Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Fly Algorithm in PET Reconstruction for Radiotherapy Treatment Planning (FLY4PET)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

... -- at the interface between medical physics, computer science, and medicine -- will require for its success an alliance with external partners in computer science (INRIA Saclay, France; Lorraine University, France; and Ghent University Belgium), medicine (University of Paris 13 / Hôpital Avicenne, France; and Wales Research and Diagnostic Positron Emission Tomography Imaging Centre (PETIC), Unite ...
Voir le projet

 1

 TERMINÉ 

Surface Modifications for advanced applications (SUMA2-Network)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

The SUMA2 Network is designed to collaborate in the field of materials surface modification for advanced applications, and is composed of 3 Universities and 1 research center in Europe (Saarland University and Fraunhofer Institut for Material and Beam technology (GER), National Politecnical Institute of Lorraine (FRA) and Linköping University (SWE)), and 5 Universities in Latinamerica (Universidad ...
Voir le projet

 4

 TERMINÉ 

Joint European Master Programme on Advanced Materials Science and Engineering

Date du début: 1 sept. 2016, Date de fin: 30 sept. 2021,

...ining module during integration week. Entrepreneurial training during Professional Summer School.• Students attend courses at two universities: 1st and 2nd semesters at entrance university, 3rd semester at seconduniversity, fourth semester (Master Thesis) at one of these two universities.• Adaptation phase in 1st semester: Module I – Structure and properties of materials; Module II - Characterisat ...
Voir le projet

 4

 TERMINÉ 

Auslandspraktika für Jugendliche in der beruflichen Erstausbildung

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

...ement assistants". They are students of the part-time Vocational School in the first and second year of their three-year courses. The overwhelming majority of the participants have either the University of Applied Sciences Entrance Qualification or even the University Entrance Qualification.Groups B:16 students of the last year (grade 12) of the Vocational College (Commercial College), speciality ...
Voir le projet

 9

 TERMINÉ 

Europäischer Master für Lexikographie / European Master in Lexicography

Date du début: 1 sept. 2015, Date de fin: 31 août 2020,

...versité de Lorraine (France), Universidade Santiago de Compostela (Spain), Károli Gáspár Református Egyetem Budapest (Hungary), Universidade do Minho (Portugal), Uniwersytet Śląski (Poland), University of Stellenbosch (South Africa), and Università degli Studi Roma Tre (Italy). In addition, EMLex counts on the collaboration of Universität Hildesheim and the Institut für Deutsche Sprache as associa ...
Voir le projet

 8

 TERMINÉ 

Auslandspraktika für Jugendliche in der beruflichen Erstausbildung

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...cturing industry“. They are students of the part-time Vocational School in the first and second year of their three-year courses. The overwhelming majority of the participants have either the University of Applied Sciences Entrance Qualification or even the University Entrance Qualification. Groups B+C: 17 students of the last year (grade 12) of the Vocational College (Commercial College), special ...
Voir le projet

 7

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

...g tradition of ERASMUS mobility in Europe. Since their merger in January 2012, Université de Lorraine has continued the global efforts in this area. To consolidate its international integration, the University has an active police to promote international incoming and outgoing mobility. Université de Lorraine also intends to build up ties with a network of European Universities which share its ma ...
Voir le projet

 1

 TERMINÉ 

Festival International du Film Nancy-Lorraine

Date du début: 2 mai 2015, Date de fin: 1 nov. 2015,

...e region, in the North East of France. We are in the hearts of Europe, one-hour from Luxembourg, Germany and Belgium. Great part of the population is made of young people as the city has an important university. For more information please visit the city's official website: www.mairie-nancy.fr In conformity with the objectives of EVS program, our project focuses on creating and developing exchang ...
Voir le projet

