Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Voir le projet

 72

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Voir le projet

 29

 TERMINÉ 

Demonstration of soft stimulation treatments of geothermal reservoirs (DESTRESS)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

DESTRESS is aimed at creating EGS (Enhanced geothermal systems) reservoirs with sufficient permeability, fracture orientation and spacing for economic use of underground heat. The concepts are based on experience in previous projects, on scientific progress and developments in other fields, mainly the oil & gas sector. Recently developed stimulation methods will be adapted to geothermal needs, app ...
Voir le projet

 16

 TERMINÉ 
ROLINCAP will search, identify and test novel phase-change solvents, including aqueous and non-aqueous options, as well as phase-change packed bed and Rotating Packed Bed processes for post-combustion CO2 capture. These are high-potential technologies, still in their infancy, with initial evidence pointing to regeneration energy requirements below 2.0 GJ/ton CO2 and considerable reduction of the e ...
Voir le projet

 12

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 
Running title for this project is “A New Dimension in Asia-Europe Relations (NEAR): Exploring EU’s Global Actorness and Strategic Partnership in Asia (China, India, Japan and South Korea).” The ASEM framework, which celebrates its twentieth anniversary in 2016, provides one of background factors of this project. EU’s cooperation with Asia should be strengthened in the future, given the potential o ...
Voir le projet

 1

 TERMINÉ 
REMINDER aims to develop an embedded DRAM solution optimized for ultra-low-power consumption and variability immunity, specifically focused on Internet of Things cut-edge devices. The objectives of REMINDER are :i) Investigation (concept, design, characterization, simulation, modelling), selection and optimization of a Floating-Body memory bit cell in terms of low power and low voltage, high relia ...
Voir le projet

 9

 TERMINÉ 
CHEM2NATURE addresses current limitations of UMINHO in the Chemistry field regarding its scientific know-how and partnerships with world-leading institutions. UMINHO seeks to improve the multifunctionality of natural-origin polymers, often with limited bioactivity and stimuli-responsiveness, and increase the performance of cell-based therapies. Introducing such properties by precision chemical mod ...
Voir le projet

 5

 TERMINÉ 

Federated Interoperable Semantic IoT/cloud Testbeds and Applications (FIESTA)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

...rated experiments, which seamlessly transcend the boundaries of multiple IoT platforms. FIESTA will be validated and evaluated based on the interconnection of four testbeds (in Spain, UK, France and Korea), as well as based on the execution of novel experiments in the areas of mobile crowd-sensing, IoT applications portability, and dynamic intelligent discovery of IoT resources. In order to achi ...
Voir le projet

 15

 TERMINÉ 

Materials’ Innovations for a Safe and Sustainable nuclear in Europe (MATISSE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Voir le projet

 32

 TERMINÉ 
CITI-SENSE will develop “citizens’ observatories” to empower citizens to contribute to and participate in environmental governance, to enable them to support and influence community and societal priorities and associated decision making. CITI-SENSE will develop, test, demonstrate and validate a community-based environmental monitoring and information system using innovative and novel Earth Observa ...
Voir le projet

 32

 TERMINÉ 
"Windows are critical elements to control the energy performance of buildings especially for zero-energy buildings. It is of paramount importance to develop windows which show reduced U-value, weight and costs and certain features to control and harvest energy. Such a window will have a high impact in the window industry and will reduce green house gas emissions as long as the window is affordable ...
Voir le projet

 15

 TERMINÉ 
The main target at which SMARTFIRE aims is the design and implementation of a shared experimental facility spanning different islands located in Europe (EU) and South Korea (KR). This large scaled facility will promote joint experimentation among EU and KR experimenters, encouraging them to conceive and implement innovative protocols, able to take advantage of the current leading network technolog ...
Voir le projet

 12

 TERMINÉ 

Advanced Radio Astronomy in Europe (RADIONET3)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

RadioNet is an I3 that coordinates all of Europe’s leading radio astronomy facilities in an integrated cooperation to achieve transformational improvement in the quality and quantity of the scientific research of European astronomers. RadioNet3 includes 27 partners operating world-class radio telescopes and/or performing cutting-edge R&D in a wide range of technology fields important for radio ast ...
Voir le projet

