Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Marches Mosses Raised Bog Restoration Project (Marches Mosses BogLIFE)

Date du début: 1 oct. 2016, Date de fin: 2 janv. 2022,

Background At 950 ha, the Natura 2000 network site, ‘Fenn’s, Whixall, Bettisfield, Wem and Cadney Mosses’, is Britain’s third largest lowland raised bog. Some 71% of the site is active raised bog, a priority habitat type listed in the Habitats Directive, and 25% is degraded raised bog. Much of the site is also classified as a national nature reser ...
Voir le projet

 3

 TERMINÉ 

Soil Care for profitable and sustainable crop production in Europe (SOILCARE)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2021,

European crop production is to remain competitive while reducing environmental impacts, requiring development and uptake of effective soil improvingcropping systems. The overall aim of SOILCARE is to identify and evaluate promising soil-improving cropping systems and agronomictechniques increasing profitability and sustainability across scales in Europe. A trans-disciplinary approach will be used ...
Voir le projet

 29

 TERMINÉ 
Background Listed in Annex I of the Birds Directive, the roseate tern (Sterna dougallii) is classed as ‘Rare in Europe’ by BirdLife International and is a Species of European Conservation Concern. It breeds in just two areas of Europe, namely the Azores and the far northwest. The northwest metapopulation is spread across a small number of sites in Fra ...
Voir le projet

 3

 TERMINÉ 
Background The presence of the invasive alien grey squirrel (Sciurus carolinensis) in the UK is detrimental to several native species and the overall health and resilience of affected woodland ecosystems. The native Eurasian red squirrel (Sciurus vulgaris) is particularly threatened by grey squirrels, but to date there has been no clear pan to stem its po ...
Voir le projet

 7

 TERMINÉ 
Nature-based solutions (NBS) aim to help societies to address a variety of environmental, social and economic challenges in sustainable ways. They are actions which are inspired by and supported by nature. Some involve using and enhancing existing natural solutions to challenges, while others are exploring more novel solutions, for example, based on how non-human organisms and communities cope wit ...
Voir le projet

 18

 TERMINÉ 
Background The River Avon develops into a large calcareous lowland river south of Salisbury. The floodplain consists of humid, species-rich grassland, with ditches and some standing water usually persisting through the spring months. The traditional farming pattern of the valley reflects the propensity for winter flooding. In 1982, the Avon Valley constit ...
Voir le projet

 1

 TERMINÉ 
...onality across landscapes. To do this, the project will develop a new mapping methodology – an 'Ecological Coherence Protocol' – to identify the most beneficial places for people and wildlife, and it will test its application through the implementation of habitat restoration activities at selected sites. The project will seek to deliver multifunctional benefits – for example, it will help ...
Voir le projet

 7

 TERMINÉ 
Background The decline in the population of the little tern (Sterna albifrons) in the UK since the 1990s is a cause for concern. The principal threat to this shore nesting species is from human disturbance. After a decline between the 1930s and 1960s, the population recovered through protection and surveillance by wardens of breeding sites. However, in re ...
Voir le projet

 9

 TERMINÉ 

Protecting Scotland's Biodiversity

Date du début: 1 oct. 2016, Date de fin: 31 janv. 2018,

The Scottish Wildlife Trust owns or manages over 120 nature reserves in Scotland. Our network of regionally based Reserve Project Officers, in conjunction with locally based volunteers undertake all practical conservation work on these sites, protecting a diverse range of biodiversity and ensuring safe access for visitors to enjoy greenspaces and the wildlife they host.We are keen to build on the ...
Voir le projet

 5

 TERMINÉ 

VALorising European Research for Innovation in agriculturE and forestry (VALERIE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Many EU and nationally funded research projects in the fields of agriculture and forestry provide excellent results, but the outreach and translation of these results into field practices is limited. The overall aim of VALERIE is to boost the outreach of research by facilitating the integration into innovative field practices. The work in VALERIE consists of three major approaches. (1). Stakehold ...
Voir le projet

 14

 TERMINÉ 

Presenting Scottish Wildlife Trust Reserves

Date du début: 1 févr. 2016, Date de fin: 31 mai 2017,

Our visitor centres at Loch of the Lowes (Perthshire) and Montrose Basin (Montrose) are important shop windows for Scottish Wildlife Trust: they are sited in wonderful locations, containing iconic species and have the ability to offer memorable wildlife experiences to local communities and visitors alike. We have had an excellent experience working with EVS volunteers and want to use our experti ...
Voir le projet