 3

 TERMINÉ 

European Voluntary Service ESN Nancy

Date du début: 1 sept. 2014, Date de fin: 30 juin 2015,

... foster the link between international student and the local community but also to engage international student in active citizenship beyond their study period. ESN Nancy is strongly supported by the University of Lorraine and the City of Nancy and is actively involved in the ESN network, a 448 association’s network operating in 36 countries. The project is an expression of ESN’s commitments towar ...
Voir le projet

 2

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...y of the Institute to guide the project, based on collaborations linked primarily with that entity. In addition, some faithful or old partnerships, beyond these territories, as Artevelde Hogeschool - University College Ghent in Belgium, ASH Berlin in Germany, the High School Fribourg in Switzerland have been requested since they have continuously hosted a student of our contract research institute ...
Voir le projet

 1

 TERMINÉ 

Auslandspraktika für Jugendliche in der beruflichen Erstausbildung

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...cturing industry“. They are students of the part-time Vocational School in the first and second year of their three-year courses. The overwhelming majority of the participants have either the University of Applied Sciences Entrance Qualification or even the University Entrance Qualification. Group B: 13 students of the last year (grade 12) of the Vocational College, speciality Foreign Languages – ...
Voir le projet

 6

 TERMINÉ 

'e'-Based Inter Regional Development (e-BIRD)

Date du début: 30 sept. 2003, Date de fin: 30 déc. 2007,

... study, in Sciences for instance. Besides, others universities can rely on these examples for the implementation of the Bologna Process (Project 'Obstacle-free studying: integration and uniformity in university courses of physics in the GR' have realised good practices tools to this purpose). All the events led witihin the operation (115) permitted first, to reinforce the mutual knowledge of their ...
Voir le projet

 7

 TERMINÉ 
...gnize in the image of the innovative group of users.NEXT ACTIVITIES:Several transnational Lab applications will be proceed until June 2015.A Lila process Guide will be publish with the support of the University of Lorraine and Birmingham City University.All results of Lila will be pitched and dabated during national and european events in 2015.The community of hundreds users will growth again.>>> ...
Voir le projet

 7

 TERMINÉ 
Increasingly challenging global and environmental requirements have resulted in agricultural systems coming under increasing pressure to enhance their resilience capabilities in order to respond to the abrupt changes in resource quality, quantity and availability, especially during unexpected environmental circumstances, such as uncertain weather, pests and diseases, volatile market conditions and ...
Voir le projet

 15

 TERMINÉ 
AQUAEXCEL2020 aims to integrate top class European aquaculture research facilities of very diverse nature, covering all relevant scientific fields for research and innovation in aquaculture, from genetics to technology through pathology, physiology and nutrition. It will put in place a user-friendly one-stop access to high-quality services and resources from 39 installations covering both establis ...
Voir le projet

 22

 TERMINÉ 

Smart Tools for Gauging Nano Hazards (SmartNanoTox)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

A definitive conclusion about the dangers associated with human or animal exposure to a particular nanomaterial can currently be made upon complex and costly procedures including complete NM characterisation with consequent careful and well-controlled in vivo experiments. A significant progress in the ability of the robust nanotoxicity prediction can be achieved using modern approaches based on on ...
Voir le projet

 12

 TERMINÉ 
The present situation of nuclear energy in Europe asks for a continuing effort in the field of Education and Training aimed to assure a qualified workforce in the next decades. In this scenario, the present proposal is aimed at enhancing and networking the Europe-wide efforts initiated in the past decades by different organisations belonging to academia, research centres and industry to maintain a ...
Voir le projet

 25

 TERMINÉ 
DANUBIUS-PP is a three-year project to raise DANUBIUS-RI (International Centre for Advanced Studies on River-Sea Systems) to the legal, financial and technical maturity required for successful implementation and development. DANUBIUS-RI is a pan-European distributed research infrastructure (RI) building on existing expertise to support interdisciplinary research on river-sea (RS) systems, spanning ...
Voir le projet

 29

 TERMINÉ 

Flexible and Mobile Economic Processing Technologies (FAME)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