 29

 TERMINÉ 

Open Collaborative Model for Tuberculosis Lead Optimisation (ORCHID)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2015,

"Early stage Drug Discovery efforts over the last 5 years have resulted in the identification of a number of promising lead compounds in the fight against TB. These leads need to be further progressed and optimised into candidates for pre-clinical development through the Drug Development progression cascade.Three compound families are of particular interest: 1) InhA Inhibitors, 2) New potent whole ...
Voir le projet

 14

 TERMINÉ 

Network of Excellence in Internet Science (EINS)

Date du début: 1 déc. 2011, Date de fin: 31 mai 2015,

The goal of EINS is coordinating and integrating European research aimed at achieving a deeper multidisciplinary understanding of the development of the Internet as a societal and technological artefact, whose evolution is increasingly interwined with that of human societies. Its main objective is to allow an open and productive dialogue between all the disciplines which study Internet systems und ...
Voir le projet

 48

 TERMINÉ 

Small-molecule Inhibitor Leads Versus emerging and neglected RNA viruses (SILVER)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2015,

RNA virus infections kill millions of humans annually, largely due to the lack of suitable vaccines and drugs to control them. This problem is addressed in this FP7 call and in response a consortium of Europe’s and Asia’s leading molecular virologists, structural biologists, medicinal chemists and bioinformaticians has been brought together to generate a state-of-the-art drug discovery and design ...
Voir le projet

 25

 TERMINÉ 

MATerials TEsting and Rules (MATTER)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Voir le projet

 30

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

Support at the Virtual Atomic and Molecular Data Centre (SUP@VAMDC)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2014,

The Virtual Atomic and Molecular Data Centre (VAMDC) is a major new European initiative now building a unified, secure, documented, flexible and interoperable e-science environment-based interface to 17 existing A+M databases.The SUP@VAMDC (Support at VAMDC) aims at building upon the VAMDC e-infrastructure, supporting different studies and actions linked to the VAMDC e-infrastructure that will in ...
Voir le projet

 9

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 

Svalbard Integrated Arctic Earth Observing System - Preparatory Phase (SIOS-PP)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2014,

"Environmental change and climate change in particular, are expected to be most pronounced in the polar regions. For this reason, a multi-disciplinary research infrastructure covering all important elements of the coupled Earth System in the Arctic is a very valuable tool to quantify the ongoing global change and to verify the capability of Earth System models to predict future changes. The propos ...
Voir le projet

 26

 TERMINÉ 
The IoT6 project aims at exploiting the potential of IPv6 and related standards (6LoWPAN, CORE, COAP, etc.) to overcome current shortcomings and fragmentation of the Internet of Things, in line with the CERP-IoT and EC recommendations.Its main challenges and objectives are to research, design and develop a highly scalable IPv6-based Service-Oriented Architecture to achieve interoperability, mobili ...
Voir le projet

 9

 TERMINÉ 

LOD2 - Creating Knowledge out of Interlinked Data (LOD2)

Date du début: 1 sept. 2010, Date de fin: 31 août 2014,

Description Creating Knowledge out of Interlinked Data - Research and development of novel, innovative Sematic Data Web technologies. - Expansion and integration of openly accessible and interlinked data on the web. - Adoption and implementation of Linked Data for media, enterprise and government.LOD2 will integrate and syndicate linked d ...
Voir le projet

 17

 TERMINÉ 
"With 14.4 million prevalent cases and 1.7 million deaths tuberculosis (TB) remains one of the most serious infectious diseases to date. An estimated 2 billion people are believed to be infected with Mycobacterium tuberculosis and at risk of developing disease. Multi- and extensively drug resistant strains are increasingly appearing in many parts of the world, including Europe. While with current ...
Voir le projet

 39

 TERMINÉ 
With the accelerating materials development cycles, the development of simulation approaches for predictive, de-novo characterization and optimization of materials and device properties emerges as a grand challenge to European R&D. A unified multi-disciplinary approach towards the deployment of models, tools, algorithms and simulation and visualization techniques is required to transform isolated ...
Voir le projet

 10

 TERMINÉ 

Bringing the Media Internet to Life (3DLife)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2013,

