Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Voir le projet

 72

 TERMINÉ 
Many HIV vaccine concepts and several efficacy trials have been conducted in the prophylactic and therapeutic fields with limited success. There is an urgent need to develop better vaccines and tools predictive of immunogenicity and of correlates of protection at early stage of vaccine development to mitigate the risks of failure. To address these complex and challenging scientific issues, the Eur ...
Voir le projet

 43

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Voir le projet

 19

 TERMINÉ 

Optimization Driven Architectural Design of Structures (OptArch)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2020,

"According to UNEP, the building sector is estimated to be worth 10% of the global GDP and employs 111 million people. In addition, buildings use about 40% of global energy, 40% of global resources and emit approximately 33% of global GHG emissions. Finally, the fact that people today spend, on average, more than 80% of their time indoors, enhances its social importance. All above indicate the nec ...
Voir le projet

 12

 TERMINÉ 

European Joint Doctorate in Functional Materials Research (EJD-FunMat)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

EJD-FunMat is a European Joint Doctoral programme in the field of functional materials research. EJD-FunMat is embedded in an existing research network, with previous experience in co-tutelle doctorates, but the project will add new major elements, with the strategic aim of becoming a permanent reference European Joint Doctoral School in Materials Science and beyond.The key innovative aspects of t ...
Voir le projet

 9

 TERMINÉ 
REMINDER aims to develop an embedded DRAM solution optimized for ultra-low-power consumption and variability immunity, specifically focused on Internet of Things cut-edge devices. The objectives of REMINDER are :i) Investigation (concept, design, characterization, simulation, modelling), selection and optimization of a Floating-Body memory bit cell in terms of low power and low voltage, high relia ...
Voir le projet

 9

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

Enhanced European Coordination for Accelerator Research & Development (EUCARD-2)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Voir le projet

 40

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Scalable ProactivE Event-Driven Decision making (SPEEDD)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

SPEEDD (Scalable ProactivE Event-Driven Decision making) will develop a system for proactive event-based decision-making: decisions will be triggered by forecasting events -whether they correspond to problems or opportunities- instead of reacting to them once they happen. The decisions and actions will be real-time, in the sense that they will be taken under tight time constraints, and require on- ...
Voir le projet

 10

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 

Future INternEt Smart Utility ServiCEs (Finesce)

Date du début: 1 mars 2013, Date de fin: 30 sept. 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Voir le projet

 34

 TERMINÉ 

VISION ADVANCED INFRASTRUCTURE FOR RESEARCH (VISIONAIR)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

VISIONAIR is a project of creation of a European infrastructure that should be a unique, visible and attractive entry towards high level visualisation facilities. These facilities must be open to the access of a wide set of research communities. By integrating existing facilities, it will create a world-class research infrastructure enabling to conduct frontier research. This integration will prov ...
Voir le projet

 27

 TERMINÉ 

Pan-European Gas-AeroSol-climate interaction Study (PEGASOS)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The Pan-European Gas-AeroSOls-climate interaction Study (PEGASOS) European large scale integrating project brings together most of the leading European research groups, with state-of the-art observational and modeling facilities to:(1) Quantify the magnitude of regional to global feedbacks between atmospheric chemistry and a changing climate and to reduce the corresponding uncertainty of the major ...
Voir le projet

 27

 TERMINÉ 

Knowledge Transfer joint forces for efficient innovation policies (KTForce)

Date du début: 31 déc. 2011, Date de fin: 29 juin 2014,

The idea to submit a project to INTERREG IVC emerged in 2008 when several European entities decided to make a joint effort to contribute to a more collaborative and aligned environment capable of harmonizing Knowledge Transfer (KT) mechanisms and boosting innovation at European level. In fact, KT was recognized by the EU as a key tool for boosting innovation and competitiveness in Europe. In line ...
Voir le projet

 12

 TERMINÉ 

interactIVe

Date du début: 1 janv. 2010, Date de fin: 30 nov. 2013,

The interactIVe project addresses the development and evaluation of next-generation safety systems for Intelligent Vehicles, based on active intervention. Safety technologies have shown outstanding capabilities for supporting the driver in hazardous situations. Despite their effectiveness, currently available systems are typically implemented as independent functions. This results in multiple expe ...
Voir le projet

