Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 

Initier Former dans un Environnement Européen

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

...t only does it develop the search for firms liable to take our students but also their integration in a different linguistic and cultural context. Besides, thanks to Mrs Della Flora, the project manager, the Paul Bert secondary school can offer its knowledge of local firms to the teachers of the Navarre Institute. M Garcia and Mr Lauga, who teach commerce, Mrs Testemale and Mrs Roquefort who teach ...
Voir le projet

 2

 TERMINÉ 
This project aims to unite global efforts to target the highly druggable class of enzymes called cyclic nucleotide phosphodiesterases (PDEs) in the fight for neglected parasitic diseases (NPD). It will establish a drug discovery platform, PDE4NPD, that combines phenotypic screening with efficient target-centric drug discovery, including target validation, various strategies for compound screening, ...
Voir le projet

 11

 TERMINÉ 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Voir le projet

 42

 TERMINÉ 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Voir le projet

 17

 TERMINÉ 

European Clinical Research Infrastructures Network - Integrating Activity (ECRIN-IA)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2017,

... board (WP7).Joint research activities are designed to improve the efficiency of ECRIN services, through the development of tools for risk-adapted monitoring (WP8), and the upgrade of the VISTA data management tool (WP9).This project will build a consistent organisation for clinical research in Europe, with ECRIN developing generic tools and providing generic services to multinational studies, and ...
Voir le projet

 48

 TERMINÉ 
...e synapses into different subcellular compartments. Promising candidates will then be tested by gain and loss of function experiments using confocal and two-photon microscopy in vivo and cell biology analyses in vitro. To confirm the functional relevance of candidate molecules, we will combine optogenetics tools with gain and loss of function approaches in slices cultures. Unraveling the mechanism ...
Voir le projet

 2

 TERMINÉ 
The scientific targets of the EUROSUNMED project are the development of new technologies in three energy field areas, namely photovoltaics (PV), concentrated solar power (CSP) and grid integration (GI), in strong collaboration with research institutes, universities and SMEs from Europe in the north side of the Mediterranean sea and from Morocco and Egypt from the south of the sea. The focus in PV ...
Voir le projet

 18

 TERMINÉ 
The vision of SelSus is to create a new paradigm for highly effective, self-healing production resources and systems to maximise their performance over longer life times through highly targeted and timely repair, renovation and up-grading. These next generation machines, fixtures and tools will embed extended sensory capabilities and smart materials combined with advanced ICT for self-diagnosis en ...
Voir le projet

 16

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

Code for European Severe Accident Management (CESAM)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Voir le projet

 21

 TERMINÉ 
... (SP2 and SP3) is led by a power company. The demo sub-projects are supported by work packages in SP1 dealing with RTD support activities and common issues. Two work packages in SP0 are dedicated to management and dissemination actions respectively. The latter work package includes contacting stakeholders outside OCTAVIUS.OCTAVIUS gathers the leading organisations within the field of CCS and clean ...
Voir le projet

 18

 TERMINÉ 

Passive and Active Systems on Severe Accident source term Mitigation (PASSAM)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

...oring potential enhancement of existing source term mitigation devices,Demonstrating the ability of innovative systems to achieve larger source term attenuation.The understanding gained from in-depth analysis of experimental results will make it possible to produce simple models and/or correlations easy to be implemented in accident analysis codes, this way enhancing code capabilities to model Sev ...
Voir le projet

 11

 TERMINÉ 

Dengue research Framework for Resisting Epidemics in Europe (DENFREE)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2016,

"WHO estimates that one of the main consequences of global warming will be an increased burden of vector-borne diseases. Among these, dengue appears to be particularly problematic, with tens of millions of cases of dengue fever estimated to occur annually, including up to 500,000 cases of the life-threatening dengue hemorrhagic fever/dengue shock syndrome. In recent years, the global burden of den ...
Voir le projet

 15

 TERMINÉ 
...social context), including both online (e.g., YouTube) and traditional media (e.g. audiovisual repositories), and for dealing with information of very different degrees of granularity. The multimodal analytics will help organize, classify and cluster cross-media streams, by enriching its associated metadata. A core idea is that the process of integrating content from different media sources is car ...
Voir le projet

 7

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

...Responsible Innovation, and a programme of transdisciplinary education, and develop a framework for collaboration that links the partners under strong scientific leadership and professional project management, providing a coherent European approach and ensuring effective alignment of regional, national and European research and programmes. The project work plan is organized in the form of thirtee ...
Voir le projet

