Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Low Coordinate Transition Metal Single Molecule Magnets (LoCo)

Date du début: 13 févr. 2017, Date de fin: 12 févr. 2019,

The Fellow, Maialen Espinal (MEV) from the University of Bath, outlines a case for support to work alongside the Host, Prof Mike Whittlesey (MKW: University of Bath, UK), on the design of novel two-coordinate complexes of Ni, Co and Fe as single molecule magnets (SMMs).The rationale for the work is the 2013 report by the MKWs group of a cationic Ni(I) N-heterocyclic carbene complex that exhibited ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

Founded in 1975, the coordination office for the practical semesters (KOOR) based at Karlsruhe University of Applied Sciences is a state-wide institution for all universities of applied sciences in Baden-Württemberg. To accomplish the European "Lifelong Learning Program (LLP) / Erasmus+", the Erasmus consortium "Baden-Württemberg Partnership for the Exchange of Students, Graduates and Knowledge Tr ...
Voir le projet

 1

 TERMINÉ 
...ument.project partners:- Berufliches Seminar Karlsruhe, Germany (coordinating partner)- Education Group, Austria- Escuela Professional Otxarkoaga, Spain- Falun Borlänge Regionen AB, Sweden- Istanbul University, Turkey- Landesinstitut für Schulentwicklung, Baden-Württemberg (associated partner)- Ministerium für Kultus, Jugend und Sport, Baden-Württemberg (associated partner)- Pädagogische Hochschu ...
Voir le projet

 6

 TERMINÉ 

Cultureshake

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

... multilingual settings. To accomplish this there are four institutions involved with complementing expertise and background. The University of Education Karlsruhe (PH), Germany, as coordinator contributes with theoretical background. The Shakespeare Birthplace Trust (SBT) at Stratford, U.K., as culture centre applying culture to everyday life builds as institution a bridge between theory and pract ...
Voir le projet

 5

 TERMINÉ 

EMMC Mechatronic Engineering

Date du début: 1 août 2015, Date de fin: 31 juil. 2020,

...optics, bionics and robotics.Course durationTwo years (120 ECTS credits).Brief descriptionThe EU4M EMJMD is promoted by a well-integrated partnership fully supported by five partner Universities (the University of Oviedo, Spain, the Karlsruhe University of Applied Sciences, Germany, the National Engineering Institute in Mechanics and Microtechniques, France, the Ivanovo State Power Engineering Uni ...
Voir le projet

 5

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

The Protestant University of Freiburg successfully participated in the EU-programme Erasmus + for mobility support for higher education with programme countries (key action 1) in the academic year 2015/16. We have operated the programme lines SMS and ST (STA and STT); for the programme line SMP we participated via the consortium KOOR-BEST of the Karlsruhe University of Applied Sciences, steering S ...
Voir le projet

 1

 TERMINÉ 

Central College Nottingham - European Scholarship Programme

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...nts on collective projects, including preparation for the design industries. The students will visit new start-up businesses in Karlsruhe, and visit the Eunique Applied Arts International Trade Fair, University HfG, Design Museum, Karlsruhe Palace, Majolica Museum and Contemporary Art Galleries. Each student will have an individual work placement during their visit in an area linked to their spe ...
Voir le projet

 4

 TERMINÉ 
...h external institutions such as social partners or individual enterprises: The Institute of Vocational and General Education (IBP) at the Karlsruhe Institute of Technology KIT (coordination); The University of Barcelona (UB); Pontydysgu, ltd., U.K.; AxA Consulting, Romania; Institute Nefiks, Slovenia. This project aims to support EU and national policy makers for what concerns the development & im ...
Voir le projet

 6

 TERMINÉ 
...nguage ), giving emphasis on the field of intercomprehension . The seminar will be held in Spain. Training (educational) activities :  One flow object with on-site observation (job shadowing) in the University of Al.I. Cuza Romania on the subject of intercomprehension . The expected results have to do with upgrading the methodology of teaching subjects, modernization and introduction of ICT across ...
Voir le projet

