Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The main goal of MULTI2HYCAT is to design, obtain proof of concept (2 gr.) and upscale in a pre-pilot reactor (20-50 gr.) a new class of hierarchically-porous organic-inorganic hybrid materials, which will be used as active catalysts to carry out multi-step asymmetric catalytic processes with predominantly high conversions (up to 90%) and selectivity (in the range of 80-90%) towards the desired fi ...
Voir le projet

 11

 TERMINÉ 

1D Nanofibre Electro-Optic Networks (1D-Neon)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

The vision of 1D-NEON proposal is to develop fibre-based smart materials along with an integrated technology platform for the manufacturing in Europe of new products with multi-sectorial applications in consumer electronics, energy, healthcare and fitness, smart buildings, sensors and e-skin for soft robotics.The overall objective of 1D-NEON is to build a modular platform for manufacturing fibre-b ...
Voir le projet

 14

 TERMINÉ 
The next generation water electrolysers must achieve better dynamic behaviour (rapid start-up, fast response, wider load and temperature ranges) to provide superior grid-balancing services and thus address the steep increase of intermittent renewables interfaced to the grid. The HPEM2GAS project will develop a low cost PEM electrolyser optimised for grid management through both stack and balance o ...
Voir le projet

 7

 TERMINÉ 
Several European bus manufacturers consider the hybrid fuel cell (FCH) bus as the most promising technology to facilitate the decarbonisation of public transport. By leveraging the experiences of past fuel cell bus projects, implementing technical improvements that increase efficiency and reduce costs of FCH buses, as well as introducing a modular approach to hydrogen refuelling infrastructure bui ...
Voir le projet

 13

 TERMINÉ 
The principal aim of the project is to develop an EU-centric supply base for key automotive PEM fuel cell components that achieve high power density and with volume production capability along with embedded quality control as a key focus - to enable the establishment of a mature Automotive PEM fuel cell manufacturing capability in Europe. It will exploit existing EU value adding competencies and s ...
Voir le projet

 7

 TERMINÉ 

Synergistic Fouling Control Technologies (SEAFRONT)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

Marine biofouling, the unwanted colonization of marine organisms on surfaces immersed in seawater has a huge economic and environmental impact in terms of maintenance requirements for marine structures, increased vessel fuel consumption, operating costs, greenhouse gas emissions and spread of non-indigenous species. The SEAFRONT project will aim to significantly advance the control of biofouling a ...
Voir le projet

 19

 TERMINÉ 

European Consortium for Lithium-Sulfur Power for Space Environments (ECLIPSE)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2017,

For space missions, the energy density of batteries is a key factor of systems mass.A recent battery technology, based on this Lithium-Sulfur chemistry and developed by OXIS Energy, has shown promising results, particularly in terms of specific energy and cycling performances. Lithium-Sulfur batteries could become the next breakthrough technology for space batteries, with a factor of two on the sp ...
Voir le projet

 12

 TERMINÉ 
Nanotechnology is a key enabling technology. Still existing uncertainties concerning EHS need to be addressed to explore the full potential of this new technology. One challenge consists in the development of methods that reliably identify, characterize and quantify nanomaterials (NM) both as substance and in various products and matrices. The European Commission has recently recommended a definit ...
Voir le projet

 30

 TERMINÉ 
The main objective of this research proposal is to identify and elaborate those characteristics of ENM that determine their biological hazard potential. This potential includes the ability of ENM to induce damage at the cellular, tissue, or organism levels by interacting with cellular structures leading to impairment of key cellular functions. These adverse effects may be mediated by ENM-induced a ...
Voir le projet

 40

 TERMINÉ 

Advanced materials for batteries (MAT4BAT)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

"Li-ion technologies initiated in the 90’ at a fast development pace thanks mainly to emerging ICTs with more than 20 GWh sold in 2010. Soon, it appeared as a credible technology for electrical vehicles as it could provide average energy densities of about 140 Wh/kg. However and since then,major breakthroughs have been expected to reach higher storage levels of 250 Wh/kg on battery system level wi ...
Voir le projet