 116

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

...oordination and Support Action and the second part a Collaborative Project. The aim of the first part, the Coordination and Support Action, is to establish an efficient, transparent and high quality management structure to carry out the planning and management of R&D including project calls, proposal evaluation, project follow-up dissemination and valorisation of R&D results in the area of safety ...
Voir le projet

 52

 TERMINÉ 
...ess, where equipment servicing and equipment knowledge are main business drivers.The proposed paradigm builds on self-aware and knowledge-based equipment that need functionalities to collect and manage information regarding their capabilities and their evolution over time, maintenance, upgrade or refurbishment operations over it lifetime; and information of use and wear. To do so, versatile and mo ...
Voir le projet

 19

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

...d makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensuring a robust and socially acceptable system of protection of man and environmen ...
Voir le projet

 26

 TERMINÉ 

Initier Former dans un Environnement Européen

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...p of the services of the Rectorat of Bordeaux and the DAREIC (Delegation Académique aux Relations Européennes Internationales et à la Cooperation), we have now succeeded and l”Insitut Maria Ana Sanz (MAS) gave us their support coupled with their knowledge of the area. They gave us access to companies who could help finding the contacts we needed to find host families in September 2014. Thus, w ...
Voir le projet

 2

 TERMINÉ 

Neuro-Enhancement: Responsible Research and Innovation (NERRI)

Date du début: 1 mars 2013, Date de fin: 31 mai 2016,

... mobilization and mutual learning (MML) activities engaging scientists, policy-makers, industry, civil society groups and the wider public. To structure this complex socio-technical domain we propose Analytic Classification of NE technologies into currently available methods, experimental and hypothetical technologies. Each of the types raises some fundamental ethical, legal, social and economic i ...
Voir le projet

 19

 TERMINÉ 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Voir le projet

 56

 TERMINÉ 

Sea For Society (SFS)

Date du début: 1 juin 2012, Date de fin: 30 nov. 2015,

Sea for Society (SFS) has brought together a multidisciplinary partnership of 21 partners from 11 countries representing marine research institutes, funding agencies, science museums and aquaria, CSO’s, NGO’s, higher education institutes, business networks, to implement a MMLAP to address Specific Challenge 3: Marine Resources, inland activities & sustainable development. SFS will mobilise researc ...
Voir le projet

 21

 TERMINÉ 
The principal aim of this ITN is to examine the history of the transatlantic slave trade and its legacies from a variety of different angles. The idea is to hire thirteen Early Stage Researchers (ESRs) and two Experienced Researchers (ERs) across Europe and a wide range of disciplines, including history, archaeology, sociology, heritage studies and genetics, to investigate various aspects of the s ...
Voir le projet

 10

 TERMINÉ 
...ill investigate how climate change alters local patterns of pollutant exposure and threshold exceedance.A network of European experiments for contrasting ecosystems and climates, combined with meta-analysis of unpublished datasets, will quantify how climate change alters ecosystem vulnerability to tropospheric O3 and N deposition, including interaction with increased CO2. Combined with special top ...
Voir le projet

 41

 TERMINÉ 

Europeana Creative

Date du début: 1 févr. 2013, Date de fin: 31 juil. 2015,

Europeana Creative will support and promote the re-use of cultural resources available via Europeana by realising a set of concrete objectives. (1) The project will establish the Europeana Labs Network of online and physical spaces for experimentation and engagement. The labs will provide access to technical and business services, and experimentation content to support the development of new proje ...
Voir le projet

 26

 TERMINÉ 

Connectivity management for eneRgy Optimised Wireless Dense networks (CROWD)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2015,

... density as a resource rather than as an impediment, iii) enabling traffic-proportional energy consumption, and iv) guaranteeing mobile user's quality of experience by designing smarter connectivity management solutions.The technology developed by the project will be designed taking into account the requirements for commercial deployment. Exploitation plans comprise a thorough roadmap for standard ...
Voir le projet

 11

 TERMINÉ 
...BM). To achieve these aims, clinical trials on meropenem use for late-onset sepsis and BM will be developed. Using previously published PK models, a sampling scheme will be designed and population PK analysis used to identify relevant PK parameters. Safety will be evaluated through analysis of haematological and biochemical parameters and monitoring adverse events. Appearance of resistant bacteria ...
Voir le projet

