Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

The European network for observing our changing planet (ERA-PLANET)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

In the last decade a significant number of projects and programmes in different domains of environmental monitoring and Earth observation have generated a substantial amount of data and knowledge on different aspects related to environmental quality and sustainability. Big data generated by in-situ or satellite platforms are being collected and archived with a plethora of systems and instruments m ...
Voir le projet

 38

 TERMINÉ 

EUROPLANET 2020 Research Infrastructure (EPN2020-RI)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

...y scientific and technological challenges facing modern planetary science by providing open access to state-of-the-art research data, models and facilities across the European Research Area. Its Transnational Access activities will provide access to world-leading laboratory facilities that simulate conditions found on planetary bodies as well as specific analogue field sites for Mars, Europa and T ...
Voir le projet

 35

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Integrated Activities for the High Energy Astrophysics Domain (AHEAD)

Date du début: 1 sept. 2015, Date de fin: 28 févr. 2019,

...Activities in the High Energy Astrophysics Domain (AHEAD) in response to the INFRAIA-2014-2015 call Research Infrastructures for High EnergyAstrophysics.The overall objective of AHEAD is to integrate national efforts in high-energy Astrophysics and to promote the domain at the European level, to keep its community at the cutting edge of science and technology in this competitive research area and ...
Voir le projet

 26

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Voir le projet

 32

 TERMINÉ 

Development of two cycle innovative curricula in microelectronic engineering

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

... / curricula in microelectronics inclusive ECTS; to develop a set of 11 new core curricula and 5 transferable modules in micro-, nano-electronics incl. soft skills/adopt on institutional/ accredit on national level ; to develop, publish, purchase the new tutorials, handbooks, syllabi; to develop WEB based platform; to prepare a set of documentation for MicLabs, purchase/install the equipment; to r ...
Voir le projet

 17

 TERMINÉ 
The MiARD project will use a wide range of data sets from the Rosetta mission (including the Philae lander) to refine the 3D topography of specific areas of comet 67P/Churyumov-Gerasimenko, to study the activity and changes caused by subliming volatiles as the comet nears the Sun, to make inferences about the nature of the top 10 cm of the surface of the comet, to assess whether the landing site o ...
Voir le projet

 9

 TERMINÉ 
GEO-CRADLE brings together key players representing the whole (Balkans, N. Africa and M. East) region and the complete EO value chain with the overarching objective of establishing a multi-regional coordination network that will (i) support the effective integration of existing EO capacities (space/air-borne/in-situ monitoring networks, modelling and data exploitation skills, and past project expe ...
Voir le projet

 20

 TERMINÉ 
AGILE targets multidisciplinary optimization using distributed analysis frameworks. The involvement of many disciplinary analyses ranging up to high levels of fidelity and agile workflow management are considered to be state-of-the-art and starting point for AGILE. Advanced optimization techniques and strategies will be developed in order to exploit available computing systems and to gain faster c ...
Voir le projet

 20

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

Reaserchers' Night Project 2016-2017 in Israel (ERNI2016)

Date du début: 1 juin 2016, Date de fin: 31 janv. 2018,

...lvement of the academic community including Israel Ministry of Science, Technology and Space (MOST), all major researchuniversities, leading collages and three science museums.o Awareness campaign at national level managed and funded by the Israel Ministry of Science, Technology and Space.o Groups of junior-high and high-school students (ages 12-18) will be invited by each partner to take part in ...
Voir le projet

 14

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 
National Contact Points (NCPs) for Space provide support on Space funding under EU Framework programmes. In 2007 under FP7 the EU started funding an NCP Space network which was named COSMOS. This enabled the NCPs to benefit from each other’s experience and thus raise the level of the overall quality of their services. Additional services were established like a joint website and news service provi ...
Voir le projet

 24

 TERMINÉ 

Prediction of Geospace Radiation Environment and solar wind parameters (PROGRESS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The smooth functioning of the European economy and the welfare of its citizens depends upon an ever-growing set of services and facilities that are reliant on space and ground based infrastructure. Examples include communications (radio, TV, mobile phones), navigation of aircraft and private transport via GPS, and service industries (e.g. banking). These services, however, can be adversely affec ...
Voir le projet

 8

 TERMINÉ 

Generic Integrated Forensic Toolbox for CBRN incidents (GIFT CBRN)

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

"Forensic investigation is a key component in the fight against crime and the protection of EU societies. At present it is hampered by a lack of protocols and training in carrying out forensic analysis on CBRN-contaminated materials. The aim of GIFT-CBRN is to develop a forensic toolbox for investigating CBRN incidents. This toolbox would provide (1) procedures, sampling methods and detection of C ...
Voir le projet

