Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

The Once Only Principle Project (TOOP)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

The “Once-Only” Principle Project (TOOP) explores and demonstrates the “once-only” principle through multiple sustainable pilots, using a federated architecture on a cross-border collaborative pan-European scale in order to identify drivers and barriers and to provide a basis for future implementations and wider use. Three pilots are implemented: (1) Cross-border e-Services for Business Mobility, ...
Voir le projet

 21

 TERMINÉ 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Voir le projet

 38

 TERMINÉ 
Provide authorities from the entire cross-border area with means for the coordinated implementation of Community strategies and legislation as well as of bilateral-Conventions regarding emergency preparedness, planning and intervention in case of chemical, biological and radiological/nuclear (CBRN) emergencies.
Voir le projet

 4

 TERMINÉ 

Sustainable Mobility Information Network for the Alpine Space (AlpInfoNet)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

Lacking information about public transport is often an obstacle for travellers to use public transport at all. This is an even bigger challenge when travelling by sustainable transport modes to and within destinations of the Alpine Space, where often cross-border information is needed. This project aims to provide travellers with comprehensive information about sustainable transport modes beyond r ...
Voir le projet

 13

 TERMINÉ 

Early warning system UA SK 2 (EWS UA SR 2) (HUSKROUA/1101/229)

Date du début: 31 déc. 2013, Date de fin: 29 juin 2015,

The overall objective: Based on the successful project Early warning system UA SK (EWS UA SR), to intensify and deepen the cross border cooperation of two regions: Zakarpatska region in UA and Košický kraj in SK in the field of emergency preparedness for floods, fire, and other natural disasters incidents. ...
Voir le projet

 3

 TERMINÉ 
Although avalanches, earthquakes and collapsed buildings are claiming an increasing death toll due to urbanisation, climate change and tourism, Search and Rescue (SAR) operations are limited and expensive. Even research efforts for Search and Rescue services are relatively unimportant due to the specific and therefore limited market for existing products. The main limitations of existing SAR metho ...
Voir le projet

 9

 TERMINÉ 

Economically and environmentally sustainable Lake Peipsi area (COMMON PEIPSI)

Date du début: 16 févr. 2011, Date de fin: 30 déc. 2014,

Lake Peipsi is the largest transboundary lake in Europe, which is shared between Estonia and Russia. Both countries influence the environmental situation of the lake. From the RU side the biggest problem is currently the contamination of Lake Peipsi due to the poor wastewater treatment. On the Estonian side one of the factors that influences the environmental condition of the lake is the lack of h ...
Voir le projet

 11

 TERMINÉ 
The main purpose of this project is to improve coherence and consistency among risk assessments undertaken by the countries at national and local level, and especially in case of disasters intensified by climate change. The project builds on the EU Council conclusions on "Further Developing Risk Assessment for Disaster Management within the European Union" adopted in March 2011, that aims for a co ...
Voir le projet

 20

 TERMINÉ 

Managing Migration and its Effects in SEE - Transnational Actions Towards (SEEMIG)

Date du début: 31 mai 2012, Date de fin: 29 nov. 2014,

The SEE region faces a complex, nationally and regionally diverse set of demographic, migratory and labour market challenges (low or declining fertility, large scale out-migration, brain and care drain, ageing, low labour force participation rate). Together with further aspects like gender, age and the given territorial heterogeneity of the programme area, they are creating a complex challenge to ...
Voir le projet

 28

 TERMINÉ 

Increase Innovation and Research within Security Organisations (INSec)

Date du début: 1 avr. 2012, Date de fin: 31 juil. 2014,

...nd social wealth.Based on security organisations involved as partners in the consortium, 4 different kind of management systems will be specifically addressed, respectively for-Rescue Services actors-Ministry of Interiors-Security Sciences Academies-MunicipalitiesThe implementation of INSec will enable Security organisations to:• Systematise Innovation and Research activities to take advantage of ...
Voir le projet

 19

 TERMINÉ 

Joint Risk Monitoring during Emergencies in the Danube Area Border (JRM )

Date du début: 21 juin 2011, Date de fin: 20 juin 2014,

Improvement of the emergency preparedness and intervention, efficient prevention, monitoring and disaster consequences mitigation and fight for combating pollution of environmental factors in the eligible area. Creating of an integrated system to prevent disasters caused by hail in Dolj-Vidin border region and its extension over the all Romania-Bulgaria border region. The increasing of information ...
Voir le projet

 8

 TERMINÉ 
"Enhancing European Coordination for National Research Programmes in the Area of Security at Major Events – THE HOUSE is aimed at strengthening the ERA on Major Events security by applying the research coordination tools/methodologies developed during seven years of activity within the projects EU-SEC and EU-SEC II. THE HOUSE builds on the assumption that Major Events are “windows of opportunity” ...
Voir le projet

 25

 TERMINÉ 

Early warning system UA SK (HUSKROUA/0901/136)

Date du début: 23 mars 2011, Date de fin: 22 avr. 2014,

The overall objective is:▪ To intensify and deepen the cross border cooperation of two regions: Zakarpatska region in Ukraine and Košický kraj in Slovakia in the field of emergency preparedness for floods, fire, and other natural disasters incidentsSpecific objectives: ▪ To establish EWS UA SK - a joint early warning system in the floodplains of the rivers Uzh, Tisa, Latorica, and Bodrog in Zakarp ...
Voir le projet