 18

 TERMINÉ 
NANOREM is designed to unlock the potential of nanoremediation and so support both the appropriate use of nanotechnology in restoring land and aquifer resources and the development of the knowledge-based economy at a world leading level for the benefit of a wide range of users in the EU environmental sector.NANOREM uniquely takes a holistic approach to examining how the potential for nanoremediati ...
Voir le projet

 30

 TERMINÉ 
Solar photovoltaic (PV) technology is one of the fastest growing sustainable, renewable energy conversion technologies that can help meet the increasing global energy demands. Organic photovoltaic (OPV) technologies are particularly attractive due to their compatibility with low-cost roll-to-roll and printing processing at low temperatures on a wide variety of substrate materials and the lack of s ...
Voir le projet

 12

 TERMINÉ 

RE-NERGY 2014 – Building the sustainable economy

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The RE-NERGY Project, with the proposal of 5 weeks transnational mobility, renews its commitment in the field of vocational training by focusing on new themes, but always starting from the needs of the cluster, as a response to the training needs of the productive sectors of the eastern provinces Piedmont (especially Alessandria Province). The focus then becomes polarized toward the handicraft s ...
Voir le projet

 20

 TERMINÉ 
"The main objective of the planned project IMPACT is to increase the life-time of fuel cells with membrane-electrode assemblies containing ultra low Pt-loading (< 0.2 mg cm-2) for automotive applications. The economic requirements to reduce Pt loading leads to the challenge to maintain durability and performance, an aspect which has not been addressed sufficiently in public projects and studies. A ...
Voir le projet

 13

 TERMINÉ 

Fortbildungsmaßnahmen in Unternehmen

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

This project is suited for trainees as industrial clerks or trainees in wholesale and foreign trade with the additional qualification “European Business Management with foreign languages“ in the area of the Chamber of Commerce ”Südlicher Oberrhein”. A several weeks long internship in a company in another European country is an integral part of the training. As many trainees as possible will take p ...
Voir le projet

 9

 TERMINÉ 

Sustainable Hydrothermal Manufacturing of Nanomaterials (SHYMAN)

Date du début: 1 mai 2012, Date de fin: 30 avr. 2016,

It is vital that nanomanufacturing routes facilitate an increase in production whilst being 'green', sustainable, low cost and capable of producing high quality materials. Continuous hydrothermal synthesis is an enabling and underpinning technology that is ready to prove itself at industrial scale as a result of recent breakthroughs in reactor design which suggest that it could now be scaled over ...
Voir le projet

 19

 TERMINÉ 
Background The use of high performance, rechargeable lithium-ion (Li-ion) batteries is growing fast in a number of industrial sectors, including mobile phones, laptop computers and electric vehicles. Despite the success of Li-ion technology, major advances in power storage solutions are required to support the transition to an adaptive carbon free econom ...
Voir le projet

 1

 TERMINÉ 

DYNAMIC INTERACTIVE NANOSYSTEMS (DYNANO)

Date du début: 1 nov. 2011, Date de fin: 29 févr. 2016,

"The key and direct objective of DYNANO is to provide training with a deep knowledge and expertise on Dynamic Interactive Nanosystems for biomedical and biotechnological applications on the basis of the existing scientific and technological areas: dynamic chemistry / glycosciences / biology / nanosciences. DYNANO will expose researchers in training to the process of design, generation, optimizatio ...
Voir le projet

 13

 TERMINÉ 
Supercapacitors, especially hybrid supercapacitors, are a very promising technology for application in plug-in hybrids, electric cars or the smart grid, which presents a number of interesting advantages over batteries with regard to specific power and cycle life. However, a number of research challenges remain.The Energy Caps project aims at developing a sustainable and safe hybrid supercapacitor ...
Voir le projet

 6

 TERMINÉ 

Nanocomposite materials for photocatalytic degradation of pollutants (LIMPID)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2015,

Limpid aims at generating new knowledge on photocatalytic materials and processes in order to develop novel depollution treatments with enhanced efficiency and applicability. The main goal of LIMPID is to develop materials and technologies based on the synergic combination of different types of nanoparticles (NPs) into a polymer host to generate innovative nanocomposites which can be actively appl ...
Voir le projet