 20

 TERMINÉ 
...lications in dynamic and changeable real-time environments.The EMC2 project focuses on the industrialization of European research outcomes and builds on the results of previous ARTEMIS, European and National projects. It provides the paradigm shift to a new and sustainable system architecture which is suitable to handle open dynamic systems.EMC² is part of the European Embedded Systems industry st ...
Voir le projet

 101

 TERMINÉ 

SUPER LIGHT-WEIGHT THERMAL PROTECTION SYSTEM FOR SPACE APPLICATION (LIGHT-TPS)

Date du début: 25 avr. 2014, Date de fin: 1 mai 2017,

LIGHT-TPS will develop a new super-light Thermal Protection System (TPS) for various space applications, above all for Reusable Space Systems (RSS), capable of operating within the entire range of working temperatures. The project aims at radical properties improvements in the TPS used existing and under-development RSS. The main disadvantage of existing TPS based on metallic frames is the signifi ...
Voir le projet

 8

 TERMINÉ 
...d and assess shifts in cultivation practises and cropping systems to evaluate impacts on biodiversity and the environment. Furthermore, dedicated capacity building activities are planned to increase national and international capacity to enable sustainable management of agriculture. Lastly, a strong coordinating mechanism will be put in place, through the project partners, between SIGMA and the ...
Voir le projet

 22

 TERMINÉ 

DEMOCRACY - YOUTH - POWER: Theory and practice of youth empowerment

Date du début: 1 août 2016, Date de fin: 31 mars 2017,

One of the main goal of the youth work consists of educate young people to play the role of “agents of change” in their local communities by fostering their sense of active citizenship as well as political and democracy education. However, youth workers and youth leaders cannot sometimes succeed in this above all for two reasons. Firstly, they tend to hold (consciously or not) decision-making powe ...
Voir le projet

 11

 TERMINÉ 

High Altitude Ice Crystals (HAIC)

Date du début: 1 août 2012, Date de fin: 31 janv. 2017,

... 34 partners representing the European stakeholders of the aeronautical industry from eleven European countries and 5 partners from Australia, Canada and the United States.HAIC will also develop international cooperation and collaboration thanks to the involvement of key international organisations and companies as partners of the project or through the HAIC Advisory Board.Letters of support from ...
Voir le projet

 40

 TERMINÉ 

Network Functions as-a-Service over Virtualised Infrastructures (T-NOVA)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

Network Functions Virtualisation (NFV) is an emerging concept, which refers to the migration of certain network functionalities, traditionally performed by hardware elements, to virtualized IT infrastructures, where they are deployed as software components. NFV leverages commodity servers and storage, including cloud platforms, to enable rapid deployment, reconfiguration and elastic scaling of net ...
Voir le projet

 19

 TERMINÉ 

End-user driven DEmo for cbrNe (EDEN)

Date du début: 1 sept. 2013, Date de fin: 31 déc. 2016,

... and stakeholders, irrespective of their existing capability levels, will gain immediate advantages through improved interoperability. EDEN Store will allow capabilities to be shared among multi-national CBRNE stakeholders, which is paramount in cross-border incident management, and through time allow for a build up of common capability across European boundaries. EDEN will be validated by three ...
Voir le projet

 47

 TERMINÉ 

Cold Spray Radical Solutions for Aeronautic Improved Repairs (CORSAIR) (CORSAIR)

Date du début: 1 juin 2013, Date de fin: 30 nov. 2016,

CORSAIR project is a wide investigation concerning the capabilities of Cold Spray Technology for maintenance and repair of aeronautic frames and components. Today, deep and systematic investigation in Cold Spray is required to better understand the capabilities and fully validate the technology in aeronautics. In this scenario, the activities planned in CORSAIR project are (1) Explore the real cap ...
Voir le projet

 13

 TERMINÉ 

Improving Low Earth Orbit Security With Enhanced Electric Propulsion (LEOSWEEP)

Date du début: 21 oct. 2013, Date de fin: 1 nov. 2016,

...ology and policy development roadmap, (6) the pre-phase A design of a small technology demonstration mission and (7) the exploitation and dissemination of the proposal outcomes.A world-class international team of universities and industrial partners from Europe and Ukraine has been formed in order to perform this study with a high level of theoretical and technical expertise in all relevant fields ...
Voir le projet

 11

 TERMINÉ 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Voir le projet

 60

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

... combinations thereof. The project will develop a demand-driven common federation framework, based on an open architecture and specification. It will be widely adopted by facilities and promoted internationally. This framework will provide simple, efficient, and cost effective experimental processes built around experimenters' and facility owners' requirements. Insight into technical and socio-eco ...
Voir le projet

 43

 TERMINÉ 
We propose to develop advanced imaging arrays of kinetic inductance detectors (KIDs) for space-based observations at mm-far-infrared (mm-FIR) wavelengths. This development addresses the FP7 topic SPA.2012.2.2-01: Key technologies enabling observations in and from space.Future space science and earth observation missions are limited by the availability of imaging detector array technology for the m ...
Voir le projet

