Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

European clinical study for the application of regenerative heart valves (ESPOIR)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2016,

Acquired and congenital heart disease can necessitate heart valve replacement. However, current heart valve substitutes are not considered ideal as they need anticoagulation, bearing the risk of bleeding when manufactured from non-organic material, or they degenerate when they derive from animals or human tissue donators (homografts) thereby leading to frequent reoperation especially in the young ...
Voir le projet

 15

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 
The number of sensors and the amount of data gathered on the factory floor constantly increases. This opens the vision of truly connected production processes where information is exchanged seamlessly and in real time between humans, machines and the produced goods.However, it is a long way before the huge amount of information gathered and generated in separate disconnected sub-systems is present ...
Voir le projet

 13

 TERMINÉ 
Current digital manufacturing ICT platforms have provided a series of tools, including CAx, PDM and PLM systems, to support engineers in a series of collaborative activities, allowing them to communicate as well as to design and validate the manufacturing processes.However, they still have a long way to go for effectively addressing engineering knowledge management issues:- Today's ERP systems are ...
Voir le projet

 14

 TERMINÉ 
Security and quality of life in industrialized countries depend on continuous and coordinate performance of a set of infrastructures (energy systems, ICT systems, transportation etc) which can be therefore defined “critical infrastructures” (CI).“STRUCTURES - Strategies for The impRovement of critical infrastrUCTUre Resilience to Electromagnetic attackS” aims at analyzing possible effects of elect ...
Voir le projet

 13

 TERMINÉ 
Musculoskeletal diseases (MSD) and related disorders are often considered as an inevitable consequence of aging and they account for the largest fraction of temporary and permanent disability. It is the leading cause of disability in the EU and accounts for more than half of all chronic conditions in people over 50 years of age in developed countries. The burden of MSD and related disorders presen ...
Voir le projet

 7

 TERMINÉ 

Marine Renewables Infrastructure Network for Emerging Energy Technologies (MARINET)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2015,

Offshore Renewable Conversion systems are mostly at the pre-commercial stage of development. They comprise wave energy and tidal stream converters as well as offshore wind turbines for electrical generation. These devices require research to be undertaken at a series of scales along the path to commercialization. Each technology type is currently at a different stage of development but each one al ...
Voir le projet

 29

 TERMINÉ 

From data sharing and integration via VPH models to personalised medicine (p-medicine)

Date du début: 1 févr. 2011, Date de fin: 31 juil. 2015,

Medicine is undergoing a revolution that is transforming the nature of healthcare from reactive to preventive. The changes are catalyzed by a new systems approach to disease which focuses on integrated diagnosis, treatment and prevention of disease in individuals. This will replace our current mode of medicine over the coming years with a personalized predictive treatment . While the goal is clea ...
Voir le projet

 19

 TERMINÉ 

Product Remanufacturing Service System (PREMANUS)

Date du début: 1 sept. 2011, Date de fin: 30 juin 2015,

For centuries mankind has attempted to exploit the resources available to it through the reuse of objects and artifacts. However, as wealth of modern man has grown, the financial necessity to utilize the lifetime of these objects has dramatically declined, especially in developed countries with high focus on manufacturing. The demand for new products also placed undue pressure on the world's res ...
Voir le projet

 13

 TERMINÉ 
The ebbits project aims to develop architecture, technologies and processes, which allow businesses to semantically integrate the Internet of Things into mainstream enterprise systems and support interoperable real-world, on-line end-to-end business applications. It will provide semantic resolution to the IoT and hence present a bridge between enterprise applications, people, services and the phys ...
Voir le projet

 9

 TERMINÉ 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Voir le projet

 44

 TERMINÉ 

Collaborative Manufacturing Network for Competitive Advantage (COMVANTAGE)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

With ComVantage we envision an interorganisational collaboration space turning today's organisation-centric manufacturing approach into a product-centric one. Manufacturers will benefit from a flexible, efficient platform that helps them to operate as one virtual factory and thus gain competitive advantages in their markets. Based on best practises of Web 2.0 technologies the collaboration space w ...
Voir le projet

 13

 TERMINÉ 

Secure and Trustworthy Composite Services (ANIKETOS)

Date du début: 1 août 2010, Date de fin: 31 mai 2014,

The Future Internet will provide an environment in which a diverse range of services are offered by a diverse range of suppliers, and users are likely to unknowingly invoke underlying services in a dynamic and ad hoc manner. Moving from today's static services, we will see service consumers that transparently mix and match service components depending on service availability, quality, price and se ...
Voir le projet

 21

 TERMINÉ 

Secure Provision and Consumption in the Internet of Services (SPaCIoS)

Date du début: 1 oct. 2010, Date de fin: 31 janv. 2014,

The vision of the Internet of Services (IoS) entails a major paradigm shift in the way ICT systems and applications are designed, implemented, deployed and consumed: they are no longer the result of programming components in the traditional meaning but are built by composing services that are distributed over the network and aggregated and consumed at run-time in a demand-driven, flexible way. In ...
Voir le projet