 13

 TERMINÉ 

Advanced manufacturing processes for Low Cost Greener Li-Ion batteries (GREENLION)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

GREENLION is a Large Scale Collaborative Project with the FP7 (topic GC.NMP.2011-1) leading to the manufacturing of greener and cheaper Li-Ion batteries for electric vehicle applications via the use of water soluble, fluorine-free, high thermally stable binders, which would eliminate the use of VOCs and reduce the cell assembly cost.GREENLION has 6 key objectives: (i) development of new act ...
Voir le projet

 19

 TERMINÉ 
The NANOPUR-project aims at leveraging on promising bottom-up technologies to develop intensified water treatment concepts based on nano-structured and nano-functionalized membranes as well as nanofilm deposition for micropollutants and virus removal.Major research needs targeted include the preparation of membranes with selective properties at the nanoscale able to maintain high permeability with ...
Voir le projet

 15

 TERMINÉ 
Although many predictions for the hydrogen economy in the last decade have proven optimistic, the maturity of it is now increasingly evident by the substantial investments in R&D, demonstration and industrialisation made by public and private institutions in Europe. The USA and Japan are leading the hydrogen based energy infrastructure, becoming a mainstream solution for society’s need to transiti ...
Voir le projet

 9

 TERMINÉ 

European Li-Ion Battery Advanced Manufacturing for Electric Vehicles (ELIBAMA)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

The global objective of the ELIBAMA project is to enhance and accelerate the creation of a strong European automotive battery industry structured around industrial companies already committed to mass production of Li-ion cells and batteries for EVs. Europe faces strong competition from Asia and the USA where more investments and production capacities for Li-ion batteries currently exist. The ELIBA ...
Voir le projet

 17

 TERMINÉ 

Efficient, low-cost, stable tandem organic devices (X10D)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

X10D aims to enable organic photovoltaics (OPV) to enter the competitive thin-film PV market. It will achieve this by pooling the knowledge and expertise of the leading research institutes and start-up companies in Europe, and is the first project of its kind to leverage this knowledge irrespective of the processing technology. It will use the strengths available in device efficiency and architect ...
Voir le projet

 20

 TERMINÉ 
Scope and background of projectIn the 4th call of the European FCH JU (AIP 2011) a project has been called to map out the relevance of hydrogen underground storage. The focus being on seasonal energy storage at large scale, the potential, application profile, impact of and schedule to implement this concept may differ across Europe. In recent studies a clear profile for various large-scale storage ...
Voir le projet

 12

 TERMINÉ 

STAYERS Stationary PEM fuel cells with lifetimes beyond five years (STAYERS)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2014,

"Economical use of PEM fuel cell power for stationary applications demands a lifetime of the fuel cells of at least 5 years, or more than 40,000 hours of continuous operation. The prospect of large scale application for automotive use has focused PEM research on low cost production techniques with practical lifetimes of the fuel cells of 5,000 hours. For the stationary use, especially in the chemi ...
Voir le projet

 5

 TERMINÉ 

PEM with Innovative low cost Core for Automotive applicatioN (PEMICAN)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2014,

"Up to now, much work has been performed on the catalyst but much on the active layers’ structure and on the two other major components (carbon and electrolyte) whereas they do have a major impact on the MEA’s performance and on Pt utilization.Based on this analysis, PEMICAN proposes to reduce the Pt loading for automotive application down to 0.15 gram of Pt per kW, by a twofold approach:1.to incr ...
Voir le projet

 8

 TERMINÉ 

MembrAnEs for STationary application with RObust mechanical properties (MAESTRO)

Date du début: 1 janv. 2011, Date de fin: 31 mars 2014,

"Low equivalent weight ionomers are required to reach the membrane conductivity and MEA performance targets for stationary operation and enable stationary PEMFC systems to achieve superior overall system yield to competitive technologies. Perfluorosulfonic acid ionomers (PFSA) demonstrate excellent properties in terms of chemical resistance in a fuel cell environment. In stationary applications, w ...
Voir le projet

