Rechercher des projets européens

22 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Protection of the border areas in the upper Siret and Prut River Basins against the flood risk, other natural dangerous hazards of water cycle and accidental pollutions and reducing the environmental, economic and social vulnerability of targeted localiteis from the border region against flood risk. ...
Voir le projet

 8

 TERMINÉ 
SedAlp contributes to integrated management of sediment transport in Alpine basins directed to an effective reduction of sediment-related risk while promoting the enhancement of riverine ecosystems and reducing the impacts of hydropower plants (balancing the implementation of EU Directives e.g. RES, Floods and WFD). The project includes piloting actions in various representative Alpine river basin ...
Voir le projet

 14

 TERMINÉ 

Increasing Resilience through Earth Observation (IncREO)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

...iceable climate change trends. These solutions will be adjusted to the users’ and end-users’ needs and will also reflect on short-term climate change scenarios and related legislature – both on national, supranational and European level. As a multi-risk oriented concept per se any type of natural disaster is addressed. However, selected use cases (dam failure, storm surge and wave height, flood, e ...
Voir le projet

 10

 TERMINÉ 
The OrientGate project will foster concerted and coordinated climate adaptation actions across the SEE region. The project will explore climate risks faced by coastal, rural and urban communities; contribute to a better understanding of the impact of climate variability and change on water regimes, forests and agro-ecosystems; and analyse specific adaptation needs in the hydroelectricity, agro-ali ...
Voir le projet

 34

 TERMINÉ 
...Pani addresses the improvement of natural water treatment systems such as river bank filtration (RBF), managed aquifer recharge (MAR) and wetlands in India building on a combination of local and international expertise. The project aims at enhancing water resources and water supply particularly in water stressed urban and peri-urban areas in different parts of the sub-continent. The objective is t ...
Voir le projet

 20

 TERMINÉ 

Transnational ENhancement of ECOPORT8 network  (TEN_ECOPORT)

Date du début: 30 sept. 2012, Date de fin: 29 sept. 2014,

In the recent years the ports are the hub-point of the Core Regional Transport Networks, as precursors for the TEN-T comprehensive network in the South East Europe. In this direction, a great responsibility was entrusted to the port authorities: they are the authority appointed for the Control and the real application of the Environmental Manage System, being the nodes that ensure the environmenta ...
Voir le projet

 16

 TERMINÉ 
...ncentrations in the Barlad river basin; Facilitate the identification of cost-effective measures for river management; Provide support for land-use planning; and Contribute to a future national approach to zones vulnerable to nutrient pollution.
Voir le projet

 4

 TERMINÉ 

Danube WATER integrated management (WATER)

Date du début: 29 juin 2012, Date de fin: 28 juin 2014,

Improving water monitoring and the warnings system, environmental data dissemination on the Romanian-Bulgarian border counties. Processing and conditioning the liquid organic wastes radioactively contaminated from the nuclear plants Cernavodǎ and Kozloduy.
Voir le projet

 13

 TERMINÉ 
...order cooperation in the field of flood prevention.• To serve as a model for establishing a flood warning systems in other border areas.• To strengthen cooperation among BG/GR in international forums on flood risk management on matters of common interest and common solutions Achieveme ...
Voir le projet

 4

 TERMINÉ 
...like flooding and storms can be detected and managed. Nowcasting plays an increasing role in risk prevention, but its realisation is a highly complex and integrated task INCA CE will implement a transnational information system as well as applications for different socio-economic sectors to reduce risks of major economic damage and loss of life. Not only civil protection but also stakeholders from ...
Voir le projet

 18

 TERMINÉ 
The Black Sea Catchment is internationally known as one of ecologically unsustainable development and inadequate resource management, which has led to severe environmental, social and economic problems. EnviroGRIDS @ Black Sea Catchment aims at building the capacities of regional stakeholders to use new international standards to gather, store, distribute, analyze, visualize and disseminate crucia ...
Voir le projet

 30

 TERMINÉ 
...to a diverse set of multi-level risk assessments associated with preserving the multitude of forest goods and services. which will be part of the “ForeStClim”-strategies. The development of transnational coordinated forestry management and forest protection and adaptation strategies will be the principal outcome of the project and help secure the future economic stability of forestry in North-Wes ...
Voir le projet