 11

 TERMINÉ 
Description Understanding, Preserving and Predicting the Value of Online Communities.Online communities generate major economic value and form pivotal parts of corporate expertise management, marketing, product support, CRM, product innovation and advertising. Communities can exceed millions of users and infrastructures must support hundr ...
Voir le projet

 10

 TERMINÉ 

A Highly Scalable Transactional Multi-Tier Platform as a Service (CumuloNimbo)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The next generation of Platforms as a Service (PaaS) for cloud providers demand consistency, availability, and simpler programming abstractions, such as transactional consistency. Obtaining these three properties simultaneously is, however, a significant challenge. In CumuloNimbo, we propose to achieve this goal by building a stackable and modular execution platform that can be installed as a serv ...
Voir le projet

 7

 TERMINÉ 

INDENICA - Engineering Virtual Domain-Specific Service Platforms (INDENICA)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

Service-oriented computing has attracted significant attention over recent years. While this innovative approach provides enormous potential for software development in an open, networked environment, the very different constraints and quality concerns in different domains have so far led to a heterogeneous landscape of service platforms.While a single integrated platform would be highly desirable ...
Voir le projet

 9

 TERMINÉ 

Advanced Security Service cERTificate for SOA (ASSERT4SOA)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The term "certification" has several different meanings in ICT. Software practitioners can earn a certificate for expertise in a certain hardware or software technology. The maturity of crucial IT processes, such as software development, can be and is often certified. Even individual software systems can be certified as having particular non-functional properties, including safety, security or pri ...
Voir le projet

 7

 TERMINÉ 

Trustworthy Wireless Industrial Sensor neTworks (TWISNet)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

Over the past years, the deployment of sensor networks into industrial environments attracted a lot of several business domains. Therefore, an increasing number of applications are developed in several business domains, ranging from defence, public security, energy management and traffic control to health care. Sensor networks are particularly interesting due to their ability to control and monito ...
Voir le projet

 7

 TERMINÉ 

Combining and Uniting Business Intelligence and Semantic Technologies (CUBIST)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

Description CUBIST - Your Business IntelligenceThe constantly growing amounts of data and an emerging trend of incorporating unstructured data into analytics is bringing new challenges to Business Intelligence (BI). Contemporary BI solutions fall short in the following aspects: Firstly, they focus only on structured data and disregard the ...
Voir le projet

 8

 TERMINÉ 
Description To investigate a statistical-runtime-feedback-driven optimisation that will improve performance of multicore interconnected processors with applications in medical imaging and biometric recognitionWhereas in the 1990s the speed of computer hardware doubled every 18 months while the software technologies remained largely stable ...
Voir le projet

 10

 TERMINÉ 

Building the PaaS Cloud of the Future (4CaaST)

Date du début: 1 juin 2010, Date de fin: 31 août 2013,

To survive in today's economy; short time-to-market and efficiency are paramount for the creation of innovative products and to survive in the current economic climate. This is especially true for IT services which will dominate the way people work and live in the future.Cloud computing is essentially changing the way services are built, provided and consumed. Despite simple access to Clouds, buil ...
Voir le projet

 18

 TERMINÉ 
The convergence of Telecom, IT and content services drives new emerging service markets based on an open Internet of Services. Mashups have gained big success in the so-called Web 2.0. The success of the Web 2.0 services has encouraged Telcos to expose their assets as Telco services in order to provide third parties with facilities to build their business. Moreover, the exposure of network infrast ...
Voir le projet

 12

 TERMINÉ 
The aim of this project is to achieve an improved knowledge of the terrestrial carbon cycle in response to climate variability and extremes, to represent and apply this knowledge over Europe with predictive terrestrial carbon cycle modelling, to interpret the model predictions in terms of vulnerability of the terrestrial – in particular soil – carbon pools and give according advice to EU climate a ...
Voir le projet

 26

 TERMINÉ 
The MIRABEL project's main goal is to develop a conceptual and infrastructural approach that allows energy distribution companies to efficiently manage higher amounts of renewable energy and balance supply and demand. Currently, most renewable energy sources (RES; e.g. windmills, solar panels) pose the challenge that the production depends on external factors, such as wind speed and direction, the ...
Voir le projet

 9

 TERMINÉ 
For E.V.s, the development of an interactive electric energy ICT & Service interface between the vehicle and its electricity infrastructure is of utmost importance, next to creating effective business models.The rationale of this project is to contribute significantly to neutralize the driver's "range anxiety" and encourage the customers to embark the fully electric road transport.Therefore the ob ...
Voir le projet

 12

 TERMINÉ 

VIPER: Intelligence Push in the Enterprise Realm (SRT-15)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2013,

The main objective of VIPER is to build an open, scalable and dependable service platform. The target of the VIPER platform is to enable the construction of novel large-scale distributed services on the Internet. In order to achieve this goal, VIPER will allow for dynamic composition of reusable services deployed in a mix of private and public infrastructures (creating services in such mixed infra ...
Voir le projet

