Rechercher des projets européens

29 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The Triangulum project will demonstrate how a systems innovation approach based around the European Commission’s SCC Strategic Implementation Plan can drive dynamic smart city development. We will test the SIP across three lighthouse cities: Manchester, Eindhoven and Stavanger, which represent the main typologies of European cities. They will be complemented by our follower cities Prague, Leipzig ...
Voir le projet

 22

 TERMINÉ 
Development of fuel injection equipment (FIE) able to reduce pollutant emissions from liquid-fueled transportation and power generation systems is a top industrial priority in order to meet the forthcoming EU 2020 emission legislations. However, design of new FIE is currently constrained by the incomplete physical understanding of complex micro-scale processes, such as in-nozzle cavitation, primar ...
Voir le projet

 10

 TERMINÉ 

Smart Resilience Indicators for Smart Critical Infrastructures (SmartResilience)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

...nce matrix). (#4) By developing the interactive “SCI Dashboard” tool. (#5) By applying the methodology/tools in 8 case studies, integrated under one virtual, smart-city-like, European case study. The SCIs considered (in 8 European countries!) deal with energy, transportation, health, water…Results #2, #3, #4 and #5 are a breakthrough innovation.This approach will allow benchmarking the best-practi ...
Voir le projet

 21

 TERMINÉ 

Transitioning towards Urban Resilience and Sustainability (TURAS)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

The “TURaS” project aims to bring together urban communities, researchers, local authorities and SMEs to research, develop, demonstrate and disseminate transition strategies and scenarios to enable European cities and their rural interfaces to build vitally-needed resilience in the face of significant sustainability challenges. To ensure maximum impact, the TURaS project has developed an innovati ...
Voir le projet

 34

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 
The scale and complexity of the modern manufacturing systems make essential the integration of predictive simulation modelling and optimisation methodologies into routine decision making processes. To address this challenge, DREAM will offer a radically new and extensible approach to simulation application engineering, leveraging state-of-the art research on simulation and simulation based optimiz ...
Voir le projet

 9

 TERMINÉ 

Peptide-based diodes for solar cells (PEPDIODE)

Date du début: 1 août 2011, Date de fin: 31 juil. 2015,

In a solar cell that converts energy as efficient as the natural plant photosystems, electrons should travel over very short distances, through an extremely ordered structure free of traps. Guided by these principles that were worked out at WIS and CUNY, we want to synthesize many different peptides, and consecutively screen variants thereof for a putative diode function. When linked to light-harv ...
Voir le projet

 8

 TERMINÉ 
...e, Recreation, and Hospitality (CCCRH) sectors, using uniqueness of place as a binding force and overcoming barriers to regional and transnational collaboration.Innovation; Online Green City Tool PORTICO; The project stimulates urban development in historic cities by linking the knowledge economy to the experience economy, developing and testing new techniques and carrying out unconventional urban ...
Voir le projet

 8

 TERMINÉ 

VALUEADDED (VALUE+)

Date du début: 30 juin 2010, Date de fin: 29 juin 2015,

...ed which cross-sector strategies consistently sustain stakeholder engagement. A collaborative report examines how long-term management is delivered via enterprise partnerships and community capacity building projects. The results of this study will lead to wide reaching behavioural change among project partners, with implications for the management of green investments across North West Europe.
Voir le projet

 13

 TERMINÉ 

Electromobility solutions for cities and regions (ELMO`s)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

The overall goal of the proposed project is to promote more sustainable transport through the development of electromobility solutions for cities and regions (ELMOS). The projects aims at delivering concepts for a better exchange of electromobility knowledge at regional and EU level, concepts for new business models and for cross-border field tests which should lead to an improved standardisation ...
Voir le projet

 10

 TERMINÉ 
...and roads absorb temperature produced during the day, like giant heaters, and store it. The energy is then released during the night time. This often means a big difference in the temperature between city and its surrounding areas.This phenomenon is called the Urban Heat Island (UHI) and is known and studied since eighties. It is caused by various factors like physical characteristics of the surfa ...
Voir le projet