FAME aims to increase the competiveness of the mining of European mineral resources and to stimulate more private engagement and investment and thus business development with the potential to maintain and create high quality jobs within the EU28. The focus and a principal aim is to enhance mineral processing and mining skills within Europe. A medium to long term aim is to reduce the reliance of Eu ...
Voir le projet

 18

 TERMINÉ 
The use of advanced methods to solve practical and industrially relevant problems by computers has a long history. Whereas Symbolic Computation is concerned with the algorithmic determination of exact solutions to complex mathematical problems, more recent developments in the area of Satisfiability Checking tackle similar problems but with different algorithmic and technological solutions. Though ...
Voir le projet

 11

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

Dynamics of and in Complex Systems (DIONICOS)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

With the statics of a wealth of model systems in statistical and condensed-matter systems being relatively well understood, an increased effort in research in these fields is channelled towards the understanding of dynamical phenomena. This agenda is even more pressing as dynamic effects are of crucial importance for many experimentally observed and technologically important phenomena.In the first ...
Voir le projet

 8

 TERMINÉ 
In the Early Modern Age (16th-17th centuries) the construction of ocean-going ships was paramount to the development of cultural encounters in what became the Age of Discovery and European expansion. In the case of the Iberian Empires, the establishment of new trade routes brought up the need for armed merchantmen, galleons and smaller vessels, placing unprecedented demands on Iberian forests for ...
Voir le projet

 9

 TERMINÉ 
"The project addresses materials with realistic - heterogeneous and anisotropic - microstructures that contain inhomogeneities (pores/cracks/inclusions) of diverse shapes, orientations and physical properties. An important feature of such microstructures, that complicates the analysis but has a profound impact on their overall behavior, is their “irregular” character. For example, pores typically ...
Voir le projet

 5

 TERMINÉ 

Learning Agreement Online System

Date du début: 1 sept. 2015, Date de fin: 31 oct. 2017,

...ing up time for the staff members to work on other international relation activities or improve the quality of credit mobility. The partnership will be based on a prototype developed by the European University Foundation – Campus Europae, hence the activities of the partnership will be based on testing cycles for assessment purpose to best fit the needs of higher education institutions and comply ...
Voir le projet

 8

 TERMINÉ 

DRIVING RE-INVESTMENT IN R&D AND RESPONSIBLE ANTIBIOTIC USE (DRIVE-AB)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

Antimicrobial resistance (AMR) is widespread. Its global human and economic burden is tremendous and increasing annually. Yet today only a few pharmaceutical companies retain active antibacterial drug discovery programmes. While the elaboration of antibiotics with novel mechanisms of action is scientifically complex, the chief challenge is diminishing incentives. Pre-market regulatory requirements ...
Voir le projet

 27

 TERMINÉ 

Engine Module Validators (ENOVAL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Voir le projet

 37

 TERMINÉ 
Assuming an annual birth rate of 10.25 births/1,000 population approximately 25,000 Extremely Low Gestational Age Newborns are born every year in the EU. Conservative figures estimate that approximately half of all these babies will develop low blood pressure and require treatment. However, no uniform criteria exist to define hypotension and the evidence to support our current management strategie ...
Voir le projet

 17

 TERMINÉ 
Escalating incidents in complex environments can lead to severe cascading effects and quickly become extremely difficult for emergency services to handle. Such incidents can have enormous consequences with respect to life, property and the environment and for both infrastructure and the general public. These consequences can in many situations have both direct and indirect effects, not only in the ...
Voir le projet

 13

 TERMINÉ 

Integrated Biotechnological Solutions for Combating Marine Oil Spills (Kill●Spill)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

Kill●Spill delivers innovative (bio)technologies, which can be integrated to the real sequences of state-of-the-art actions used currently to cleanup oil spills. The catalogue of Kill●Spill products & technologies is based on a review of technology & knowledge gaps in approaches of oil spill disasters and brings appropriate tools for 1st response, follow-up, and longer-term actions, specifically t ...
Voir le projet

