Rechercher des projets européens

27 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

High density scalable optically interconnected Tb/s Board (Teraboard)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Voir le projet

 10

 TERMINÉ 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Voir le projet

 19

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
SoftFIRE+ partners are aiming at Research and Innovation actions pursuing the integration of existing experimental facilities, testbeds and laboratories into FIRE+. The project focuses on new technologies like SDN and NFV in order to create a reliable, secure, interoperable and programmable experimental network infrastructure within the FIRE+ initiative. The Consortium will federate existing exper ...
Voir le projet

 8

 TERMINÉ 

In-Network Programmability for next-generation personal cloUd service supporT (INPUT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The INPUT Project aims at designing a novel infrastructure and paradigm to support Future Internet personal cloud services in a more scalable and sustainable way and with innovative added-value capabilities. The INPUT technologies will enable next-generation cloud applications to go beyond classical service models, and even to replace physical Smart Devices, usually placed in users’ homes (e.g., s ...
Voir le projet

 9

 TERMINÉ 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.The 5G-Crosshaul project aims at developing a 5G integrated ba ...
Voir le projet

 21

 TERMINÉ 
SATORI is a 45-month project, comprising 17 partners from 13 countries, including an intergovernmental organisation, the aim of which is to improve respect of ethics principles and laws in research and innovation, and to make sure that they are adequately adapted to the evolution of technologies and societal concerns. The partners will develop an ethics assessment framework based on thorough analy ...
Voir le projet

 19

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
...seen. The thermal energy (waste heat) of the system can be applied for heating purposes as well as for cooling applying, e.g. an absorption cooling system. The system demonstration will take place at Ericsson as a real TLC site
Voir le projet

 8

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

...$) and overall device volume a factor of 60 smaller (only a few cubic centimetres). IRIS is strongly oriented toward industrialization as it is led by a major European telecom equipment manufacturer (Ericsson) and participated by a major European Silicon manufacturing company (STMicroelectronics), already committed to the industrialization of Silicon Photonics.
Voir le projet

 8

 TERMINÉ 

Virtual Registry of the (under – on – above) GrOund Infrastructures (VIRGO)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

At the moment European countries are not obliged to have a (virtual) registry of infrastructures, however public administrations, private or public enterprises and citizens feel the need of knowing how the various infrastructures are placed and managed and which are the relative responsabilities and properties as the lack of a single and common registry generates conflicts of competence between op ...
Voir le projet

 12

 TERMINÉ 
Description The Challenge:The advent of cloud applications and the proliferation of mobile devices have imposed a dramatic increase of the IP traffic. The emerging ZetaByte Era forces operators to seek a cost-efficient way of upgrading their network in order to accommodate the vast amount of data without compromising QoS and wasting bandwidt ...
Voir le projet

 7

 TERMINÉ 
ASTRON aims at the development of high-capacity, energy-efficient and bit-rate flexible optical transceivers capable of supporting rates from 10Gb/s to beyond 1Tb/s. The ASTRON concept is based on developing multi-functional and agile devices so as to achieve Terabit capacities on a single photonic integrated chip. ASTRON's transceiver can realize different techniques of flexible super-channel ge ...
Voir le projet

 14

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Managing Risk and Costs in Open Source Software Adoption (RISCOSS)

Date du début: 1 nov. 2012, Date de fin: 31 déc. 2015,

MOTIVATION: By 2013 an estimated 85% of all commercial software packages will include OSSPROBLEM: Failure rates in OSS projects are reported to be higher than 50%. In 2011, inadequate risk management was identified among the top 5 mistakes to avoid when implementing OSS-based solutions. Understanding, managing and mitigating OSS adoption risks is therefore crucial to avoid potentially significant ...
Voir le projet

 4

 TERMINÉ 
FC and H2 may represent an enabling technology for a wider diffusion of Radio Base Station “energized” by renewable energy sources. While the expected higher energy efficiency already has an attractive potential for these applications, the energy storage potential of H2 (either locally produced or stored in bottles) is even more interesting as it could extend significantly the number of hours of ...
Voir le projet

 6

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

Future INternEt Smart Utility ServiCEs (Finesce)

Date du début: 1 mars 2013, Date de fin: 30 sept. 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Voir le projet

 34

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 

low Energy COnsumption NETworks (ECONET)

Date du début: 1 oct. 2010, Date de fin: 31 déc. 2013,

Nowadays, it is widely recognised that the sole introduction of low consumption silicon elements will not be sufficient to effectively curb tomorrow's network energy requirements. Based on this assumption, the ECONET project will investigate, develop and test new capabilities for the Future Internet devices enabling the efficient management of power consumption so to strongly reduce the current en ...
Voir le projet

 15

 TERMINÉ 

SmartSantander

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Voir le projet

 24

 TERMINÉ 

Optical Access Seamless Evolution (OASE)

Date du début: 1 janv. 2010, Date de fin: 28 févr. 2013,

Consumer bandwidth is showing no signs of slowing down and operators are now forced to explore access network migration strategies that will satisfy the anticipated bandwidth demands for the next decade. However, evolving today's access networks towards NG-OA architectures will require a multi-billion euro investment. Consequently, an important strategic aspect is the need for a thorough techno-ec ...
Voir le projet

 12

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53

 TERMINÉ 

Monitoring and Measurement in the Next Generation Technologies (MOMENT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Reaching optimising control, management and flexibility of the future network infrastructures requires actions to retrieve a good understanding of network and application behaviour. In previous EU-funded FP6 projects like EVERGROW and LOBSTER, large efforts have been taken to successfully develop and deploy measurement infrastructures (e.g. ETOMIC, DIMES) to gain insight into the operational netwo ...
Voir le projet

 12