 32

 TERMINÉ 

European Coordination for Accelerator Research and Development (EuCARD)

Date du début: 1 avr. 2009, Date de fin: 31 juil. 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Voir le projet

 39

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 

Pattern Analysis, Statistical Modelling and Computational Learning 2 (PASCAL2)

Date du début: 1 mars 2008, Date de fin: 28 févr. 2013,

Description Creating new technologies in the area of Machine Learning through networking and technology transfer PASCAL2 builds on the PASCAL Network of Excellence that has created a distributed institute pioneering principled methods of pattern analysis, statistical modelling, and computational l ...
Voir le projet

 29

 TERMINÉ 
With the expected Climate Change (CC), the ecological conditions for forests in the Alpine Space will be fundamentally changing – with unknown effects on the forests essential protective, ecological, economical and social functions. Under different climate and land-use change scenarios only an adaptive management can provide the conservation of the natural heritage and the multiple functions. MANF ...
Voir le projet

 15

 TERMINÉ 

SHARE - Sustainable Hydropower in Alpine Rivers Ecosystems (SHARE)

Date du début: 31 juil. 2009, Date de fin: 30 juil. 2012,

Hydropower is the most important renewable resource for electricity production in alpine areas: it has advantages for the global CO2 balance but creates serious environmental impacts. RES-e Directives require a renewable electricity enhance but, at the same time, the Water Framework Directive obliges member States to reach or maintain a water bodies "good" ecological status, intrinsically limiting ...
Voir le projet

 13

 TERMINÉ 
ChinaAccess4EU aims at increasing the awareness and dissemination in the Member States and Associated Countries of access opportunities for European researchers and research organisations in Chinese national research and/or innovation programmes. The overriding purpose of the proposed project is to help develop the reciprocity aspect of the EU-China Science and Technology agreement by identifying ...
Voir le projet

 12

 TERMINÉ 
Inflammation is a complex biochemical and cellular response essential for the viability of higher organisms because of its requirement in anti-microbial defence and protection from the consequences of tissue injury. However, uncontrolled or sustained inflammation leads to several diseases with a huge social impact, ranging from autoimmune diseases to septic shock and cancer. While the requirement ...
Voir le projet

 11

 TERMINÉ 

ArtistDesign – Design for Embedded Systems (ArtistDesign)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2012,

The ArtistDesign NoE is the visible result of the ongoing integration of a community, that emerged through the Artist FP5 Accompanying Measure and that was organised through the Artist2 FP6 NoE.The central objective for ArtistDesign is to build on existing structures and links forged in Artist2, to become a virtual Center of Excellence in Embedded Systems Design. This will be mainly achieved throu ...
Voir le projet

 38

 TERMINÉ 

Materials for Robust Gallium Nitride (MORGaN)

Date du début: 1 nov. 2008, Date de fin: 31 oct. 2011,

The MORGaN project addresses the need for a new materials for electronic devices and sensors that operate in extreme conditions, especially high temperature, high electric field and highly corrosive environment. It will take advantage of the excellent physical properties of diamond and gallium nitride heterostructures. The association of the two materials will give rise to the best materials and d ...
Voir le projet

 24

 TERMINÉ 
At present, the Alpine Space is characterised by strong territorial discrepancies with regard to (conventional) energy supply. Rich endogenous renewable energy sources (RES) like hydropower, solar and wind energy, wood and other biomass exist throughout the Alpine Space, but equal access to their use is even more restricted because the need to balance electricity production and use requires a stro ...
Voir le projet

 12

 TERMINÉ 

maNET - Permafrost long-term monitoring network (PermaNET)

Date du début: 30 juin 2008, Date de fin: 13 juil. 2011,

Permafrost is highly sensitive to climatic changes. Permafrost degradation and related natural hazards affect traffic routes, tourism areas, settlements and infrastructures. The main problem is a lacking strategy for the consideration of these newly observed specific impacts of climate change in risk prevention and territorial development. With the joint development of a common strategy for dealin ...
Voir le projet

