Rechercher des projets européens

9 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The overall objective of the project is to contribute to improvement of traffic conditions of the IA Pan-European Transport Corridor by improving the conditions for transit and long distance traffic and reducing the problems caused by the traffic with which inhabitants of Panemune settlement (Lithuania) and Sovetsk town (Russia) are encountering. ...
Voir le projet

 2

 TERMINÉ 

Improving Road Infrastructure Safety in the Baltic Sea Region (BALTRIS)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

...with the best and the worst road safety situation which allows addressing the most problematic areas in the region and provides opportunities for exchange of good practice.The Project is led by Lithuanian Road Administration. The support to the Project idea and readiness to co-operate was expressed by the Polish Road Administration, Latvian Road Administration, Baltic Road Association and Nordic R ...
Voir le projet

 7

 TERMINÉ 
The EWTC II project started in 2009 and was a follow up of the EWTC project completed in 2007, with the overall aim to highlight the development of a ”Green Corridor Concept” as a best practise case in the European context. Green transport corridors are defined as a concentration of freight traffic between major hubs and by relatively long distances where short sea shipping, rail, inland waterways ...
Voir le projet

 29

 TERMINÉ 

ERA-NET ROAD II (ENR2)

Date du début: 1 mai 2009, Date de fin: 31 déc. 2011,

"ERA-NET ROAD II’s aim is to strengthen the European Research Area in road research by coordinating national and regional road research programmes and policies. The consortium comprises owners and managers of road research programmes in fifteen countries and two regions, i.e. the eleven National Road Administrations active in the first ERA-NET ROAD plus four more National Road Administrations and ...
Voir le projet

 21

 TERMINÉ 

BALTIC SEA INFORMATION MOTORWAYS (BaSIM)

Date du début: 31 août 2004, Date de fin: 30 déc. 2007,

Shipment of goods in the BSR increases and will grow in the future even faster. The concept of Baltic Sea Motorways along transnational transport corridors will be based on strong cooperations between players in the transportation field as well as on industry side. Improvement of productivity and competitiveness needs the development both physical and information infrastructure. The first being ad ...
Voir le projet

 29

 TERMINÉ 

East-West Transnational Transport Corridor in the S-BSR (EAST-WEST)

Date du début: 31 déc. 2005, Date de fin: 30 déc. 2007,

In the Baltic Sea Region, trade and traffic in the east-west direction is increasing dramatically. The need to develop sustainable transport in the east-west direction is therefore of outmost importance. The “East-West transport Corridor (EWTC)” between Vilnius and Esbjerg via the Öresund region, includes several TEN-T ports, road and railways links, parts of the Nordic triangle and Corridor IX B/ ...
Voir le projet

 47

 TERMINÉ 
The Baltic Sea Region is facing an increasing urban traffic which contributes to pollution abundance and less attractive cities. Baltic Sea Cycling is a co-operation between 22 partners in Germany, Latvia, Lithuania, Norway, Poland and Sweden for the development of sustainable and attractive townscapes. The project has addressed problems concerning the integration of cycling as a part of urban tra ...
Voir le projet

 22

 TERMINÉ 
Transportation of passengers and goods increases dramatically in the South Baltic Sea area. However, existing infrastructure and transport solutions are not enough equipped to manage the growth in an efficient and sustainable way. The challenging development called upon joint actions among organisations in several countries and on various levels. In the Baltic Gateway project, regional and local a ...
Voir le projet

 38

 TERMINÉ 
...elopment administrative capacities of the regional institutions. The project is implemented in two stages: firstly, the technical documentation on rebuilding and reconstruction of border roads on the Lithuanian side is drawn; secondly, several roads leading to the border with Poland are rebuilt or reconstructed according to the technical documentation prepared.The project is a continuation of the ...
Voir le projet

 10