Rechercher des projets européens

37 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Voir le projet

 38

 TERMINÉ 
"Heavy metal pollution is one of the most important environmental problems today even threatening human life. A large number of industries produce and discharge wastes containing different heavy metals into the environment and do not comply with current EU directives. BIOMETAL DEMO project aims at demonstrating the feasibility of the application of novel biotechnologies for the treatment of metal ...
Voir le projet

 10

 TERMINÉ 
Energy efficiency becomes crucial for rational consumption of the available resources and reduction of the CO2 production. But the reduction of energy consumption as the only remedy is only a partial solution. Similar, applying more environment-neutral or renewable energy sources without smart management systems may even cause failures in the energy grid or at least cause the energy to be wasted. ...
Voir le projet

 12

 TERMINÉ 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

"LNG Blue Corridors unites/mobilizes the critical mass of experience (know-how, expertise, (industrial) parties and stakeholders) in LNG transport and infrastructure technology. It involves cooperation between heavy duty vehicle manufacturers, fuel suppliers, fuel distributors and fleet operators. The project includes a first definition of European LNG Blue Corridors, with strategic LNG refuelling ...
Voir le projet

 27

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 
The main goal of the ENHANCE project is to develop and analyse new ways to enhance society’s resilience to catastrophic natural hazard impacts, by providing new scenarios and information in selected hazard cases in close collaboration with stakeholders, and by contributing to the development of new multi-sector partnerships (MSPs) to reduce or redistribute risk. Innovation in MSPs is essential, a ...
Voir le projet

 24

 TERMINÉ 
The objective of the FIGARO project is to significantly reduce the use of fresh water on farm level through developing a cost-effective, precision irrigation management platform. The platform will be structured for data acquisition from monitoring devices and forecasting tools, data interpretation, system control, and evaluation mechanisms enabling full decision support for end users at farm scale ...
Voir le projet

 18

 TERMINÉ 
The general objective of EFEVE project is the improvement of the new technologies to manufacturing of materials (aluminium and magnesium alloy) and processes and new technologies of production that are more energy efficient, improve manufacturing productivity, optimize raw material consumption, flexible mold changes and manufacturing capability of producing multiple components, ...etc.The developm ...
Voir le projet

 18

 TERMINÉ 
Cultivation of edible mushrooms Agaricus Bisporus in Europe is an economically valuable Industry that employs 50,000 employees with a production 965,000 tonnes and 1,300M Euros sales. Pests and diseases in this industry causes loses of 60M Euros related to Pest control. The main pest insects causing crop losses in Europe are Sciarid flies, whereas the main diseases are the fungus Verticillium, My ...
Voir le projet

 11

 TERMINÉ 
"Modular construction is used in housing and residential buildings because it is fast to construct and of high quality. This proposal provides the research necessary to extend two types of modular building systems into high-rise building applications where means of providing stability and in some areas, seismic resistance are very important. In addition, the proposal will lead to quantification o ...
Voir le projet

 11

 TERMINÉ 

Secure idenTity acrOss boRders linKed 2.0 (STORK 2.0)

Date du début: 1 avr. 2012, Date de fin: 30 sept. 2015,

"Secure idenTity acrOss boRders linKed 2.0" builds on the success and results of STORK by taking further steps to decisively push the lines for wider uptake of eID in Europe, aiming at realising a single European electronic identification & authentication area. Its highly innovative focus lies on the convergence of private and public sectors in an operational framework and infrastructure encompass ...
Voir le projet

 65

 TERMINÉ 

Neuronal NanoCarbon Interfacing Structures (NeuroCare)

Date du début: 1 mars 2012, Date de fin: 28 févr. 2015,

NeuroCare aims to create better retinal, cortical and cochlear implantable devices through the use of improved interfacing between the electronic implants and living cells. The NeuroCare concept involves low-cost, carbon-based materials, well-adapted for medical implants, because they (i) offer wide range of electronic properties (metal, semiconductor and insulator), (ii) are bio-inert and (iii) a ...
Voir le projet