 5

 TERMINÉ 
The project PRESERVE will allow LEGTPA Neuvic organizing european mobilities for 20 professional undergraduate students in wildlife management with the aim to grow and shine in an international dimension for the institution and its training.These vocational training courses will take place in Scotland, European territory with which we share common environmental problems and similar issues (rich bu ...
Voir le projet

 2

 TERMINÉ 

Improving Scottish Wildlife Trust Reserves

Date du début: 5 oct. 2015, Date de fin: 4 févr. 2017,

The Scottish Wildlife Trust owns or manages over 120 nature reserves in Scotland. Our network of regionally based Reserve Project Officers, in conjunction with locally based volunteers undertake all practical conservation work on these sites, keeping them well managed and great places for wildlife. We have a number of reserve improvements planned and wish to combine our expertise in providing emp ...
Voir le projet

 8

 TERMINÉ 

Quantification of ecological services for sustainable agriculture (QUESSA)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

"The project aims to identify the key semi-natural habitats (SNH), outside and within crops, providing essential ecological services (ES). Vegetation traits will be linked to potential ES provision, case studies will measure actual ES levels and inform models which will show unused opportunities and trade-offs among ES by SNH from habitat to landscape scale. This will be achieved for a range of re ...
Voir le projet

 14

 TERMINÉ 

Nature Exchange Two -managing our natural and cultural assets

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

Nature Exchange Two - Managing our Natural and Cultural Assets. For the last 14 years ARCH has used LLP funding to deliver comprehensive programmes in natural and cultural heritage management. ARCH programmes have seen over 1,000 learners from a wide range of government and non-governmental organisations within Scotland visit a variety countries within Europe to learn about the different ways in w ...
Voir le projet

 24

 TERMINÉ 

Highland Reserve Management Project

Date du début: 4 mai 2015, Date de fin: 3 nov. 2016,

The Scottish Wildlife Trust owns or manages over 120 nature reserves in Scotland. These reserves are managed by a network of 7 regionally based Reserve Project Officers who, in conjunction with groups of locally based volunteers undertake all practical conservation work on these sites, keep them well managed and great places for wildlife. Our project will integrate 2 volunteers for 12 months with ...
Voir le projet

 3

 TERMINÉ 

Conserving Scottish Wildlife

Date du début: 1 sept. 2014, Date de fin: 31 déc. 2015,

The Scottish Wildlife Trust owns or manages over 120 nature reserves in Scotland. These reserves are managed by a network of 6 regionally based Reserves Project Officers who, undertake all practical conservation work on these sites, keeping them well managed and great places for wildlife. Our project recruited 5 volunteers to work with 2 of these Reserves Project Officers, in South West Scotland ...
Voir le projet

 6

 TERMINÉ 
The PANACHE project aims at networking Marine Protected Areas (MPAs) in the Channel area, in order to determine common assessment and management methods, taking into consideration the ecological coherence of those cross-border marine areas. The project also provides for the development of joint strategies for protecting birds in those coastal areas. ...
Voir le projet

 11

 TERMINÉ 

Suivi pour les poissons migrateurs (MorFish 2)

Date du début: 31 déc. 2010, Date de fin: 29 juin 2015,

The MorFish 2 project aims to standardize the methods for monitoring and data collection on migratory fish on both sides of the Channel. The project tries to make a link between the existing data on both sides of the Channel to learn about the past changes of migratory fish populations.
Voir le projet

 3

 TERMINÉ 

LIPARIS

Date du début: 31 oct. 2011, Date de fin: 29 juin 2015,

The LIPARIS project aims at strengthening co-operation between stakeholders in the field of biodiversity protection on either side of the Channel, as the territories face the same problems of biodiversity degradation. Achievements: The LIPARIS project has set up a progr ...
Voir le projet

 5

 TERMINÉ 

Value of Working Wetlands (WOW)

Date du début: 31 oct. 2011, Date de fin: 29 juin 2015,

The goal of the WOW project is to achieve a better understanding of the interaction between land, water and their managers in order to provide long-term and sustainable solutions in the management of wet meadows of plain. Achievements: The WOW project assesses the state ...
Voir le projet

 10

 TERMINÉ 

Stimulating Enterprising Environments for Development and Sustainability (SEEDS)