 2

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

The mobility of individuals (KA103) in the framework of the Erasmus+ Program has been an inherent part of the University of Stuttgart’s international activities and its largest exchange program for many years. During the project 2014 (duration of 24 months from June 01, 2014 until May 31, 2016) a total of 430 exchange options (student mobility only) at 232 partner institutions in 28 program countr ...
Voir le projet

 1

 TERMINÉ 
... of this component will be a General DLA and a Common Methodology for implement it, to guarantee that localcharacteristics are taken into account 4. Case Study; coordinated by CCDRN and University of West Macedonia.There will be 1 case study in 2 regions (West Macedonia and North Portugal) to probe that the CM designed could be used to adapt the General DLA to a local situation. Furthermore, as th ...
Voir le projet

 11

 TERMINÉ 

ELFE - E-Learning for Female Entrepreneurs (ELFE)

Date du début: 31 déc. 2003, Date de fin: 29 sept. 2007,

...om, France, Ireland, Belgium and Germany, builds on the success of the German KEIM initiative in developing an online course for women entrepreneurs. ELFE, which is being led by Germany’s Karlsruhe University of Applied Science, will both tailor the on-line course for the local needs of project partners and harmonise it for trans-national use with the development of new modules concerning European ...
Voir le projet

 9

 TERMINÉ 

smARTplaces - A European Audience Development Project

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

SmARTplaces (SP) is a visionary, long-term European Audience Development Project, aiming to revolutionize the way culture and art can be perceived and consumed, using digital technology and new forms of cultural mediation. SmARTplaces will be delivered by a partnership of 8 museums from 6 different countries in Europe (supported by 2 research partners) in order to achieve a new approach to audienc ...
Voir le projet

 9

 TERMINÉ 

INTERFACES

Date du début: 1 juin 2016, Date de fin: 30 nov. 2019,

Interfaces is an international, interdisciplinary project where a range of new audiences engage with new music. It unites nine diverse partners from 8 European countries plus several other European and international associate partners, with extensive and varied experience in performing, multi-media, new media, acoustic and electroacoustic research, community action and education. This rich experti ...
Voir le projet

 9

 TERMINÉ 
A shared learning environment for vocational and engineering students is developed, in which project-based learning methodology is implemented targeting both students’ groups in final two years of their academic track. The developed education methodology is expected to yield a new line of industry human capital (engineers and technicians), who are technically and socially competent for professiona ...
Voir le projet

 10

 TERMINÉ 
VicInAqua will follow an integrated approach in order to develop a sustainable combined sanitation and recirculating aquaculture system (RAS) for wastewater treatment and reuse in agriculture in the Victoria Lake Basin area. In this decentralized integrated treatment system wastewater from households and fish processing industry as well as RAS production water will radically reduce stress on the ...
Voir le projet

 11

 TERMINÉ 

Smart Manufacturing for EU Growth and Prosperity (MAKERS)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

MAKERS will bring together leaders from business, academia and policy to study issues related to the drivers and dynamics of sustaining the competitiveness of EU manufacturing sectors. The project’s innovative research, training and mobility activities will address key concerns related to the historic opportunity for the EU to lead a manufacturing renaissance that not only upgrades existing manufa ...
Voir le projet

 17

 TERMINÉ 
...continuous development in diverse academic disciplines and/or professional settings. The project will support in creating a community of researchers in different disciplines who share inter and intra university practices in teaching and learning.E-TALEB will acknowledge the variety and quality of teaching, learning and assessment practices that support and underpin student learning including instr ...
Voir le projet

 14

 TERMINÉ 
...urish in different business size models, particularly in micro/small domains, which are most suitable in heavily populated countries with economic hierarchy similar to the one in Egypt. Hence, a post-university continuous learning program is developed targeting graduates with mechanical/industrial engineering background, which blends manufacturing technology expertise and business- and technology- ...
Voir le projet

 10

 TERMINÉ 

foSTering early childhOod media liteRacy competencIES

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

In our digital society, children widely use new media technologies and ICT tools everywhere diffused, starting at very young age. Although the role of ICT in education is becoming increasingly important and acknowledged as one of the first objectives towards the Digital Competence in the EU2020 strategy, from the point of view of ECEC the use of new media technology in preschool education has not ...
Voir le projet

