Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

IP1 Traction TD1 and Brakes TD5 – Phase 1 (PINTA)

Date du début: 1 sept. 2016, Date de fin: 30 nov. 2018,

The PINTA Project (IP1 Traction TD1 and Brakes TD5 – Phase 1) will address the two key topics highlighted in the first Shift2Rail Call topic S2R-CFM-IP1-01-2016 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management.Traction subproject will focus on the improvement of seven technical and economical pe ...
Voir le projet

 9

 TERMINÉ 
CONNECTA aims at contributing to the S2R’s next generation of TCMS architectures and components with wireless capabilities as well as to the next generation of electronic braking systems. CONNECTA will conduct research into new technological concepts, standard specifications and architectures for train control and monitoring, with specific applications in train-to-ground communications and high sa ...
Voir le projet

 9

 TERMINÉ 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Voir le projet

 34

 TERMINÉ 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Voir le projet

 48

 TERMINÉ 

Shock-robust Design of Plants and their Supply Chain Networks (RobustPlaNet)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The RobustPlaNet project aims at developing an innovative technology-based business approach that will drastically change the current rigid supply chain mechanisms and the current product-based business models into collaborative and robust production networks able to timely deliver innovative product-services in very dynamic and unpredictable, global environments. This technology-based business ap ...
Voir le projet

 12

 TERMINÉ 

Mejora de la formación profesional del IES Ángel Corella

Date du début: 1 sept. 2015, Date de fin: 31 août 2016,

The main aim is to achieve students’ comprehensive training in personal maturity, professional competences and linguistic skills, and improving the studetnts education quality by improving teachers training. In our project, we count with the support of the peer institutions is, without any doubt, guarantee of quality in the development of mobilities: - They have helped us in the selection of each ...
Voir le projet

 16

 TERMINÉ 

Eddy CUrrent Brake Compatibility (ECUC)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

...ct of ECUC embraces the terms safety, interoperability and economy, and is addressed to the main stakeholders in the European railway industry. The medium-sized ECUC consortium is formed by CEIT (S), KNORR-BREMSE (D), ALSTOM (F), SNCF (F), DEUTSCHE BAHN (D), NETWORK RAIL (UK), UNIFE (B) and FRAUSCHER (AUT). The proposal describes the consortium's strategy in order to guarantee highly efficient coo ...
Voir le projet

 9

 TERMINÉ 

ERRAC Road Map

Date du début: 1 juin 2009, Date de fin: 31 juil. 2012,

ERRAC- ROADMAP covers research related to all types of freight and passenger rail services as well as their interaction with other modes within the transport system (High Speed and conventional rail over long, medium and short distances, as well as urban rail and co-modal services), the implementation of such research, and to support the various activities of the European Rail Research Advisory Co ...
Voir le projet

 21

 TERMINÉ 

Highly Automated Vehicles for Intelligent Transport (HAVE-it)

Date du début: 1 févr. 2008, Date de fin: 31 juil. 2011,

Description The groundbreaking HAVEit proposal aims at the long-term vision of highly automated driving. Within this proposal important intermediate steps will be developed, validated and demonstrated. These intermediate results on the one hand offer high potential for exploitation within 3-5 years after HAVEit and on the other hand form the ...
Voir le projet

 29

 TERMINÉ 
Mechatronik verbindet Mechanik, Elektrik und Informatik. Mechatroniker werden v.a. firmen-und länderübergreifend eingesetzt. Sie sind die ersten an den Brennpunkten der industrieller Fertigung, d.h. bei Störungen und Ausfällen an hochautomatisierten Anlagen, deren Stillstand in jeder Minute hohen wirtschaftlichen Schaden auslöst.Obwohl der fach- und länderübergreifende Einsatz von Mechatronikern r ...
Voir le projet

 22

 TERMINÉ 
Mechatronik verbindet Mechanik, Elektrik und Informatik. Mechatroniker werden v.a. firmen-und länderübergreifend eingesetzt. Sie sind die ersten an den Brennpunkten der industrieller Fertigung, d.h. bei Störungen und Ausfällen an hochautomatisierten Anlagen, deren Stillstand in jeder Minute hohen wirtschaftlichen Schaden auslöst.Obwohl der fach- und länderübergreifende Einsatz von Mechatronikern r ...
Voir le projet

 22