Rechercher des projets européens

17 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
17 partners from11 countries covering all building life cycle will develop an innovative Integrated Evolutionary Design Methodology that can allow the stakeholders to predict the current and future energy efficiency of buildings (both at individual level and neighbourhood level) and make better informed decision in optimising the energy performance at building life cycle level, including operati ...
Voir le projet

 19

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 
Prospective global supply and demand for gallium, indium and other key metals show an increasing discrepancy, amongst others due to the explosive growth of green technologies such as photovoltaics (PV) and solid-state lighting (SSL). While their primary production is highly controlled by a few countries, recycling systems to reclaim these materials from discarded products are not yet in place. Thi ...
Voir le projet

 12

 TERMINÉ 
REEcover aims to:A) Improve European supply of the critical Rare Earth Elements Y, Nd, Tb and DyB) Strengthen SME positions in REE production and recovery value chainC) Innovate and research two different routes for hydro/pyro metallurgical recovery of REEs: as Rare Earth Oxides (REO) or Rare Earth Oxy-Carbides (REOC) in electrolytic reductionD) Demonstrate and compare viability and potential for ...
Voir le projet

 16

 TERMINÉ 

Cold Spray Radical Solutions for Aeronautic Improved Repairs (CORSAIR) (CORSAIR)

Date du début: 1 juin 2013, Date de fin: 30 nov. 2016,

CORSAIR project is a wide investigation concerning the capabilities of Cold Spray Technology for maintenance and repair of aeronautic frames and components. Today, deep and systematic investigation in Cold Spray is required to better understand the capabilities and fully validate the technology in aeronautics. In this scenario, the activities planned in CORSAIR project are (1) Explore the real cap ...
Voir le projet

 13

 TERMINÉ 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Voir le projet

 32

 TERMINÉ 

ETCS Advanced Testing and Smart Train Positioning System (EATS)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2016,

Currently European Train Control System (ETCS) rollout is a major concern for the railway sector. Equipment for ETCS level 1 and 2 typically follows a long process before being put into service due to interpretation variations in the specification and certification procedures requiring long and expensive field-testing. On the other hand, migration from ETCS level 2 to 3 has not been yet foreseen d ...
Voir le projet

 9

 TERMINÉ 

Integrated Components for Assisted Rescue and Unmanned Search operations (ICARUS)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Voir le projet

 29

 TERMINÉ 
The stringent Solvent Emission Directive (1999/13/EC), fully transposed in 2007, imposes limitations of emissions of volatile organic compounds (VOC) due to the use of organic solvents in paints and varnishes. The most economical way of limiting VOC emission is using water-based coating formulas in which water replaces a substantial amount of the organic solvents traditionally used. Unfortunately, ...
Voir le projet

 15

 TERMINÉ 
Seven European cities (Bordeaux, Copenhagen, Eindhoven-Helmond, Newcastle, Thessaloniki, Verona & Vigo) have joined forces with the objectives of substantially improving road safety, increasing energy efficiency and reducing level of congestions for road transport.In order to address these topics the cities and industrial partners will jointly implement three cooperative services, Road Hazard Warn ...
Voir le projet

 34

 TERMINÉ 

Pro-active decision support for data-intensive environments (ASTUTE)

Date du début: 1 mars 2011, Date de fin: 31 mai 2014,

"ASTUTE aims at defining reference architecture for the development of HMIs, targeting proactive information retrieval and delivery based on situational context, as well influenced by information content and services, and user state information. This architecture will support the user intentions, optimizing the choices available to the user, while keeping the user in control of the situation. Veri ...
Voir le projet

 22

 TERMINÉ 
Cardiovascular disease (CVD) has a significant impact on the European society in terms of mortality, morbidity and allied healthcare costs. The opportunity of multi-scale modelling spanning, sub-cellular level up to whole heart is to improve CVD outcomes by providing a consistent, biophysically-based framework for the integration of the huge amount of fragmented and inhomogeneous data currently av ...
Voir le projet

 21

 TERMINÉ 

Business Models for User Centred Products (MADE4U)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

Recent research results by one of the partners have shown that human beings display unique behaviour (visual strategy), in the way they look at objects. Thus it has been (2006) possible to create spectacles with Progressive Addition lenses which were personalized to a subject’s visual strategy, finding that they dimensionally improved overall user experience, practically eliminating the spectacle- ...
Voir le projet

 15

 TERMINÉ 
FRESHFILM will create a highly-functional film food packaging, that will strongly serve two main end-user communities: Food Processing Industry & Plastic Packaging Industry (meat processing vs. fresh food processing). These are mature sectors which create annual revenues in Europe in €147 billion and €12 billion respectively and require continues innovation to differentiate in a strong-competition ...
Voir le projet

 10

 TERMINÉ 
The overall technological aim is to develop a mould-brick acoustic solution based on noise absorption and insulation due material density and porosity that will at least increase levels in 6 dB in performance but at a 20% lower weight and will avoid or minimize noise flanking. The acoustic insulation and absorption of the brick will be achieved by developing the concept of layers oand forms in the ...
Voir le projet

 9