Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Rail Baltica Growth Corridor (RBGC)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

The RBGC is led by the City of Helsinki and coordinated by the Aalto University Small Business Center. The project has in total of 21 partners from 6 BSR countries. Target groups of the RBGC are City and regional authorities, Transport service providers, Logistics centers, Intermodal terminals, Public transport authorities, Universities and other research centers. RBGC's partner composition is bas ...
Voir le projet

 21

 TERMINÉ 

Scandinavian-Adriatic Corridor for Growth and Innovation (SCANDRIA)

Date du début: 31 août 2009, Date de fin: 8 sept. 2012,

Against the background of doubling freight transport volumes by 2050 in the Baltic Sea Region (BSR), capable transport infrastructures are required for efficient, integrated and sustainable freight and passenger traffic.The Scandinavian-Adriatic Development Corridor is the shortest geographical link between Baltic and Adriatic Sea. It provides freight transport capacities to relieve overloaded Wes ...
Voir le projet

 19

 TERMINÉ 
The objective of CIVITAS CATALIST is to ensure that the experiences of the CIVITAS Initiative are exploited up to a maximum level. This means deploying actions aiming to:- consolidate, validate and deepen the knowledge of the wider impacts of CIVITAS through an integrated assessment of the CIVITAS measures;- promote the results of CIVITAS through a continuing knowledge transfer process;- increase ...
Voir le projet

 23

 TERMINÉ 

European Development Corridor III "Via Regia" (ED-C III)

Date du début: 30 avr. 2006, Date de fin: 30 août 2008,

Over centuries the "Via Regia" had been one of the most important trading routes in Europe, connecting the East and West of the continent. Due to the political situation after World War II, it almost completely lost this function. Some years ago, with the fall of the Iron Curtain, new opportunities emerged for a development axis contributing to European integration and improved relations to neighb ...
Voir le projet

 16

 TERMINÉ 
The Trans-European railway Rail Baltica, linking Helsinki – Tallinn – Riga – Kaunas – Warsaw and continuing on to Berlin, is to be developed within the territories of the co-operating EU Member States.The Interreg IIIB project Rail Baltica had two main goals: (a) the definition of the most favourable route for the Rail Baltica railway link in terms of spatial planning and regional development, and ...
Voir le projet

 23

 TERMINÉ 

Baltic Energy Efficiency Network for the Building Stock (BEEN)

Date du début: 20 juin 2005, Date de fin: 30 déc. 2007,

Buildings account for more than 40% of the overall energy consumption in the EU, of which two-thirds are consumed in residential buildings. Thereby, the standard of the buildings varies greatly and low thermal quality primarily occurs in the prefabricated multi-storey housing stock in the Central and Eastern European member states. This fact also implies huge potentials for energy savings and the ...
Voir le projet

 26

 TERMINÉ 
As budget constraints of most municipalities are increasing, municipal service providers in the water and waste sector face pressures to improve efficiency and decrease costs. Additional challenges arise from legal obligations, such as EC directives to meet water quality and environmental standards as well as from rising public expectations concerning quality of service. To meet these demands muni ...
Voir le projet

 13

 TERMINÉ 

European Position Determination System - InterRegional Co-operation (EUPOS - IRC)

Date du début: 30 sept. 2006, Date de fin: 30 déc. 2007,

Satellite-based navigation and positioning systems like GPS are becoming an ever more important part of our daily lives, which does not only apply to driving. Such systems and their applications also promise to play a significant role in various aspects of regional planning. For instance, geoinformation data can inform regional policy decisions in fields such as the environment (e.g. through emiss ...
Voir le projet

 9

 TERMINÉ 

Retail Development - The Competence Network in the Baltic Sea Region (RENET)

Date du début: 2 juin 2005, Date de fin: 30 déc. 2007,

Retail development decisions have crucial effects on a balanced supply structure within polycentric settlement structures with strong implications for the social, cultural and environmental balance in cities and regions. Structural change of the sector with increasing spatial concentration (shopping centres, big retail outlets) – often outside integrated areas – is interdependent with city centre ...
Voir le projet

 17

 TERMINÉ 
The focus of MA+ is laid on a balanced polycentric development of BSR and its metropolitan regions. MA+ intends to strengthen metropolitan regions as a whole. Transnationally agreed development targets and measures - already in the preliminary stages - should help to reduce the traditional metropolitan conflict situation of functional and growth competition between the centre of conurbation, the s ...
Voir le projet

 24

 TERMINÉ 
The overall aim of the BALTIC+ project was to form a permanent political platform for co-ordination and management of spatial development strategies and actions in a macro-region consisting of Skåne in Sweden, Mecklenburg-Vorpommern, Berlin and Brandenburg in Germany, and Western Pomerania in Poland. Agriculture and forestry, tourism, communication and infrastructure as well as promoting collabora ...
Voir le projet

 21