 12

 TERMINÉ 
... to the standardization and openness of the EV ecosystem through a System of Systems (SoS) approach establishing open interfaces between the different systems and stakeholders; and iv) establish the management interface between the EV infrastructure and the electric grid, taking benefit of this information to create a more reliable and efficient end-to-end energy system.MOBI.Europe will enable als ...
Voir le projet

 12

 TERMINÉ 

European Nuclear Science and Applications Research (ENSAR)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Voir le projet

 32

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 

Test Infrastructure and Accelerator Research Area (TIARA)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

"The main objective of TIARA (Test Infrastructure and Accelerator Research Area) is the integration of national and international accelerator R&D infrastructures into a single distributed European accelerator R&D facility. This will include the implementation of organisational structures to enable the integration of existing individual infrastructures, their efficient operation and upgrades, and t ...
Voir le projet

 11

 TERMINÉ 

Devices for Assisted Living (DALi)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

Description Robot walker for elderly people in public spacesShopping centres, airports, museums and hospitals are the kind of complex and confusing environments where elderly people on the verge of cognitive decline could have difficulties walking around without help. The walking frames they may currently use do not have the flexibility t ...
Voir le projet

 8

 TERMINÉ 
In the Atlantic arc from Iceland to Portugal, Europe has some of the best natural wave resources in the world; with the total potential European ocean wave power estimated to be in the range 150 -240 TWh per annum. The main barrier to wave energy expansion is the lack of a large, commercial-scale demonstration of the technology. In addition, the efficiency of devices is limited and needs to be imp ...
Voir le projet

 6

 TERMINÉ 

Optimal Energy Consumption and Recovery based on system network (OpEneR)

Date du début: 1 mai 2011, Date de fin: 31 juil. 2014,

... Optimal energy consumption and recovery for electric vehiclesA central goal of OpEneR is the investigation of an innovative and highly efficient overall energy manager that uses information from underlying subsystems to generate optimal driving and operation strategies. The strategies will vary from time optimised up to range maximised. An advanced and intuit ...
Voir le projet

 6

 TERMINÉ 

Monitoring Atmospheric Composition and Climate Interim Implementation (MACC II)

Date du début: 1 nov. 2011, Date de fin: 31 juil. 2014,

MACC II (Monitoring Atmospheric Composition and Climate – Interim Implementation) is designed to meet the requirements that have been expressed for prototype operational GMES services for the atmospheric domain. From late-2011 MACC II will continue the operation and development of the GMES service lines established by the MACC project and prepare for its transition in 2014 to become the atmospheri ...
Voir le projet

 39

 TERMINÉ 

New Designs of Ecological Furnaces (EDEFU)

Date du début: 1 juin 2010, Date de fin: 31 mai 2014,

The general objective of the EDEFU project consists in developing new technologies of heating, new refractory materials to improve heat insulations and new designs for innovating recovery systems for residues for industrial furnaces in Non ferrous metals, glass, ceramics and cement industries. The evaluation of the success of the project will be realised through the validation of real scale demon ...
Voir le projet

 20

 TERMINÉ 
...ify appropriate bottom-up solutions to the problems of organisational culture and physician burnout, and its impact upon patient safety and quality of care, and (4) To develop a network for hospital managers and associated stakeholders for the communication of interventions aimed improving quality of care in hospitals. The work plan of the proposed project will consists of 3 phases: The first phas ...
Voir le projet

 11

 TERMINÉ 
... to be developed. The RTD performers in collaboration with the SME associations will develop the set of OSH-related tools of the IMOSHION project. This will include (a) an OSH knowledge and learning management system, (b) a workplace simulation for experimenting and training on OSH issues, (c) an immersive training and learning tool for OSH procedures, and (d) a planning tool for OSH prevention at ...
Voir le projet

 12

 TERMINÉ 

PREPARED “ENABLING CHANGE” (PREPARED)

Date du début: 1 févr. 2010, Date de fin: 31 janv. 2014,

...e change the water supply and sanitation industry has identifed as a challenge for the years to come. The result of PREPARED will be an infrastructure for waste water, drinking water and storm water management that will not only be able better cope with new scenarios on climate change but that is also managed in a optimal way. We will have complexes monitoring and sensor systems, better integratio ...
Voir le projet

 36