 6

 TERMINÉ 
What is Technical Communication (TC) and why is it important? For the safe and efficient use of products – whether devices, machines, software, entire production plants or service provider products – users require information. The manufacturers or providers of the products are obligated to make this information available across the entire product life cycle in a suitable media format. The creation ...
Voir le projet

 9

 TERMINÉ 
EmployID aims to support and facilitate the learning process of Public Employment Services (PES) practitioners in their professional identity transformation process. To perform successfully in their job they need to acquire a set of new and transversal skills, develop additional competencies, as well as embed a professional culture of continuous improvement. EmployID will offer efficient use of te ...
Voir le projet

 12

 TERMINÉ 

Video Enhanced Observation

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

...ucation and training’ by using an innovative technological approach to support initial teacher training and continuing professional development. The project builds on work undertaken by Newcastle University, which has developed a prototype App for classroom observation – the VEO, Video Enhanced Observation. This App adopts a novel and data-driven approach to classroom observation by enabling the o ...
Voir le projet

 6

 TERMINÉ 

Mobilising and Transforming Teacher Education Pedagogies

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

Despite the increasing popularity and adoption of mobile devices by young peoples, universities and schools are only recently starting to consider if and how these technologies can be harnessed for formal learning and there is a dearth of research-informed advice and guidance to support educators in integrating them into their practices to effect pedagogical change. This is particularly noticeab ...
Voir le projet

 8

 TERMINÉ 
Learning Layers develops a set of modular and flexible technological layers for supporting workplace practices in SMEs that unlock peer production and scaffold learning in networks of SMEs, thereby bridging the gap between scaling and adaptation to personal needs. By building on recent advances in contextualized learning, these layers provide a meaningful learning context when people interact with ...
Voir le projet

 20

 TERMINÉ 
The vision of ReBORN is to demonstrate strategies and technologies that support a new paradigm for re-use of production equipment in old, renewed and new factories; maximizing the efficiency of this re-use and making the factory design process much easier and straight forward, shortening ramp-up times and increasing production efficiency and flexibility. This paradigm will give new life to decommi ...
Voir le projet

 19

 TERMINÉ 

Water Enhanced Resource Planning "Where water supply meets demand" (WatERP)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

Water supply involves many actors. While many management tools exist, they cannot intercommunicate and no framework is available for integrating all of them, preventing integrated water resources management to be fully achieved. WatERP will develop a web-based Open Management Platform (OMP), integrating intelligent systems through open interfaces, to enable water supply distribution chains to be m ...
Voir le projet

 11

 TERMINÉ 

Intelligent Tutoring Interface for Technology Enhanced Learning (INTUITEL)

Date du début: 1 oct. 2012, Date de fin: 30 juin 2015,

The objective of INTUITEL is to enhance state-of-the-art e-learning content and Learning Management Systems (LMS) with features that so far have been provided only by human tutors. An INTUITEL-enabled system constitutes an integrated learning environment that configures itself in response to any learner, monitors his/her progress and behaviour, combines these data with pedagogical and methodologic ...
Voir le projet

 12

 TERMINÉ 

Energetic Algae (EnAlgae)

Date du début: 31 oct. 2009, Date de fin: 29 juin 2015,

Aim Energetic Algae aims to reduce CO2 emissions and dependency on unsustainable energy sources in NWE. by accelerating the development of sustainable technologies for algal biomass production. bioenergy and greenhouse gas (GHG) mitigation from pilot phase to application and marketable products. processes and services. This is achieved by bundling know-how. finance and political support. The plan ...
Voir le projet

 21

 TERMINÉ 

ECO-efficient LASER technology for FACTories of the future (ECO-LASERFACT)

Date du début: 31 janv. 2011, Date de fin: 31 mars 2015,

ECO-LASERFACT has a double objective: 1. to facilitate the know-how transfer for improved eco-friendly and cost effective laser based processes from leading Research Performers to Small and Medium Enterprises (SMEs). and 2. to federate NWE Research Performers (i.e.. R&D Centres and Universities) that are involved on laser micro-manufacturing. This approach is expected to stimulate greater entrepre ...
Voir le projet

