Anytime" (TA2).For many people, families form the key social unit. Many of our enduring experiences, holidays, celebrations and moments of fun and laughter are framed as family events. This is something that current technology does not address well ...
Voir le projet

 14

 TERMINÉ 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Voir le projet

 14

 TERMINÉ 

Scanning for Emerging Science and Technology Issues (SESTI)

Date du début: 1 oct. 2008, Date de fin: 30 juin 2011,

Today’s societal developments are often influenced by improbable events with high impact. Recent examples are the “cartoon quarrel” and developments impacting energy security. These events are preceded by “weak signals” which are only partially discussed in policy, if at all, and rarely acted upon. The increasing complexity and uncertainty is reflected in the growing demand for tools for anticipat ...
Voir le projet

 6

 TERMINÉ 

Self-Optimisation and Self-Configuration in Wireless Networks (SOCRATES)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

The SOCRATES project investigates the application of self-organisation methods, which includes mechanisms for self-optimisation, self-configuration and self-healing, as a promising opportunity to automate wireless access network planning and optimisation, thus reducing substantially the Operational Expenditure (OPEX) and improving network coverage, resource utilisation and service quality. Fundame ...
Voir le projet

 8