 5

 TERMINÉ 
Transport and logistics is concerned with the planning and execution of the world-wide shipment of goods and people. In this highly competitive, distributed, and agile industry, novel ICT solutions for optimizing the collaboration and information exchange in cooperative business networks are highly desirable. Future Internet technologies can facilitate radical improvements in business efficiency i ...
Voir le projet

 11

 TERMINÉ 
EFFECTS+ provides a coordination service for R&D for Trust, Security, Privacy and Compliance (TSPC) in the Information Society and the Future Internet (FI). It has three parallel, related goals: (1) coordination of project contribution to the development of Future Internet; (2) coordination of project activities through Project Clustering; (3) coordination and integration of the results and findin ...
Voir le projet

 5

 TERMINÉ 

Multilingual Ontologies for Networked Knowledge (MONNET)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

The Monnet project will provide a semantics-based solution for integrated information access across language barriers, which is of growing importance to industry as exemplified by the Monnet use cases. A key solution to this problem is to deal with information at the semantic level, i.e. by abstracting away over language and form, allowing for more advanced and uniform: i) integration, ii) aggrega ...
Voir le projet

 7

 TERMINÉ 
ICT 4 E2B Forum is aimed at bringing together all relevant stakeholders involved in ICT systems and solutions for Energy Efficiency in Buildings, at identifying and reviewing the needs in terms of research and systems integration as well as at accelerating implementation and take-up.ICT 4 E2B Forum intends to promote, through community building activities, a better understanding, a closer dialogue ...
Voir le projet

 7

 TERMINÉ 

Cooperating Objects NETwork of excellence (CONET)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2012,

A number of different system concepts have gained a lot of relevance in the area of embedded systems over the past couple of years: Embedded systems, pervasive computing and wireless sensor networks. These three types of quite diverse systems share a lot of commonalities but also have some complementary aspects in common that make a combination into a coherent system vision promising.The term "Coo ...
Voir le projet

 18

 TERMINÉ 
The project "Solution engineering and Services for Measuring, Monitoring, and Management of Organizations' Environmental Performance Indicators" (OEPI) is about the design and development of a software solution resulting in a Single Space of accessible Environmental Performance Indicators (EPIs) that are grounded in a semantic standardization concept. The standard for EPIs and the suite of tools c ...
Voir le projet

 9

 TERMINÉ 

Advanced Pilots of Living Labs Operating in Networks (APOLLON)

Date du début: 1 nov. 2009, Date de fin: 31 mai 2012,

The APOLLON project proposal addresses the call of the European Commission to pilot and share best practices in cross-border Living labs networks. The core focus of Living Labs is to improve the R&D process by early participation and clustering of end users and business stakeholders, including SMEs. APOLLON will demonstrate the positive impacts of collaborative cross-border Living Lab networking b ...
Voir le projet

 29

 TERMINÉ 
Description Network of Excellence STELLAR is developing new agenda for Technology Enhanced Learning research and stimulates knowledge exchange between the key European research teams.STELLAR represents the effort of the leading institutions and projects in European TEL to unify our diverse TEL community. This Network of Excellence is moti ...
Voir le projet

 18

 TERMINÉ 

Continuous Social Learning in Knowledge Networks (MATURE)

Date du début: 1 avr. 2008, Date de fin: 31 mai 2012,

Description MATURE is investigating knowledge-maturing in organisations. The project is developing individual-level tools for deepening knowledge and organisation-level tools for analysing its effects.The agility of organisations has become the critical success factor for competitiveness and requires that companies and their employees tog ...
Voir le projet

 12

 TERMINÉ 
Description The overall aim of the DEPLOY Integrated Project is to make major advances in engineering methods for dependable systems by deploying formal engineering methods.The overall aim of the DEPLOY Project is to make major advances in engineering methods for dependable systems through the deployment of formal engineering methods. For ...
Voir le projet

 14

 TERMINÉ 

Performance Control in Wireless Sensor Networks (GINSENG)

Date du début: 1 sept. 2008, Date de fin: 29 févr. 2012,

Research on wireless sensor networks (WSNs) is at an early stage and, to date, practical experience with deployment has been very limited. The focus of past research has been on fundamental design issues, especially on optimizing the use of scarce energy resources in battery-powered devices. Published studies show relative comparisons between alternative approaches, but there has been a dearth of ...
Voir le projet

 10

 TERMINÉ 

Trusted Architecture for Securely Shared Services (TAS3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2011,

The TAS3 (Trusted Architecture for Securely Shared Services) proposes an Integrated Project that will develop and implement an architecture with trusted services to manage and process distributed personal information. This architecture will be dependable, robust but at the same time also cost-effective and reliable. The personal information that will be processed and managed can consist of any typ ...
Voir le projet

 20

 TERMINÉ 

Privacy and Identity Management in Europe for Life (PrimeLife)

Date du début: 1 mars 2008, Date de fin: 30 juin 2011,

Individuals in the Information Society want to protect their autonomy and retain control over personal information, irrespective of their activities. Information technologies hardly consider those requirements, thereby putting the privacy of the citizen at risk. Today, the increasingly collaborative character of the Internet enables anyone to compose service and contribute and distribute informat ...
Voir le projet

 15