Date du début: 31 déc. 2011, Date de fin: 29 juin 2015,

Derelict buildings and empty spaces threaten economic competitiveness, territorial cohesion and performance. SEEDS addresses the urgent need for revised policies and robust EU steer by promoting innovative land-use strategies and modern governance. It develops skills and opportunities for those furthest from labour markets, transforming growth prospects. It tackles changing land-use patterns deman ...
Voir le projet

 21

 TERMINÉ 

Channel Catchments Cluster (3C)

Date du début: 22 avr. 2013, Date de fin: 29 janv. 2015,

The aim of the 3C “Channel Catchments Cluster” is to gather, share and disseminate best practices and tools developed in the context of various Interreg IV A France (Channel) - England projects to make scientific recommendations for better water quality.
Voir le projet

 10

 TERMINÉ 

Mammals In a Sustainable Environment (MISE)

Date du début: 28 févr. 2011, Date de fin: 30 déc. 2014,

MISE aims to use DNA analysis of non-invasive samples to monitor small and medium sized mammals in the cross-border region. Monitoring and conserving biodiversity is increasingly being recognised as critical for sustainable development. Developing strategies to maintain biodiversity requires baseline information on the current status and ecosystem requirements for each individual species. Small ...
Voir le projet

 6

 TERMINÉ 

Reducing the Impacts of Non-native Species in Europe (RINSE)

Date du début: 31 déc. 2011, Date de fin: 29 sept. 2014,

RINSE delivers a cross-border approach to the targeting and management of invasive non-native species (INS) in the 2 Seas Area. The introduction and spread of these species beyond their native range can cause serious ecological damages as well as a negative impact on the local economies. RINSE will make an important contribution to the new EU Strategy on Invasive Species by developing cross-border ...
Voir le projet

 9

 TERMINÉ 

Maximising Green Heritage (MaxiGreen)

Date du début: 31 juil. 2009, Date de fin: 29 juin 2014,

Throughout the 2 Seas programme zone many densely populated, urbanised areas are located in or near disused industrial infrastructure such as old railway lines, canals and flooded mining pits. Bringing these areas back into benefitial use would allow cities to enhance their attractiveness in a sustainable and environmentally non-impactful way, but also provide new recreation areas for their inhabi ...
Voir le projet

 7

 TERMINÉ 
The main objective of this proposal is to engage public in the delineation of large-scale activities at European Zoos and Marine Parks, focused on nature conservation and biodiversity. Worldwide Zoos and Marine Parks have changed immensely over the last 50 years. Modern Zoos and Marine Parks in Europe have specific areas of intervention: Education, Entertainment, Conservation, and Research. The Zo ...
Voir le projet

 7

 TERMINÉ 

Landscape and Nature for All (LNA)

Date du début: 31 déc. 2006, Date de fin: 30 juil. 2012,

Objectif général :Issus d'une même entité géologique, les territoires du Parc naturel régional des Caps et Marais d'Opale (PNRCMO) et le Kent Downs Area of Outstanding Naturel Beauty (KDAONB) partagent des types dhabitats naturels en commun.Ces territoires partagent ainsi les mêmes enjeux et défis en termes de préservation de ces paysages protégés regroupant espaces bocagers, zones humides, bois e ...
Voir le projet

 15

 TERMINÉ 

Climate Proof Areas (CPA)

Date du début: 30 juin 2008, Date de fin: 30 déc. 2011,

CPA aims to create a portfolio of climate adoption strategies for the North Sea region. This will be done by carrying out multi-focused pilot projects across the North Sea Region in order to analyse the impacts of climate changes as a first step. Subsequently, diverse climate adoption strategies will be developed, implemented and tested in order to compile and analyse the findings on a transnation ...
Voir le projet

 14

 TERMINÉ 

TRANSMANCHE GREEN NETWORKS (TGN)

Date du début: 31 août 2008, Date de fin: 30 déc. 2011,

Within TGN, partners from France and the UK aim to develop and promote their green tourism centres to improve community and visitor involvement and contribute to the development of green tourism in the 2 Seas area.While operating in the same field – Environmental Education and Green Tourism – each centre has developed distinct approaches to site and facility management, audience development, marke ...
Voir le projet

 6

 TERMINÉ 

River Avon cSAC: demonstrating strategic restoration and management (STREAM)