 35

 TERMINÉ 

Sustainable Technologies for Calcined Industrial Minerals in Europe (STOICISM)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

Europe is a major global producer of industrial minerals. Around 180 million tonnes per year of products are extracted in the EU, with an estimated contribution of €10 billion to European GDP and offering direct employment to some 42,500 people. A secure supply of sustainable mineral products is essential to maintaining the European mining, mineral and manufacturing industries.The main objective ...
Voir le projet

 17

 TERMINÉ 
Background:In current drug safety education and training in Europe, an integrative and translational approach is lacking. This shortfall has been identified by EUFEPS. The IMI (‘Strategic Research Agenda’), the FDA and the EMEA have also characterised this fact as a crucial gap in the education and training of scientists evaluating the safety of drug candidates and new medicines. Scope and objecti ...
Voir le projet

 34

 TERMINÉ 

Management of the Future Internet (Flamingo)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

The goals of FLAMINGO are (a) to strongly integrate the research of leading European research groups in the area of network and service management, (b) to strengthen the European and worldwide research in this area, and (c) to bridge the gap between scientific research and industrial application. To achieve these goals, FLAMINGO performs a broad range of activities, such as to develop open source ...
Voir le projet

 9

 TERMINÉ 
"In line with the Lisbon strategy and 2020 perspective “Petrus” initiative coordinates since 2005 universities, WMOs, training organisations and research institutes efforts to develop cooperative approach to education and training (E&T) in the geological disposal with the purpose of expanding this cooperation under PETRUS3.PETRUS3 project aims at continuation of the European Cooperation in this ar ...
Voir le projet

 20

 TERMINÉ 

Mobile Cloud Computing: Networks, Services and Architecture (MONICA)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The overall objective of the MONICA project is to accelerate the transfer and deployment of research knowledge between European countries and China in order to obtain better understanding of mobile cloud computing in terms of its networks, services and architecture. In particular, the transfer of knowledge, mainly as a result of researcher’s mobility, will focus on a new vision of mobile cloud com ...
Voir le projet

 4

 TERMINÉ 

Marine Microbial Biodiversity, Bioinformatics and Biotechnology (MICRO B3)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

Micro B3 will develop innovative bioinformatic approaches and a legal framework to make large-scale data on marine viral, bacteria; archaeal and protists genomes and metagenomes accessible for marine ecosystems biology and to define new targets for biotechnological applications. Micro B3 will build upon a highly interdisciplinary consortium of 32 academic and industrial partners comprising world-l ...
Voir le projet

 32

 TERMINÉ 

SYSTEMS THINKING FOR COMPREHENSIVE CITY EFFICIENT ENERGY PLANNING (STEEP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2015,

The partners of the project are 3 cities with similar characteristics, experience and policies in specific sustainable use and production of energy and very ambitious carbon and energy reduction targets, aligned with Europe’s targets. In each city, initiatives to reduce energy inefficiency are already in place; however each of them has been aimed at a specific sector objective, while overlooking t ...
Voir le projet

 10

 TERMINÉ 
"HYSOP’s goal is to develop solutions for manufacturing lightweight high temperature (HT) turbine components and to design new coating systems (protection against oxidation, water vapour and CMAS).Nb/Nb5Si3 and Si3N4/MoSi2 composites are lightweight HT materials (density < 6.5~7 and < 5.6 g/cm3, respect.) with application potential above 1300°C making them candidates for advanced aero-engine compo ...
Voir le projet

 11

 TERMINÉ 
"Living organisms exhibit great variation in size and shape, and display many morphological innovations. Recent progress has been made in identifying the genetic basis for the evolution of some traits but there remains a paucity of knowledge concerning the evolution of complex morphological traits, and how the underlying changes arose and spread in populations. This proposal will address this by e ...
Voir le projet

 2