3DLife will integrate leading European research groups to create a long-term integration of critical mass for innovation of currently fragmented research addressing media Internet. The main objective of the NoE are:-To foster the creation of sustainable relationships between existing national research groups and to start development of a Virtual Centre of Excellence in the field.-To create suffici ...
Voir le projet

 7

 TERMINÉ 
... will focus on bringing MOFs to key market sectors - gas separation and storage, liquid separation and catalysis. The Total-led consortium, with 11 academic partners from across EU, one leading South Korean partner, among world leaders among their particular domain of MOF science, will be contributing to the project, with a dedicated management partner. MACADEMIA intends to produce new MOFs and op ...
Voir le projet

 17

 TERMINÉ 

European Middleware Initiative (EMI)

Date du début: 1 mai 2010, Date de fin: 30 avr. 2013,

The European Middleware Initiative is a collaboration of the three major middleware providers in Europe, ARC, gLite and UNICORE, and other consortia. EMI aims to deliver a consolidated set of middleware components for deployment in EGI, PRACE and other DCIs; extend the interoperability between grids and other computing infrastructures; strengthen the reliability of the services; and establish a su ...
Voir le projet

 26

 TERMINÉ 

Severe Accident Research Network of Excellence 2 (SARNET2)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Voir le projet

 45

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet-FP7)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

RadioNet is an integrating activity that has pulled together ALL of Europe's leading radio astronomy facilities to produce a focused, coherent and integrated proposals that will significantly enhance the quality and quantity of science performed by European astronomers. RadioNet FP7 has 25 partners. They range from operators of major radio telescope facilities to laboratories that specialise in m ...
Voir le projet

 28

 TERMINÉ 

A Preparatory phase proposal for the Square Kilometre Array (PrepSKA)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2012,

The Square Kilometre Array (SKA) will be one of the largest scientific projects ever undertaken. It is a machine designed to answer some of the big questions of our time: what is Dark Energy? Was Einstein right about gravity? What is the nature of dark matter? Can we detect gravitational waves? When and how did the first stars and galaxies form? What was the origin of cosmic magnetism? How do Eart ...
Voir le projet

 24

 TERMINÉ 

European Asia-Pacific Cooperation on ICT Research (EURASIAPAC)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2011,

...EURASIAPAC aims at developing a concrete EU-ASIA-PACIFIC ICT Cooperation Strategy to provide this necessary strategic thrust for the European ICT research cooperation with the target countries Japan, Korea, Australia and New Zealand.Building on previous initiatives, e.g. COJAK or ASIACOOP, the consortium will carry out an extensive information gathering effort. This will consist of an in-depth sur ...
Voir le projet

 6

 TERMINÉ 

IMS2020: Supporting global research for IMS 2020 Vision (IMS2020)

Date du début: 1 janv. 2009, Date de fin: 31 juil. 2011,

... specific IMS level research topics. The IMS2020 Consortium combines together industries, industrial associations, research centres and universities coming from all IMS Regions (EU, Switzerland, USA, Korea, Japan). The IMS2020 project will benefit from the heritage of the successful initiative IMS NoE, coordinated by Politecnico di Milano.
Voir le projet

 15

 TERMINÉ 
"Improvements in TB control require the development of new tools for rapid and accurate diagnosis and intervention. This development is likely to benefit from more detailed knowledge of microbe-host relationships during infection. Following M. tuberculosis infection, only 5-10% of immunocompetent individuals develop TB. It is increasingly thought that the virulence of the infecting strain, togethe ...
Voir le projet

 11

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167

 TERMINÉ 

KOR-EU Leaders for Global Education

Date du début: 1 déc. 2010,

...universities: Central Ostrobothnia University of Applied Sciences and University of Oulu (Finland), University of Innsbruck (Austria), and University of Tallinn (Estonia). Three universities form the Korean consortium: Chungbuk National University, Sunchon National University and Korea University. Major activities for this three year project are: (1) exchange of 40 undergraduate students with focu ...
Voir le projet

 7

 TERMINÉ 
EM-BEAM program is mainly dedicated to research exchanges and will establish mobility scheme for more than 80 individuals, doctorates (57%), post-docs (14%) and staff (29%). More than 60% of the individuals will be European. The program is focused, but not restricted, on the main thematic fields tackling the XXIst Century challenges like Engineering, Mathematics and Informatics, and Natural Scienc ...
Voir le projet

 12