 14

 TERMINÉ 
The ENCOURAGE project aims to develop embedded intelligence and integration technologies that will directly optimize energy use in buildings and enable active participation in the future smart grid environment. The desired energy savings will be achieved in three complementary ways. Firstly, by developing supervisory control strategies that will be able to coordinate larger subsystems (HVAC,lighti ...
Voir le projet

 12

 TERMINÉ 
In contrast to other renewable energy sources, wave energy conversion is currently at a stage of evolution where it is being demonstrated using a wide range of very diverse technologies and a de facto standard approach is yet to emerge. A fully functional, but reduced scale prototype Wavebob wave energy converter (WEC) has already been deployed in the Atlantic Ocean. STANDPOINT will seek to demons ...
Voir le projet

 6

 TERMINÉ 

Wireless Hybrid Enhanced Mobile Radio Estimators - Phase 2 (WHERE2)

Date du début: 1 juil. 2010, Date de fin: 31 oct. 2013,

The availability of position information plays an increasing role in wireless communications networks already today and will be an integral part of future systems. They inherently can offer the ability for stand-alone positioning especially in situations where conventional satellite based positioning systems such as GPS fail (e.g., indoor). In this framework, positioning information is an importan ...
Voir le projet

 17

 TERMINÉ 

MultimEDia transport for mobIlE Video AppLications (MEDIEVAL)

Date du début: 1 juil. 2010, Date de fin: 31 juil. 2013,

Video is a major challenge for the future Internet. This traffic type is foreseen to account for close to 90 percent of consumer traffic already by 2012. However, the current Internet, and in particular the mobile Internet, was not designed with video requirements in mind and, as a consequence, its architecture is very inefficient when handling video traffic. It is the vision of this consortium th ...
Voir le projet

 11

 TERMINÉ 

Service-oriented Operating Systems (S(o)OS)

Date du début: 1 févr. 2010, Date de fin: 30 avr. 2013,

Processor and network architectures are making rapid progress with more and more cores being integrated into single processors and more and more machines getting connected with increasing bandwidth. Processors become heterogeneous and reconfigurable, thus allowing for dynamic adaptation to specialised needs. In future, thousands of billions of devices may be connected to form a single computing un ...
Voir le projet

 6

 TERMINÉ 
The increasing reliance on imported diesel fuels, in addition to annual increases in the quantities of organic wastes are threats to the EU and Latin America. This project (DIBANET) will combat these threats and help to eliminate diesel imports by developing novel technologies that will allow the sustainable production of diesel miscible biofuels from wastes. It will build on the key, complementar ...
Voir le projet

 14

 TERMINÉ 

Cooperating Objects NETwork of excellence (CONET)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2012,

A number of different system concepts have gained a lot of relevance in the area of embedded systems over the past couple of years: Embedded systems, pervasive computing and wireless sensor networks. These three types of quite diverse systems share a lot of commonalities but also have some complementary aspects in common that make a combination into a coherent system vision promising.The term "Coo ...
Voir le projet

 18

 TERMINÉ 
"Among metal machining processes, grinding is one of the most inefficient applications. But their finishing capabilities are not attainable by other methods. The main characteristic of grinding processes is the extremely high temperature in the contact zone, which makes necessary to use a cooling system to ensure a proper heat evacuation and to avoid piece damages. Cooling systems are based on app ...
Voir le projet

 12

 TERMINÉ 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimi ...
Voir le projet

 25

 TERMINÉ 

Anticipating the Network of the Future - From Theory to Design (Euro-NF)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Voir le projet

 37

 TERMINÉ 
EURO-FOS aims at creating a powerful pan-European network on photonic subsystems by clustering top European systems groups with proven track record in the design, development and evaluation of photonic subsystems. EURO-FOS aims at bridging the gap between research on device-level physics and new architectures from the network-level. The first objective of the project is the integration of research ...
Voir le projet

 18

 TERMINÉ 
This project has the objective to develop and validate a design methodology & criteria for dealing with two-phase liquid/liquid-reactions leading to a new generation of flexible and high-performance process equipment (micro through to meso structured) for continuous manufacturing. This generic approach will be developed by the project members and will involve practical, theoretical and modelling ...
Voir le projet