 7

 TERMINÉ 

Protection of Critical Infrastructures against High Power Microwave Threats (HIPOW)

Date du début: 1 juin 2012, Date de fin: 31 janv. 2016,

...rding hardening measures and robust architectures, a suggested risk management process applicable on organizational level, input to standards and guidelines applicable for critical infrastructures on national and European level. The project will conduct real experiments and tests on components and systems that constitute parts of critical infrastructures and develop a prototype sensor that can det ...
Voir le projet

 16

 TERMINÉ 

Advanced Radio Astronomy in Europe (RADIONET3)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

...in its TNA Program. It has a transparent and efficient management structure designed to optimally support the implementation of the project.RadioNet is now recognized by funding agencies and international project consortia as the European entity representing radio astronomy and facilitating the access to and exploitation of excellent facilities in this field. This is of paramount importance, as a ...
Voir le projet

 29

 TERMINÉ 
Project in brief The rapid pace of urbanization in the Mediterranean area over the last decades have raised a series of issues mostly related to air quality, energy efficiency, waste recycling, pressure on natural resources, pollution and social welfare of urban inhabitants. While cities population will continue to grow in the next years, it is of fundamental importance to ensure the transition fr ...
Voir le projet

 12

 TERMINÉ 

European Researchers' Night 2014 and 2015 in Israel (ERNI2014)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2015,

...vement of the academic community including Israel Ministry of Science, Technology and Space (MOST), all major research universities, leading collages and three science museums.o Awareness campaign at national level managed and funded by the Israel Ministry of Science, Technology and Space.o Groups of junior-high and high-school students (ages 12-18) will be invited by each partner to take part in ...
Voir le projet

 12

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68

 TERMINÉ 

Monitoring Atmospheric Composition and Climate -III (MACC-III)

Date du début: 1 août 2014, Date de fin: 31 août 2015,

...levels. The most significant economic benefit by far identified in the ESA-sponsored Socio-Economic Benefits Analysis of Copernicus report published in July 2006 was the long-term benefit from international policy on climate change. Long-term benefit from air quality information ranked second among all Copernicus benefits in terms of present value. Immediate benefits can be achieved through effici ...
Voir le projet

 39

 TERMINÉ 
... efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the network created by National Contact ...
Voir le projet

 35

 TERMINÉ 

A Global Approach to Near-Earth Object Impact Threat Mitigation (NEOSHIELD)

Date du début: 1 janv. 2012, Date de fin: 31 mai 2015,

...ations outside the European Union. We propose to formulate a global response campaign roadmap that may be implemented when a serious impact threat arises. The roadmap will consider the necessary international decision-making milestones, required reconnaissance observations, both from the ground and from rendezvous spacecraft, practical prerequisites, such as precise orbit tracking, and a campaign ...
Voir le projet

 13

 TERMINÉ 
... be carried out to identify actions for improvements and to assess the best possible organizational and operational architectures enabling sustainability at optimal costs for the society. The role of national or international regulatory authorities and agencies will be reviewed to assess which should be stakeholders of CBRN mobile capacities and how to coordinate the activities these EU mechanism ...
Voir le projet

 11

 TERMINÉ 

Operational Global Carbon Observing System (GEOCARBON)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

Today, countries use a wide variety of methods to monitor the carbon cycle and it is difficult to compare datafromcountry to country and to get a clear global picture. The current global observational and modelling capabilitiesallow us to produce estimates of carbon budget at different level (from local to global) but many uncertainties stillremain. Decision makers need now more than ever systemat ...
Voir le projet

 27

 TERMINÉ 

Marine Ecosystem Dynamics and Indicators for North Africa (MEDINA)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

...initial phase. Relevant data include satellite earth observations (EO), in-situ monitoring networks, airborne and ground survey information as well as socio-economic data, ecological analyses and national and regional cartographic datasets. Data availability to all parties will be ensured through the GEOSS Common Infrastructure (GCI). Existing software components for data access, processing and mo ...
Voir le projet

 12

 TERMINÉ 

Increasing Resilience through Earth Observation (IncREO)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

...iceable climate change trends. These solutions will be adjusted to the users’ and end-users’ needs and will also reflect on short-term climate change scenarios and related legislature – both on national, supranational and European level. As a multi-risk oriented concept per se any type of natural disaster is addressed. However, selected use cases (dam failure, storm surge and wave height, flood, e ...
Voir le projet

 10

 TERMINÉ 
In June 2008 the Space National Contact Points (NCPs) from 33 EU member states and FP7 associated countries started COSMOS, the “Cooperation Of Space NCPs as a Means to Optimise Services”. NCP networks had been established in other themes already, like IDEALIST, and proved a suitable instrument to interlink according NCPs. This led to added benefit e. g. through new services like specific partner ...
Voir le projet

 26