Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 
The Sentinel- satellite series aims at frequent global coverage of the Earth surface in full spectrum of remote sensing. This enables the use of well-established satellite products, built up with earlier more research oriented satellites, to be used for the benefit of people in six core areas of Copernicus/GMES: security, land monitoring, climate change, atmosphere monitoring, emergency management ...
Voir le projet

 5

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 
Context awareness has the potential to revolutionise the way people interact with information technology. Whereas conventional computers merely interpret explicit user input, context-aware systems analyse and automatically respond upon users’ behaviour and situation he/she is in. This enables electronic systems to assist users in situations in which the use of conventional computers and mobile d ...
Voir le projet

 15

 TERMINÉ 
... opportunities for research centers to cooperate and continuously improve their activities so as to reach the top and beyond. Here is where RECOCAPE comes into place.SECC of Egypt, TECNALIA of Spain, VTT of Finland, and UNIBO of Italy agreed to form capable integrated consortium and propose RECOCAPE in response to the FP7-INCO-2011-6 Call. The S&T objectives are (1) developing SECC’s strategic tec ...
Voir le projet

 5

 TERMINÉ 
"According to 2007 Eurostat statistics, there is a robust need to better understanding the nutritional existing barriers to healthy nutrition of 79 million EU-27 citizens at-risk-of-poverty. These European subclusters and ethnic populations have in common low purchasing power, limited education and the highest risk of diet-related diseases due to sub-optimal nutrition. CHANCE project will i) defin ...
Voir le projet

 19

 TERMINÉ 
The 8th Africa-EU Strategic Partnership interlinks 3 priorities which can leverage a faster socio-economic development in Africa. Africa/Europe have recognised that the development of STI & the spreading of ICT to all components of a society are key. P8 new Action Plan lists as a priority the development of an inclusive information society in Africa. In that perspective is being formed a multi-sta ...
Voir le projet

 12

 TERMINÉ 

interactIVe

Date du début: 1 janv. 2010, Date de fin: 30 nov. 2013,

The interactIVe project addresses the development and evaluation of next-generation safety systems for Intelligent Vehicles, based on active intervention. Safety technologies have shown outstanding capabilities for supporting the driver in hazardous situations. Despite their effectiveness, currently available systems are typically implemented as independent functions. This results in multiple expe ...
Voir le projet

 32

 TERMINÉ 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Date du début: 1 sept. 2009, Date de fin: 28 févr. 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Voir le projet

 70

 TERMINÉ 

SMART Container Chain Management (SMARTCM)

Date du début: 1 août 2008, Date de fin: 31 oct. 2011,

SMART_CM aims to do advanced technology implementation and research in order to overhaul the complete container door-to-door transport chain so that it is more efficient, secure, market driven, and competitive. It systematically analyses current processes and systems, produces new innovative concepts for processes and technologies, and demonstrates all these in a set of 2 world scale Demonstrators ...
Voir le projet

 31

 TERMINÉ 
Current two big trends in wireless communications are the development of new broadband component and the integration of heterogeneous wireless networks, to achieve the vision f the so-called 4G network.The FUTON project addresses both issues by proposing the development of a hybrid fiber-radio infrastructure transparently connecting remote antenna units to a central unit where a joint processing c ...
Voir le projet

 17

 TERMINÉ 
Keeping training in Digital Printing updated and relevant : New technology that allows trainers to produce, update and modify training literature to best suit vocational students of digital printing. This project started in 2000 and lasted 36 months.
Voir le projet

 12