Date du début: 1 août 2005, Date de fin: 30 sept. 2009,

Background The River Avon Site of Community Interest (SCI) supports more than 180 aquatic plant species, outstanding fish fauna, the annex II species Desmoulin’s whorl snail (Vertigo moulinsiana), and numerous nationally important species. The Avon Valley Special Protection Area (SPA), located in the same area, includes one of the largest expanses of f ...
Voir le projet

 4

 TERMINÉ 

Restoration of the mid Cornwall Moors for the Euphydryas aurinia (Cornwall Moors)

Date du début: 17 mars 2003, Date de fin: 30 juin 2008,

...he cSAC and at seven satellite sites for the marsh fritillary butterfly population. To do this, English Nature brought together a partnership of three statutory agencies, two NGOs (the Cornwall Wildlife Trust and Butterfly Conservation) and landowners. Results Implementation of the project has led to a ...
Voir le projet

 5

 TERMINÉ 
The EROCIPS project aims to provide an opportune answer to accidents of oil, chemical and inert pollution of coastal areas. Its aim is to formulate a transferable methodology to supply relevant information to the stakeholders and the decision-makers committed to fighting coastal pollution after an accident. To achieve this objective, it is organising eight workshops whose actions can be summed up ...
Voir le projet

 15

 TERMINÉ 
Background The remaining natural Tilio-acerion woodland of the British Isles includes mosaics of woodland habitats associated with steep-sided limestone valleys. The project focused on two such sites, the Wye Valley Woodlands cSAC along the border of England and Wales and the Peak District Dales cSAC in northern England, due to their size and complex con ...
Voir le projet

 9

 TERMINÉ 

CYCLEAU

Date du début: 6 avr. 2002, Date de fin: 30 déc. 2006,

A 4-year co-operation exercise between 7 partners in the UK, France and Ireland, this project, led by the UK Environment Agency (Cornwall), aims to develop a common, transferable and integrated approach to planning and management of natural (water) resources in the coastal zone by looking at the whole catchment area. It is innovative in its transnational approach to the management of coastal water ...
Voir le projet

 14

 TERMINÉ 

Developing a strategic network of SPA reedbeds for Botaurus stellaris (Bittern)

Date du début: 1 févr. 2002, Date de fin: 30 juin 2006,

Background The bittern (Botaurus stellaris)is a secretive bird found most often in marshes and extensive stands of reedbed. The evocative booming call of the male during the breeding season is often the only sign of its presence. Over the last century, the species has been in steady decline throughout Europe, principally due to the loss of suitably large ...
Voir le projet

 8

 TERMINÉ 

F4N: Farmers for Nature (F4N)

Date du début: 26 févr. 2004, Date de fin: 14 juin 2006,

The aim of the project was to identify new ways to maintain and improve rural landscapes with enhanced ecological value and with preserved cultural identity. This was done in co-operation with farmers as well as regional organisations and volunteers in order to test best practices with respect to European Common Agricultural Policy (CAP) and other relevant EU legislation. ...
Voir le projet

 7

 TERMINÉ 

SAIL-II (Schéma dAménagement Intégré du Littoral) (SAIL-II)

Date du début: 14 juil. 2002, Date de fin: 13 juil. 2005,

With an ambitious partnership between fifteen regions from the UK, France, Belgium and the Netherlands SAIL II (Schéma dAménagement Intégré du Littoral) is a transnational endeavour seeking to foster greater cooperation between maritime regions over three years. It aims to promote territorial integration between a triangle of coastal regions, including estuaries, in the Southern North Sea Area. Wh ...
Voir le projet

 18

 TERMINÉ 

Restoration of Scottish raised bogs (Scottish raised bogs)

Date du début: 1 janv. 2001, Date de fin: 31 déc. 2003,

...h the clearance of trees, scrub and heather. This was undertaken by a partnership of organisations involving the Forestry Commission for Scotland, Scottish Natural Heritage and the Scottish Wildlife Trust. The human dimension would also be addressed with a variety of measures to increase local interest and access to the eleven sites in order to raise awareness of the conservation value of rai ...
Voir le projet

 1

 TERMINÉ 
This project focuses upon habitat improvement, monitoring key species and providing conditions suitable for successful species diversification and enhancement in order to improve the protection and management of key sites. The project has identified habitats that require improvements in both countries, identifying species that could be lost or threatened if the work is not undertaken. The habit ...
Voir le projet

 1