Rechercher des projets européens

27 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

...$) and overall device volume a factor of 60 smaller (only a few cubic centimetres). IRIS is strongly oriented toward industrialization as it is led by a major European telecom equipment manufacturer (Ericsson) and participated by a major European Silicon manufacturing company (STMicroelectronics), already committed to the industrialization of Silicon Photonics.
Voir le projet

 8

 TERMINÉ 
Description The Challenge:The advent of cloud applications and the proliferation of mobile devices have imposed a dramatic increase of the IP traffic. The emerging ZetaByte Era forces operators to seek a cost-efficient way of upgrading their network in order to accommodate the vast amount of data without compromising QoS and wasting bandwidt ...
Voir le projet

 7

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 
The COCONUT proposal aims at the definition, study and realization of a new fully scalable optical access network significantly extending the network dimensions in terms of bandwidth utilization, reach and number of accommodated users. The envisioned access network evolves from the almost-commercial WDM-PON architecture to the realisation of the Ultra-Dense WDM solutions, opening the way to the "w ...
Voir le projet

 8

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 
The IoT6 project aims at exploiting the potential of IPv6 and related standards (6LoWPAN, CORE, COAP, etc.) to overcome current shortcomings and fragmentation of the Internet of Things, in line with the CERP-IoT and EC recommendations.Its main challenges and objectives are to research, design and develop a highly scalable IPv6-based Service-Oriented Architecture to achieve interoperability, mobili ...
Voir le projet

 9

 TERMINÉ 
"The activity is focused on the design and development of a ""ready-to-market"" single chip GNSS mass marketreceiver for GPS, EGNOS and GALILEO signals.Based on the wide expertise of STM in building high performance, ultra low power consumption receivers for the mass market and on the large experience and involvement of the consortium partners in the different domains (mass market AGNSS leading ro ...
Voir le projet

 11

 TERMINÉ 

Networked Society (NetSoc)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2014,

The strategic objective of the Networked Society project is to define the requirements for future networks that can seamlessly support the Networked Society of 2020. This will be achieved by enabling an informed dialogue and policy debate between the terrestrial, satellite and content delivery communities and the industrial and social application sectors. This project will create new and lasting r ...
Voir le projet

 10

 TERMINÉ 

SmartSantander

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Voir le projet

 24

 TERMINÉ 

Holistic Platform Design for Smart Buildings of the Future Internet (HOBNET)

Date du début: 1 juin 2010, Date de fin: 30 juin 2013,

The main objective of HOBNET is to ease and maximize the use of FIRE platforms by multidisciplinary developers of Future Internet applications focused on automation and energy efficiency for smart/green buildings.The proposed research addresses algorithmic, networking and application development aspects of Future Internet systems of tiny embedded devices: a) an all IPv6/6LoWPAN infrastructure of b ...
Voir le projet

 7

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 

Achieving Low-Latency in Wireless Communications (LOLA)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

The focus of LOLA is on access-layer technologies targeting low-latency robust and spectrally-efficient transmission in a set of emerging application scenarios. We consider two basic types of wireless networks, namely long-range LTE-Advanced Cellular Networks and medium-range rapidly-deployable mesh networks. Research on low-latency transmission in cellular networks is focused firstly on transmiss ...
Voir le projet

 7

 TERMINÉ 

EXpAnding LTE for Devices (EXALTED)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The number of networked humans will reach saturation by the middle of the next decade, while the number of networked devices will continue to increase dramatically for some time to come. The Wireless World Research Forum (WWRF) has set out a vision of the future where 7 trillion wireless devices will be serving 7 billion people by 2017. The vast majority of wireless traffic will be between machine ...
Voir le projet

 16

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Internet of Things Initiative (IoT-i)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Voir le projet

 17

 TERMINÉ 

eMobility NetWorld

Date du début: 1 juil. 2010, Date de fin: 31 juil. 2012,

Society is becoming confident that it can address the Grand Challenges of the 21st century: It can address global warming by taking decisive action, can invent and deploy innovative transport systems to reduce traffic problems and will be able to solve the issues associated with the ageing population. Smart applications enabled by advanced communication networks will be a centrepiece of many solu ...
Voir le projet

 10

 TERMINÉ 

Quantitative Assessment of Secondary Spectrum Access (QUASAR)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The need for the radio spectrum for the rapidly growing broadband access services is evident. Abundant and fast access to spectrum has three main advantages: it fosters rapid innovation in wireless systems and services lowering entry barrier on the market; it enables affordable mobile broadband access to all; and makes new energy efficient wireless systems possible. Secondary use of already lice ...
Voir le projet

 11

 TERMINÉ 
The general objective of this Thematic Network (TN) is to foster and promote large-scale integration of domestic and distributed micro generation and improve energy efficiency through the implementation of innovative ICT solutions into local smart power grids.The TN will bring together key relevant players in the telecommunications and energy sector. They will overview and provide insight of exist ...
Voir le projet

 15

 TERMINÉ 
The EFIPSANS project aims at exposing the features in IP version six protocols that can be exploited or extended for the purposes of designing or building autonomic networks and services. What this means is, a study of the emerging research areas that target desirable user behaviours, terminal behaviours, service mobility, e-mobility, context-aware communications, self-ware, autonomic communicatio ...
Voir le projet

 19

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 

Integrating the Physical with the Digital World of the Network of the Future (SENSEI)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

In order to realise the vision of Ambient Intelligence in a future network and service environment, heterogeneous wireless sensor and actuator networks (WS&AN) have to be integrated into a common framework of global scale and made available to services and applications via universal service interfaces. SENSEI creates an open, business driven architecture that fundamentally addresses the scalabilit ...
Voir le projet

 20

 TERMINÉ 

Publish-subscribe Internet Routing Paradigm (PSIRP)

Date du début: 1 janv. 2008, Date de fin: 30 sept. 2010,

Despite its success, the Internet suffers from several shortcomings, forcing a fundamental reform of its paradigms and core technologies. A major flaw in the design of the Internet is its imbalance of powers in the favour of the sender of information. The network accepts anything that the sender wants to send and will make a best effort to deliver it to the receiver. This has led into increasing p ...
Voir le projet

 8

 TERMINÉ 

eMobility Coordination Action (eMobility CA)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Telecommunications is experiencing major change. Sector actors are searching for new strategies as globalisation, mergers, convergence and new and disruptive technologies happen. The eMobility Technology Platform was formed to address this challenge and has almost 650 members. It has a track record of success in facilitating consensus building. The strategic objective of the eMobility CA proj ...
Voir le projet

 8

 TERMINÉ 

End-to-End Efficiency (E3) (E3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Voir le projet

 23

 TERMINÉ 

Support Action for the NEM European Technology Platform (4NEM)

Date du début: 1 oct. 2007, Date de fin: 30 nov. 2009,

In 2004, the Networked and Electronic Media (NEM) industrial sector launched the NEM European Technology Platform. Three years later, the NEM community has grown to more than 500 members.In the early time of FP7, the NEM platform intends to help to the birth of the NEM industry sector, develop its influence on the European organisations, and improve its presence on the international scene.The 4NEM ...
Voir le projet

 16