Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...as and includes a sustainable tourism development strategy for the Park area. Official approval of the Management Plan is anticipated by the Slovak government in November 2010, and the Ministry of Environment is providing guarantees to implement the plan. Reconstruction of tourist trails at more than 60 localities in the most visited areas where trails pass valuable biotopes and rocky terrain. ...
Voir le projet

 1

 TERMINÉ 

FUTUREforest - Woodlands for Climate Change (FUTUREforest)

Date du début: 30 sept. 2008, Date de fin: 29 sept. 2011,

...forest management practices. The partnership consists of six regional public forestry authorities, one regional association and one national public forestry authority from seven EU Member States. (1) Ministry of Rural Development, Environment and Consumer Protection of the Federal State of Brandenburg, Germany, (short: Brandenburg); (2) Forestry Commission Wales, United Kingdom, ( Wales); (3) Fren ...
Voir le projet

 8

 TERMINÉ 
...ith new equipment, training was provided to the laboratory’s staff, and work started on new sampling and ISO 17025 accreditation procedures. However, after the merger of the Ministry of Environment and the Ministry of Forests, the laboratory lost about half its staff and the first results of Task 1 were rendered redundant (the laboratory was downsized, trained staff were dismissed, and the work ...
Voir le projet

 1

 TERMINÉ 

Conservation and management of the biotope 'S. Genuario Wetland' (San Genuario)

Date du début: 1 juin 2001, Date de fin: 31 mars 2005,

...station and a capture area for game. Fortunately, in the last case the province assigned the management of the area to the Park. On the other hand, for the building of the power plant the Environment Ministry and regional authorities have granted all the necessary permits for the power station to be built. The beneficiary and some NGOs and other interested parties have presented formal complaints, ...
Voir le projet

 2

 TERMINÉ 
...wolf and lynx, species management plans were to be drafted and a system for damage compensation developed, through close collaboration between the beneficiary (a state university) and the Hungarian Ministry of the Environment. A public relations campaign would round off the project measures. The Ministry of the Environment, as a partner of the project, committed itself to apply the results of ...
Voir le projet

 2

 TERMINÉ 

Protection and usage of aapa mires with a rich avifauna (Aapa & Avi)

Date du début: 1 nov. 2000, Date de fin: 31 oct. 2005,

...ould be purchased. Results The management plans for the five project areas were approved by the Finnish Ministry of the Environment. More than 6,300 ha of land was acquired for nature conservation purposes and a further 225 ha leased on a five-year contract. Some 80 ha of mires, 15 ha of wet meadows and ...
Voir le projet

 3

 TERMINÉ 
...least a short-term seed bank and thus restoration measures for recently extinct populations may be successful. During the project, it was agreed between Metsähallitus and the Ministry of Environment that Metsähallitus will have the monitoring responsibility for lady’s slipper in northern Finland and for marsh saxifrage over the whole of Finland. The monitoring experience of the project ...
Voir le projet

 1

 TERMINÉ 

Innovative methods of Barta river basin management system (Barta club)

Date du début: 1 déc. 2001, Date de fin: 31 août 2005,

...area. More specifically, the project planned the establishment of a steering committee that would establish a new public institution for river basin management (the participants of which would be the Ministry for Environment Protection and Regional Development, the Regional Environment Management Agency, eight local governments (Barta, Dunika, Gramzda, Kaleti, Nica, Otanki, Rucava and Virga), the ...
Voir le projet

 9

 TERMINÉ 

Restoration of Comana Wetland (Comana)

Date du début: 1 juin 2002, Date de fin: 31 mai 2004,

... the draft, the Comana wetland should be declared a Natural Park (category IV IUCN). The management plan and proposal for the declaration of a new protected area has been submitted to the Romanian Ministry of Environment and Waters. Nine information panels were installed in the project area in March and April 2003. The panels provide information about the project area, objectives and planned mea ...
Voir le projet

 2

 TERMINÉ 

Conservation of Natura 2000 biotopes in Karula National Park (KARULA)

Date du début: 1 nov. 2001, Date de fin: 31 déc. 2004,

...t period • To stabilise the populations of the bird species corncrake, Crex crex and lesser spotted eagle, Aquila pomarina, by conserving the habitat of these meadows. • To assist the Ministry of the Environment and the Ministry of Agriculture in developing a compensation system for meadow management that would ensure management of valuable semi-natural meadows and habitats for the future ...
Voir le projet