 3

 TERMINÉ 

Efficient Integrated Security Checkpoints (EFFISEC)

Date du début: 1 mai 2009, Date de fin: 31 janv. 2014,

Illegal immigration and illicit material detection is a growing concern at the European borders; in that respect border security checkpoints must be particularly efficient against any kind of threat. If airport checkpoints controls are today technically improving, land and seaport checkpoints differ strongly from airports ones and are more complex to process. During the last years, most of the eff ...
Voir le projet

 18

 TERMINÉ 

Danube Border Police Cooperation in the HR-HU border area (CoPo)

Date du début: 31 août 2011, Date de fin: 30 déc. 2012,

The project aims at improving overall regional security and will contribute to all cross-border development. This will be achieved by establishing a HU-HR Common Contact Point Office (CCPO) ensuring simplified, swift, secure and efficient cooperation between border policing partner authorities. As a result close cooperation shall be established between Croatian and Hungarian border police, among o ...
Voir le projet

 3

 TERMINÉ 
The overall aim of Egoprise is to turn public administrations in rural BSR areas to more business oriented service suppliers, to relieve SMEs from administrative burdens, improve their access to information & qualified staff and as a consequence to increase attractiveness of rural areas as places to live, work & invest in. BACKGROUND:E-government potentials are not exploited so far: The developmen ...
Voir le projet

 22

 TERMINÉ 
"The proposal “Coordinating National Research Programmes and Policies on Security at Major Events in Europe” (EU-SEC II) builds upon the EU-SEC project. Making full use of the capabilities and experience of its Consortium Partners - governmental authorities from EU MS - and avoiding overlapping with ongoing activities, EU-SEC II aims to respond to the dispersion of efforts and lack of coherence th ...
Voir le projet

 25

 TERMINÉ 

Common Operational Picture Exploitation (COPE)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2011,

"The Common Operational Picture Exploitation (COPE) project will integrate COTS solutions and novel technologies to achieve a step change in information flow both from and to the first responder in order to increase situational awareness across agencies and at all levels of the command chain. A user-driven approach will be taken to develop new technologies for supporting user information requireme ...
Voir le projet

 9

 TERMINÉ 

Baltic Euroregional Network (BEN)

Date du début: 11 juil. 2005, Date de fin: 30 déc. 2008,

The objective of the Baltic Euroregional Network (BEN) was to promote spatial development and territorial integration in the Baltic Sea Region (BSR) by strengthening Euroregions as competent partners with national authorities and international institutions, and by building a network of Euroregions for continuous capacity-building and sharing of experience. In order to achieve the objectives, the p ...
Voir le projet

 37

 TERMINÉ 

Female Entrepreneurs´Meetings in the Baltic Sea Region (FEM)

Date du début: 14 août 2004, Date de fin: 13 août 2008,

FEM has promoted womens access to labour markets and entrepreneurship and strengthened the role of women in local and regional development by e.g. training, mentoring, networking and creating meeting-places. Gender sensitivity and gender mainstreaming have been key issues in the project. The aim has been to produce sustainable positive changes in the attitudes, processes and methods of economic an ...
Voir le projet

 41

 TERMINÉ 
The Trans-European railway Rail Baltica, linking Helsinki – Tallinn – Riga – Kaunas – Warsaw and continuing on to Berlin, is to be developed within the territories of the co-operating EU Member States.The Interreg IIIB project Rail Baltica had two main goals: (a) the definition of the most favourable route for the Rail Baltica railway link in terms of spatial planning and regional development, and ...
Voir le projet

 23

 TERMINÉ 

EUROBALTIC Civil Proctection Project II (Eurobaltic II)

Date du début: 25 sept. 2005, Date de fin: 24 janv. 2008,

EUROBALTIC II is the follow up of the BSR INTERREG IIIB project "EUROBALTIC Programme for Civil Protection in the BSR", which has established a general framework of cooperation in the area of civil protection, allowed common identification of risks and need for actions in the BSR, and resulted in a joint understanding among the project partners regarding priorities for addressing shortcomings in t ...
Voir le projet

 35

 TERMINÉ 
Effective public sector action is a cornerstone of spatially balanced and sustainable development in the Baltic Sea Region. Especially rural areas need administrative support for compensating lower economic potentials for the benefit of their population. ASAP created innovative solutions to meet the most urgent challenges for rural development in the Baltic Sea Region in an integrated way: Demogra ...
Voir le projet

 38

 TERMINÉ 
Protected cross-border regions in the CADSES area face similar problems. Often frontiers divide one region of cultural and natural heritage into more than one national park, biosphere reserve, nature reserve or protected landscape area and they are situated in two or more countries. As a consequence, two or more administrations, management structures and - if existing - spatial information systems ...
Voir le projet

 19

 TERMINÉ 
The REVITAMIN project, the revitalisation of mining regions, is aimed at upgrading and developing landscapes after mining activities have ceased. The first priority of the project is transnational co-operation and extensive knowledge and experience transfer as the structural and landscape changes provide many challenges, particularly for mining regions. Regardless of individual issues concerning m ...
Voir le projet

 24