Rechercher des projets européens

28 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

COnvergence of fixed and Mobile BrOadband access/aggregation networks (COMBO)

Date du début: 1 janv. 2013, Date de fin: 30 sept. 2016,

Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Voir le projet

 20

 TERMINÉ 

Automatic Mapping of Fibre Orientation for Draping of Carbon Fibre Parts (FibreMap)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

This project aims at the development of an automatic quality control and feedback mechanism to improve draping of carbon fibres on complex parts. There is a strong need in the automotive industry for automatic systems that perform quality control and improve draping processes in order to allow high production volumes.The technology that is being developed in the project will include a new sensor s ...
Voir le projet

 7

 TERMINÉ 

Mobility and Transport Digital Wallet (MobiWallet)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

Fare management schemes in transport are increasingly becoming more digitized in most large cities. However, most suffer from a siloed approach, as each transport mode is owned, operated or maintained by a range of different actors. The fact that these actors often come from public, private or even mixed backgrounds adds a layer of complexity to the issue of interoperable fare management. However, ...
Voir le projet

 15

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

Rail inspection by Flexible Electromagnetic Acoustic Transducer (RIFLEX)

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

"Railway maintenance is a costly activity that can be improved by faster inspection of assets. If the speed of inspection of the railhead can be increased the potential cost savings are significant. Current NDT solutions implement hand held devices that effectively scan at walking pace. EMAT devices have been utilised to demonstrate that a non-contact solution that can be mounted to a vehicle is f ...
Voir le projet

 9

 TERMINÉ 

Small Wind Turbine for Urban Environments (WINDUR)

Date du début: 1 nov. 2013, Date de fin: 31 mai 2016,

As SMEs in the supply chain of small Wind Turbines (WTs), we have identified an excellent opportunity in the urban submarket. The Small Wind market mainly corresponds to turbines installed in rural and isolated areas. Nevertheless, Urban is by far the largest potential market, as 80% of European population lives in cities and the EU Directive 2010/31/EU on Energy Performance of Buildings requires ...
Voir le projet

 12

 TERMINÉ 

Europeana network of Ancient Greek and Latin Epigraphy (EAGLE)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

EAGLE is a Best Practice Network that brings together the most prominent European institutions and archives in the field of Classical Latin and Greek epigraphy, to provide Europeana with a comprehensive collection of unique historical sources which constitute a veritable pillar of European culture. In particular, it will supply inscriptions coming from 25 EU countries, providing more than 1.5 M of ...
Voir le projet

 19

 TERMINÉ 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Voir le projet

 28

 TERMINÉ 
PhosFarm addresses the increasing market for a sustainable and economically phosphorus (P) recovery from agricultural residues to meet growing demand for food, bio-fuels and bio-materials. Recent studies demonstrated that the EU is highly vulnerable to the foreseeable P scarcity because of its entire dependency on imported phosphate rocks for the fertilizer production. To avoid this dependency, ne ...
Voir le projet

 10

 TERMINÉ 

Interoperable Trust Assurance Infrastructure (INTER-TRUST)

Date du début: 1 nov. 2012, Date de fin: 30 avr. 2015,

The main objective of the INTER-TRUST project is to develop a framework to support trustworthy applications in heterogeneous networks and devices based on the enforcement of interoperable and changing security policies.This framework will allow developers, integrators and operators of systems to act during the development and operation phases to obtain systems with components that communicate and ...
Voir le projet

 6

 TERMINÉ 
The European rail infrastructure employs high manganese, high strength steel components at safety critical locations such as crossings. Restricted access to these assets limits the range of NDT techniques available for in-service inspection to those capable of inspection from the top surface. Conventional ultrasonic inspection of high manganese steel is ineffective due to the inherent coarse grain ...
Voir le projet

 8

 TERMINÉ 

Wireless Railway Condition Monitoring (WIRAILCOM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2014,

Railway operators rely on remote condition monitoring (RCM) of assets to enable continued safety and efficiency. It is not currently cost effective to monitor every asset; some vehicle systems, such as freight trains, use no technology and are therefore difficult to add modern electronic systems to. There are neither the power systems nor the data systems available to link a new monitoring system ...
Voir le projet

 7

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 
ENLACE aims at supporting the bi-regional dialogue between the EU and the Central America Countries (CAC) on S&T issues, identifying common interests in research areas, setting up S&T priorities, supporting capacity building activities, and enhancing the dialogue within the region.The planned activities are: policy dialogue meetings between EU and CA stakeholders to identify research priorities of ...
Voir le projet