 21

 TERMINÉ 

Climate Change and Impacts on Water Supply (CC-WaterS)

Date du début: 30 avr. 2009, Date de fin: 29 avr. 2012,

...ter resources and will change according to CC. It is crucial for safeguarding future water supply to anticipate these climate and land use changes and to assess their impacts on water resources. Transnational action is needed to prepare SEE for the challenge of ensuring water supply for society for several decades. Policy makers and water suppliers are required to develop sustainable management pr ...
Voir le projet

 18

 TERMINÉ 

Services and Applications For Emergency Response (SAFER)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

"SAFER aims at implementing preoperational versions of the Emergency Response Core Service. SAFER will reinforce European capacity to respond to emergency situations: fires, floods, earthquakes, volcanic eruptions, landslides, humanitarian crisis. The main goal is the upgrade of the core service and the validation of its performance with 2 priorities: First priority is the short term improvement o ...
Voir le projet

 57

 TERMINÉ 

Drought Management Centre for South East Europe (DMCSEE)

Date du début: 31 mars 2009, Date de fin: 30 mars 2012,

...parison to neighbouring regions. Ineffective water management is seen as the fundamental problem and can induce additional problems when drought occurs. Droughts have become a strategic issue in SEE. National focal points of the UN Convention to Combat Desertification (UNCCD) (national authorities in the field of drought and desertification) and national permanent representatives with World Meteor ...
Voir le projet

 15

 TERMINÉ 

UP-GRADE BLACK SEA SCIENTIFIC NETWORK (UP-GRADE BS-SCENE)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

...gional capacity and performance of marine environmental data and information management, underpins harmonization with European marine data quality control/assessment procedures and adoption of international meta-data standards and data-management practices, providing improved data & information delivery services for the Black Sea region at a European level. The Up-Grade of Black Sea SCENE project ...
Voir le projet

 50

 TERMINÉ 
The major objectives of this Specific Support Action are to: - promote the role played by the Framework Programme in enabling International Cooperation on Global Change and Ecosystems research; - and to facilitate the uptake of the results of the research being carried out. This will be done by using a combined approach of awareness-raising and networking activities.The project will focus in parti ...
Voir le projet

 26

 TERMINÉ 

Improvement of flood management system (MOSES)

Date du début: 30 juin 2005, Date de fin: 29 avr. 2008,

... overall, long-term objective of the project is the reduction of flood damage and an increase in the efficiency of flood management by improving decision-making and tools for local, regional and transnational co-operation at river basin scale. The focus lies on implementation and management, including further development and adjustment to the local situation of a unified GIS-based digital flood in ...
Voir le projet

 8

 TERMINÉ 
...regarding agriculture, forestry and land-use management in flood risk areas. As most river catchments areas belong to more than one country or region, methodologies have to be developed within a transnational and a transregional context that go beyond local concepts. The project regions of FLOODMED are characterised by an increase in the number of people and economic assets located in flood risk z ...
Voir le projet

 14

 TERMINÉ 

Hydrological cycle of the CADSES regions (HYDROCARE)

Date du début: 31 déc. 2005, Date de fin: 30 déc. 2007,

...es to develop an integrated system capable of assessing the impact of hydrometeorological events on the water resources in the CADSES region. Emphasis will be put on the development of effective transnational tools for a rational exploitation of the water resources, with the purpose of preserving and enhancing economical and environmental welfare. Such managing tools will be illustrated also in pr ...
Voir le projet

 11

 TERMINÉ 

Land-sea interaction: coastal state and evolution in CADSES (CADSEALAND)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2006,

... Expected Results: The project targets the following results: - Developing international standards for the definition of a “state of the coast” useful for territorial planning, management, engineering, insurance, etc., which take into account the processes (both on land and at sea ...
Voir le projet

 11

 TERMINÉ 
Background The Bistrita catchment basin is highly sensitive to human activities, and is one of the most polluted basins of the Danube Basin. A Romanian Waters Annual Report on water quality revealed a high concentration of ammonium, nitrates, and organic matter, with high levels of nutrients mainly around two areas –Bacau County – one of the most i ...
Voir le projet

 4