 18

 TERMINÉ 

Optimized Infrastructure Services (OPTIMIS)

Date du début: 1 juin 2010, Date de fin: 31 mai 2013,

...s accompanied by reference architectures illustrating their use in a few scenarios of broad interest. The scenarios in focus are (1) service providers utilizing cloud bursting to complement local capacity for peak loads, (2) service providers making use of multiple clouds, and (3) infrastructure providers subcontracting resources in a cloud federation. A core of the OPTIMS Toolkit is the OPTIMIS B ...
Voir le projet

 16

 TERMINÉ 

Urban Soil Management Strategy (URBAN-SMS)

Date du début: 30 sept. 2008, Date de fin: 30 mars 2013,

Central Europe is characterised by a relatively high population density. In some of the countries a quarter of the total national population lives in the capital agglomeration, in the other countries urban networks of larger towns exist. These urban areas have a high economic potential, but they are facing a concentration of environmental, social and economic problems often triggered by increasing ...
Voir le projet

 11

 TERMINÉ 

Making Knowledge Work (MKW)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

The Making Knowledge Work (MKW) consortium consists of 12 ambitious regions wishing to improve their regional innovation capacity. They all observe that excellent research does not always find its way into commercially valuable innovations and excellent ideas are often not used. Policy action is needed to bridge the gap in the innovation chain. It asks for projects on micro level and meso level st ...
Voir le projet

 15

 TERMINÉ 

ducer Services for European Sustainability and Competitiveness (PROSESC)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...gion of Stuttgart with more than 50 sound designers experimenting on future sound of mobility. The results were presented at the Elektromobiler Jahresauftakt of the Region and gained a lot of publicity -the Prime Minister of the State Baden-Wurttemberg, for example, awarded the winner.In March 2012 the project carried out it's conference and study visit in Turin and attracted more than 80 particip ...
Voir le projet

 8

 TERMINÉ 

Valuing Attractive Landscapes in the Urban Economy (VALUE)

Date du début: 30 juin 2008, Date de fin: 29 sept. 2012,

AIM: To demonstrate the economic value of green infrastructure at the city/region scale and to show how to target green investments to maximise competitive benefits to communities throughout NWE. Green infrastructure* is a valuable part of our urban economy. However. as urbanisation increases throughout NWE. public and private greenspaces are being lost to housing and commercial developments. A ...
Voir le projet

 9

 TERMINÉ 
The aim of the Project is “to foster the innovation capacity of Creative Industries (CI) in order to access new markets”. The creative sector is the most dynamic sector in the economy. It is a key driver of economic and social development and leads to innovation in various other industries and sectors. Turning creative ideas into businesses is the key aim of the project. It will focus on the excha ...
Voir le projet

 8

 TERMINÉ 

Software Services and Systems Network (S-Cube) (S-Cube)

Date du début: 1 mars 2008, Date de fin: 29 févr. 2012,

Description S-Cube, the Software Services and Systems Network, will establish an integrated, multidisciplinary, vibrant research community that will enable Europe to lead the software-services revolution...S-Cube, the Software Services and Systems Network will establish a unified, multidisciplinary, vibrant research community which will e ...
Voir le projet

 21

 TERMINÉ 

Manager Coordinating Brownfield Redevelopment Activities (COBRA MAN)

Date du début: 30 nov. 2008, Date de fin: 30 déc. 2011,

...l process management to steer revitalisation processes. No related professional or education standards exist yet. Methodological tools, training for practitioners and study courses are needed for capacity building. There is demand on know-how-transfer, both horizontal between different national expertise and vertical from research into daily practise. Creation of training and educational schemes n ...
Voir le projet

 10

 TERMINÉ 

Focus on Key Sources of Environmental Risks (FOKS)