 16

 TERMINÉ 

SmartSantander

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Voir le projet

 24

 TERMINÉ 
"FLOCK-REPROD will provide the European dairy goat industry with the innovative, economically and environmentally-viable technology necessary to enable the hormone-free production of goat’s milk and related products (e.g. cheese). It will achieve this by controlling reproduction via artificial insemination (AI) all year round. FLOCK-REPROD technology will allow the EU dairy goat industry to operat ...
Voir le projet

 17

 TERMINÉ 
"The use of embedded systems is nowadays spreading at an increasing speed, to all aspects of modern life as well as all phases of industrial production. Their use extends from everyday non-critical or soft real-time consumer electronics and telecommunications equipment, to highly critical automotive, railway, automation control and aerospace systems, which satisfy the most stringent real-time cons ...
Voir le projet

 9

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 
Offering good performance at low cost, polypropylene (PP) is a popular commodity plastic within many market sectors. However, due to its high flammability and low charring nature, PP is difficult to fire protected. Whist brominated flame retardants (FRs) are able to achieve excellent FR performance at moderate cost and with little impact on polymer properties, they release toxic and corrosive smok ...
Voir le projet

 8

 TERMINÉ 
"The availability of water resources is a key contributory factor to economic and social development, as well as being an essential pillar of environmental preservation. The most of the Mediterranean regions, with a semi-arid climate, has historically suffered from water scarcity. This has led in many cases to a strong culture in the efficient use of water and development of innovative policies an ...
Voir le projet

 12

 TERMINÉ 

Mediterranean Intermittent River Management (MIRAGE)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

"The implementation of the WFD in catchments with temporary rivers presents a significant challenge for watershed managers. The MIRAGE project will, for the first time, comprehensively investigate the applicability of specific management options under the characteristic flush and drought conditions of temporary streams. Through investigations in seven basins, MIRAGE will provide a framework for ma ...
Voir le projet

 17

 TERMINÉ 
"Powder Metallurgy (P/M) is a major manufacturing route for many industries. While the demand for P/M parts in its traditional automotive market is predicted to grow, future sector expansion depends directly upon its capability to manufacture zero-defect, complex mechanical P/M parts for industries such as aerospace and medicine. To comply with such standards, parts manufacturing must be optimized ...
Voir le projet

 10

 TERMINÉ 
Description Entity identifiers should not be multiplied beyond necessityPrepare to 'Okkamize'!OKKAM will deliver a secure and privacy aware open source infrastructure to manage entity references. Just as the WWW enables a global decentralised network of documents, connected by hyperlinks, OKKAM will provide a global digital space for publ ...
Voir le projet

 12

 TERMINÉ 

Extending Professional Active Life (ePAL)

Date du début: 1 févr. 2008, Date de fin: 30 avr. 2010,

Project ePAL aims to explore innovative ways to best facilitate the development of the active ageing process and to ensure an improved transition for the elderly citizen as they cope with the onset of age. In order to find appropriate ways towards this goal, a strategic RTD roadmap is proposed focused on innovative solutions and ensuring a balanced post-retirement life-style.The ePAL vision – addr ...
Voir le projet

 5

 TERMINÉ 

ANTS RESEARCH GROUP EVOLUTION TO A RESEARCH EXCELLENCE INSTITUTE (ANTS++)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2009,

The ANTS research group is a dynamic and very productive research group that since its creation has been growing in members, experience, intensity and results as to become it a reference research group at regional and national level. Last year, in 2007, ANTS group has been nominated and awarded as an excellence research group in the Murcia Region. Additionally University of Murcia has prepared a c ...
Voir le projet

 1

 TERMINÉ 

Recreational Reserchers (RECRESEARCHERS)

Date du début: 1 juin 2008, Date de fin: 31 déc. 2008,

The RecreSearchers proposal consist of three events on the 26th September 2008, which will gather more than 5000 people, organised by three public Universities in Spain: Barcelona (Catalonia), Girona (Catalonia) and Murcia (Murcia community). The main objective of the project is to enhance the recognition of researchers and their role in society, focusing in one of the their mission: as a communic ...
Voir le projet

 5

 TERMINÉ 
Background The FAO estimates that around of 27 million tonnes of undesired by-catch from fishing fleets are thrown back into the sea annually. This means that more than a third of the fish volume caught every year is wasted and such large amounts of organic waste thrown into the sea have severe adverse effects on the ecological equilibrium of marine commu ...
Voir le projet

 5

 TERMINÉ 
Europe is confronted with the problem of population departure and consequent abandon of rural areas due to the increase in wildfire incidence, and there is a need to to find ways to support rural development by providing adequate training on fire and disaster related management. Romania, Hungary, Estonia, Spain and UK have recorded between 2004-2007, 21500 fires which affected almost 150,000ha of ...
Voir le projet

 5