 14

 TERMINÉ 
With large shares of Distributed Energy Resources (DER) and Renewable Energy Sources (RES) that can be expected in the 2010 time frame as a consequence of reaching EU policy targets, at least in certain parts of Electric Power Systems of the EU and its Member States challenges with regard to controllability and optimal integration will have to be met. The INTEGRAL project aims to build and demonst ...
Voir le projet

 9

 TERMINÉ 

Generic Embedded System Platform (GENESYS)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Voir le projet

 25

 TERMINÉ 
COMBEST will provide a formal framework for component based design of complex embedded systems. This framework will:1.\tEnable formal integration of heterogeneous components, such as with different models of communication or execution;2.\tProvide complete encapsulation of components both for functional and extra-functional properties and develop foundations and methods ensuring composability of co ...
Voir le projet

 15

 TERMINÉ 
In past years persons with disabilities have experienced improvements in many areas of their lives (e.g. access to public services, inclusion into mainstream education, social attitudes of mainstream society). However, the area inclusive physical activities for people with disabilities, called ADAPTED PHYSICAL ACTIVITIES (APA), has stayed on boundaries of inclusive approaches. The quality and avai ...
Voir le projet

 11

 TERMINÉ 
Designing modern products and systems in an innovative, sustainable and competitive way demands the implementation of new paradigms in development organisations. Design is no longer concentrated on a specific phase. It goes beyond aesthetics to cover all functional aspects of a product or a system, thus driving the entire development process. Consequently, more and more actors of the complet ...
Voir le projet

 5

 TERMINÉ 
The main goal of the project was to develop innovative training curriculum for vocational education in the field of new mobile technologies. The project facilitated the process of development and transfer of innovative practices and trainings in this field in Europe.Assuring better access to the vocational training was realised by transfer of training methodology from training centres existing in ...
Voir le projet

 5

 TERMINÉ 
In this age of rapid pace of innovations and technological changes, the success oforganisations depends to a large extent on the continued learning and improvement ofits processes. Structured methods for innovation are needed. In 2003 - 2006 theinnovation manager profession has been developed by a Leonardo project (productinnovation, process innovation, market innovation) with guidance, courses, a ...
Voir le projet

 21

 TERMINÉ 
This project answers to the need of development of a complete master degree program at the point of intersection between informationtechnology and communications. The innovative performance-centred approach has been developed, tested and implemented and ourpartnership experience returned strong positive results - it has been proven to be more effective than the traditional lecture-practice-test(ex ...
Voir le projet

 7

 TERMINÉ 
TREE-diss aims at disseminating the outcomes of the TREE Thematic Network (2004-2007). The very heart of dissemination will be constituted by four regional conferences, open to the large public of European Higher Education Professionals, students and stakeholders. During each one of these events a general part will be devoted to the presentation of TREE as whole and specialised parts will be targe ...
Voir le projet

 31

 TERMINÉ 
This TN project brings together within a single network all actors in HE in chemistry and chemical engineering in Europe. There are schools, universities, industries, national chemical societies, and accreditation bodies. The project brings all these actors together to collaborate in the development of a knowledge based economy, specifically in chemistry and chemical engineering. The project:- wil ...
Voir le projet

 118

 TERMINÉ 
The NewJob project is intended to support the development of sectoral qualifications system and frameworks by definition of qualifications of engineers and technicians in nanotechnologies in terms of learning outcomes to promote transparency and recognition of vocational education and training (VET) . The project brings together VET providers, higher education (HE) institutions, SMEs, professional ...
Voir le projet

 10

 TERMINÉ 
The Partnership is composed of 10 European Universities representing 9 European states and 10 Asian Universities settled in 9 Asian countries: all partners have been carefully selected in order to ensure both a fair geographical balance and academic excellence proved by the position covered in national and international ranking by the represented Universities. The main objective of AREAS (Academi ...
Voir le projet

 20