 10

 TERMINÉ 

ArtistDesign – Design for Embedded Systems (ArtistDesign)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2012,

The ArtistDesign NoE is the visible result of the ongoing integration of a community, that emerged through the Artist FP5 Accompanying Measure and that was organised through the Artist2 FP6 NoE.The central objective for ArtistDesign is to build on existing structures and links forged in Artist2, to become a virtual Center of Excellence in Embedded Systems Design. This will be mainly achieved throu ...
Voir le projet

 38

 TERMINÉ 

Advanced Infrastructure for Knowledge Based Services for Buildings Restoring (H-KNOW)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

"Increasing number of complex works in buildings restoration/maintenance urgently requests an advanced and systematic access to the relevant knowledge. A highly promising approach to enable such an access and to foster advancing of construction industry SMEs toward the knowledge organisations are innovative forms of collaborative knowledge&business networks of SMEs and RTD partners. The innovative ...
Voir le projet

 15

 TERMINÉ 

SOS - Science on Screen (ScienceOnScreen)

Date du début: 1 mai 2011, Date de fin: 30 nov. 2011,

Everyday we are flooded with scientific terms: in the media, at the supermarket, at the pub with our friends. But who makes this science? And how is it done? How is a scientists’ everyday life? Who better to set things straight than scientists themselves?Using amusing but accurate real life stories, this proposal aims for the production of a television show, to be broadcast on the 23rd of Septembe ...
Voir le projet

 5

 TERMINÉ 

Computer-Aided Semantic Annotation of Multimedia (CASAM)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2011,

Description Annotation of multimedia by employing human-machine synergy that optimizes user effort The need for annotated multimedia content is more pressing than ever before. The fully automated annotation has made recently large progress but faces limitations and unsolved issues. Thus, the machi ...
Voir le projet

 8

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 
For any IMS (IP Multimedia Subsystem) or pre-IMS combined network, the key enabling function for seamless mobility and service continuity among a variety of mobile/wireless access technologies supporting IP connectivity is the handover. HURRICANE focuses on the key RTD challenge to investigate, design, implement, validate and propose for standardisation, inter-system handover operations among vari ...
Voir le projet

 8

 TERMINÉ 
Continuing the SettingTheStage project organized in 2009, scientists will be called again on stage to celebrate the Researchers’ Night 2010 not only through performing arts (incl. theatre) but also through sports. These media will allow scientists to express themselves, their visions and their work. SettingTheStage II brings back together entities from four major cities across Portugal (North, Cen ...
Voir le projet

 9

 TERMINÉ 
Current two big trends in wireless communications are the development of new broadband component and the integration of heterogeneous wireless networks, to achieve the vision f the so-called 4G network.The FUTON project addresses both issues by proposing the development of a hybrid fiber-radio infrastructure transparently connecting remote antenna units to a central unit where a joint processing c ...
Voir le projet

 17

 TERMINÉ 

Context Casting (C-CAST)

Date du début: 1 mars 2008, Date de fin: 31 juil. 2010,

Project Context Casting (C-Cast) main objective is to evolve mobile multimedia multicasting to exploit the increasing integration of mobile devices with our everyday physical world and environment. The key motivation for this project and why we believe Europe needs a project on Context Casting is because multicasting is the key enabler that will make mobile context aware services commercially attr ...
Voir le projet

 13

 TERMINÉ 

Secure Widespread Identities for Federated Telecommunications (SWIFT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Identity Management is considered key to private, legal and business transactions as in the European eIDM2010. IdM frameworks are however currently confined to the web services domain. SWIFT goes beyond this by including user centricity and network operators as additional interdependent domains with IdM at the core.This new view of user centricity provides a novel perspective: Identity as central ...
Voir le projet

 10

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39

 TERMINÉ 
The low enrolment of older workers in Lifelong Learning in Europe represents a waste of individual opportunitiespotential and a loss productive and economic potential. Commission recognize “that a change is needed in the wayeducation and training is provided (flexible timetables, recognition of prior learning and more attractive training)”.Trainers, teachers and Guidance counsellors must have the ...
Voir le projet

 1