 10

 TERMINÉ 

Clusters for European Innovation Cross-Linking (CLUSTERIX)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

All 9 partners from 8 countries represent regions/countries, where clusters are already in place as an important instrument for regional economic development, supporting innovative collaboration within industries. Now experience shows, that new technological fields emerge in the interface between existing industries. As such the regional authorities who initially set up and developed clusters in c ...
Voir le projet

 9

 TERMINÉ 

Boosting European Games Industry (BOO-Games)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

Once the economic force of Creative Industries (CI) was showcased by several studies,the development of strong digital+interactive media strategies is still high on the agenda throughout Europe. Especially the digital games market is a fast growing market within CI:The global demand for digital games is expected to grow 10% annually in the next years.Today the production of dig.games is an interna ...
Voir le projet

 14

 TERMINÉ 

European Cultural Routes - Transfer Experiences, Share Solutions (CERTESS)

Date du début: 31 déc. 2011, Date de fin: 29 nov. 2014,

CERTESS project aims at setting up a common methodological framework on how to develop, manage and enhance European Cultural Routes (ECRs), by utilising reference development and governance instruments targeted to foster sustainable cultural tourism.Most of ECRs identified to date, and regions intersected by them, lack in fact comprehensive methodologies, governance instruments, innovative ideas t ...
Voir le projet

 12

 TERMINÉ 

Scalable Preservation Environments (SCAPE)

Date du début: 1 févr. 2011, Date de fin: 30 sept. 2014,

Description This project will enhance the state of the art of digital preservation through scalable preservation actions; automated, quality-assured workflows; and a policy-based planning and watch systemThe SCAPE project will enhance the state of the art of digital preservation in three ways: by developing infrastructure and tools for sc ...
Voir le projet

 21

 TERMINÉ 
As population of our cities grow, so does land area and this result in increase of an average temperature. The buildings and roads absorb temperature produced during the day, like giant heaters, and store it. The energy is then released during the night time. This often means a big difference in the temperature between city and its surrounding areas.This phenomenon is called the Urban Heat Island ...
Voir le projet

 18

 TERMINÉ 

Delivering Local Bioenergy to NW Europe (BioenNW)

Date du début: 31 mars 2010, Date de fin: 30 mars 2014,

...case studies.More information is available under: http://bioenergy-nw.eu/case-studies-3/Bioenergy training coursesThe European Bioenergy Research Institute (EBRI) at Aston University has launched a suite of Continuing Professional Development (CPD) courses to enable you to increase your personal knowledge and skills in key areas relating to the bioenergy sector.Designed by EBRI’s world-leading sci ...
Voir le projet

 15

 TERMINÉ 

New post-socialist city: Competitive and Attractive (ReNewTown)

Date du début: 31 mars 2011, Date de fin: 30 mars 2014,

Over 300 million people in Central and East Europe live in areas affected by socialist era. Close to 2/3 of them live in cities and towns often with districts which were created and quickly developed in this period. Whoever has travelled through countries of Former Eastern Europe bloc would agree that very often grim looking buildings make out landscape of almost every city. These remains of comm ...
Voir le projet

 8

 TERMINÉ 

Development of the next generation bioreactor system (BioNexGen)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2014,

Membrane bioreactor (MBR) technology is regarded as key element of advanced wastewater reclamation and reuse schemes and can considerably contribute to sustainable water management. MBR technology is used for wastewater treatment and reuse in municipal, agricultural and a variety of industrial sectors in Europe and MENA. The market pull, in the context of this NMP call, is the increasing demand fo ...
Voir le projet

 12

 TERMINÉ 
GROUND-MED project will demonstrate geothermal heat pump (GSHP) systems for heating and cooling of measured SPF>5,0 in 8 demonstration sites of South Europe. As the SPF is determined not only by the heat pump unit, but by its operating conditions imposed to the heat pump by the ground heat exchanger and the heating/cooling system of the building as well, integrated systems incorporating the follow ...
Voir le projet

 24