 5

 TERMINÉ 
The focus of the project is on the development of fluorinated electrolyte/separator and binders in combination with active electrodes (anode LiC6 and cathode: LiNixMn2-xO4 - 4,7V) for high performing, safe and durable Li batteries. The main deliverables of the project are the development of cell prototypes capacity > 10 A.h on which performance assessment will be conducted. The AMELIE prototype pe ...
Voir le projet

 12

 TERMINÉ 
"The main goal of PROSUITE is to develop a framework methodology, operational methods and tools for the sustainability assessment of current and future technologies over their life cycle, applicable to different stages of maturity. The project will apply the methodology for four technology cases with close consultation of the stakeholders involved, which includes cases from biorefineries, nanotech ...
Voir le projet

 25

 TERMINÉ 

Embedded Organic Memory Arrays (MOMA)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

The advent of non-volatile flash memory -- silicon-based semiconductor memory that does not lose its data when the power is turned off -- revolutionized consumer electronics. Similar types of organic memory will play a pivotal role in the wide range of new market opportunities of flexible electronics based on organic transistor technology. Currently, these memory elements do not exist, thus formin ...
Voir le projet

 6

 TERMINÉ 

Waterstofregio

Date du début: 31 mai 2009, Date de fin: 29 mai 2012,

...nde werkgelegenheid creëren.Binnen het project zijn bovendien al een aantal innovatieve en indrukwekkende projecten concreet gerealiseerd, zoals bvb de 1 MW brandstofcelplant op restwaterstof bij Solvay en de bouw van een tankstation bij Colruyt Group, waarbij heftrucks op waterstof worden getest.Andere projecten, zoals het uitwerken van een interactief onderwijsprogramma rond waterstof en logist ...
Voir le projet

 15

 TERMINÉ 

Automotive Fuel Cell Stack Cluster Initiative for Europe (Auto-Stack)

Date du début: 1 janv. 2010, Date de fin: 30 sept. 2011,

While the supply base for materials and components in Europe is well advanced and competitive, stack integration is lagging behind due to massive investment requirements and risks associated with commercialization. The project aims to develop approaches to address the critical barriers for substantial improvement of collaboration between major stakeholders and establishing a solid business model f ...
Voir le projet

 15

 TERMINÉ 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Voir le projet

 27

 TERMINÉ 
"The main objective of the planned project DECODE is to increase the life-time of fuel cells for automotive applications. It is well-known that liquid water plays a crucial role in the degradation processes of fuel cells. However, this specific degradation influence is not addressed sufficiently in the present research and development efforts. Therefore, DECODE aims at identifying characteristic b ...
Voir le projet

 12

 TERMINÉ 

EU economic policies and location of economic activities (Economy)

Date du début: 9 juin 2005, Date de fin: 18 mars 2007,

The project shall further develop and deepen the understanding of the economic dimension of the development of the European territory.That includes identifying the spatial pattern of company/investment locations and the factors influencing these patterns and looking from a policy perspective identifying the key measures having impact on these patterns.The policy perspective should address both mea ...
Voir le projet

 8

 TERMINÉ 
The project, comprising 8 partners from 4 countries, will develop new methodology for the use of ICT across a range of business sectors. The overall project aim is to improve the efficiency of ICT use in different European countries and business sectors. Project partners will develop e-learning modules covering the use of ICT in business. These modules will be accompanied by a tutorship programme ...
Voir le projet

 7

 TERMINÉ 
The competitiveness of the European biotechnology sector depends largely on the ability of European citizens to start companies. It will also depend in particular on scientists' ability to research viable products and applications.The project aims to train university researchers to equip them for starting and managing companies.The project comprises an analysis of the needs of the target groups an ...
Voir le projet

 6

 TERMINÉ 

BrainTrainer 2012

Date du début: 2 mai 2012,

"BrainTrainer 2012” is a project set up by Bilkent Universitesi Endustri Muhendisligi Operational Research Kulubu in association with ESTIEM (European Students of Industrial Engineering and Management), a network of youngEuropeans, which aims to empower and enthuse young people from different countries to take anactive and responsible role in society.The five-day intercultural event will gather 26 ...
Voir le projet

 18