Date du début: 31 oct. 2008, Date de fin: 30 oct. 2011,

Protecting the environment now and for future generations is one of the pre-conditions for sustainable growth. This is especially relevant for groundwater resources, which are treated by most of EU countries as a strategic source of drinking water for future generations. One has to bear in mind that groundwater is a specific environmental medium. Its degradation sometimes occurs many years after t ...
Voir le projet

 7

 TERMINÉ 

Revitalization of Urban River Spaces (REURIS)

Date du début: 31 août 2008, Date de fin: 30 août 2011,

...e seen as a threat rather than a benefit. Thus, despite the fact that such areas are particularly important or often the only functioning or potential reservoirs of biodiversity and open space in the city, degraded or abandoned riparian areas are common in Central European cities. The essence of REURIS is to implement strategies and activities aimed at revitalisation (reconstruction of natural and ...
Voir le projet

 8

 TERMINÉ 

Managing Assurance, Security and Trust for sERvices (MASTER)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2011,

The business of the future will be characterized by highly dynamic service-oriented architectures where outsourcing and distributed management constitute the norm rather than the exception with an increasing complexity in security and trust requirements from regulations and business standards. Best-effort security will no longer be accepted and business entities will have to provide certified ass ...
Voir le projet

 15

 TERMINÉ 

Visual Analytics - Mastering the Information Age (VisMaster CA)

Date du début: 1 août 2008, Date de fin: 30 sept. 2010,

One of the most important challenges of the emerging Information Age is to effectively utilise the immense wealth of information and data acquired, computed and stored by modern information systems. On the one hand, the appropriate use of available information volumes offers large potential to realize technological progress and business success. On the other hand, there exists the severe danger th ...
Voir le projet

 28

 TERMINÉ 

Management of Groundwater at Industrially Contaminated Areas (MAGIC)

Date du début: 31 mai 2005, Date de fin: 30 mars 2008,

The MAGIC project is focussed on the clean up of complex damages in large groundwater bodies. In particular the common situation of multiple pollution sources in derelict areas requires innovative pro-cedures instead of the conventional single-case treatment. Thus key feature of MAGIC is to further develop the innovative, integral, emission-orientated management approach developed in the FP5 RTD-p ...
Voir le projet

 6

 TERMINÉ 

Network of automotive regions (Automotive regions)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

AUTOMOTIVE REGIONS aims to help different regional decision-makers work together to design policy when anticipating or facing the closure or downsizing of a car plant. This involves formulating measures to ease the social and economic effects of such an event and the development of approaches to strengthen the competitive position of the existing automotive industry. In the long term, regions shou ...
Voir le projet

 16

 TERMINÉ 

Adaptation and Mitigation – an Integrated Climate Policy Approach (AMICA)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

AMICA is looking at ways to address climate change at local and regional level. The project seeks to increase the effectiveness of climate policy and strike a balance between precautionary and responsive measures to deal with both the causes and the short and long-term consequences of this global phenomenon. ...
Voir le projet

 13

 TERMINÉ 

InterMETREX

Date du début: 31 mars 2003, Date de fin: 29 nov. 2007,

...al urban regions and areas; better integration of forecasts, projections, scenarios and sectoral plans, particularly on socio-economic issues; the polycentric development of retail centres; urban capacity studies for sustainability; the protection of traditional water and agricultural areas within the metropolitan area; the development of integrated metropolitan transport systems; the integration ...
Voir le projet

 31

 TERMINÉ 
...sses that will incorporate communities within the planning process. The investments foreseen include various types of physical, environmental and architectural regeneration activities in each partner city. These activities are structured alongside a system of Common Cooperation Issues, Transnational Project Working Groups and Area-Specific Project Working Groups. The project also hopes to generate ...
Voir le projet

 6

 TERMINÉ 
URBAN EMPATHY will consolidate a permanent structure to work on transforming existing results from preselected MED projects and key European programmes into effective policies related to Sustainable Urban Models (SUMO). - 1st (WP3), the results will be evaluated through a set of transferability criteria and cross checked to ensure that they comply with the SUMO shared by the partners. In parallel, ...
Voir le projet

 13