 1

 TERMINÉ 

CAPACITY BUILDING ON CONSERVATION OF ALBANIAN WETLAND ECOSYSTEMS (ALWET) (ALWET)

Date du début: 1 janv. 2004, Date de fin: 31 déc. 2006,

... The ALWET project was the first effort in Albania at drafting wetlands inventories as habitats . The adapted version of the MedWet database developed under the ALWET project was used by the Ministry of Environment, Forests, and Water Administration, five educational and research institutes, and two non-governmental bodies. The project trained 35 people representing government, scientific i ...
Voir le projet

 2

 TERMINÉ 

Restoration of Water Regime in Sur Fen Nature Reserve (SUR FEN NATURE RESERVE)

Date du début: 1 janv. 2003, Date de fin: 1 janv. 2007,

...ure 2000 site will continue to suffer from a lack of water, mainly in the late summer period. The situation is made worse by to the fact that massive urbanisation was endorsed by the Ministry of Environment and other relevant decision-making authorities. In the near future, 4 000 new houses will be built in the direct vicinity of the site. It is planned that by 2010, the 1 700 inhabitants of the ...
Voir le projet

 1

 TERMINÉ 
...tus; The quality of 80 nesting sites of lesser spotted eagle pairs will be improved; An action plan will be drawn up for six lesser spotted eagle SPAs. This will be approved by the environment ministry; A wide range of awareness-raising activities is planned, including stakeholder workshops, seminars for state forest enterprises, a mobile photo exhibition on the target species and the involve ...
Voir le projet

 1

 TERMINÉ 
... The four-year project was started on 01 January 2004. MME BirdLife Hungary coordinated the project with two partners: Duna-Ipoly National Park Directorate and Kiskunság National Park. Ministry of Environment and Water Affairs was co-financing the project. The main target area of the four-year project was the Peszéradacs region of Kiskunság, although monitoring activities were carried o ...
Voir le projet

 3

 TERMINÉ 
... awareness of the project species and of eagles in general develop international co-operation in the areas of protection and research improve the status of the Natura 2000 network assist the Ministry of Environment in executing projects for the protection of the target species.Results The EAGLELIFE project successfully used a nationwide approach to imp ...
Voir le projet

 5

 TERMINÉ 

Priority forest, sub-alpine and alpine habitats in Romania (Forest-Alp NATURA 2000)

Date du début: 7 janv. 2005, Date de fin: 30 janv. 2009,

...s across the country. They are also available from the project website. (iv) Development of a system for compensation payments for private forest landowners. This has been recognized by the Ministry of Environment and the Ministry of Agriculture and serves as a model for compensation schemes for all habitats. Further information on the project can be found in the project's layman report and A ...
Voir le projet

 4

 TERMINÉ 
...ctions: Inclusion of eight sites – around 40 000 ha in total – of the national park project area in the Natura 2000 network and their official approval of the Romanian environment ministry. Preparation of management plans for the eight protected sites, including feedback and agreement from local stakeholders. Establishment and operation of an animal rescue mobile unit and rehabilitation ce ...
Voir le projet

 5

 TERMINÉ 

Improvement of Industrial Hazardous Waste Management in Turkey (HAWAMAN)

Date du début: 1 janv. 2007, Date de fin: 30 avr. 2009,

...tical Institute was required to obtain reliable data and to ensure the harmony of the hazardous waste notification system with other environmental information systems to be implemented with or by the Ministry of Environment and Forests. More than 40 000 potential hazardous waste generators were identified, registered and contacted. The response by industry was good: most of the larger industries ...
Voir le projet

 2

 TERMINÉ 
...r use as an efficient preventive measure among livestock raisers and shepherds. A protocol for the operation of the BET and for measures to handle bear-human conflict was produced and approved by the Ministry of Environment, Energy and Climate Change (YPEKA), constituting the first such attempt in Greece. In collaboration with other NGOs, the project also contributed to the development of a set of ...
Voir le projet

 5

 TERMINÉ 
...experience can be replicated in similar Mediterranean environments. At a national level, the project collaborated with the Spanish Ministry of the Environment in the development of indicators of climate change effects in the Biosphere Reserves. The project will bring socio-economic benefits thanks to the information generated and capacity building for land owners and managers, and six companies i ...
Voir le projet

 1

 TERMINÉ 
...ocal stakeholder groups. The management plans for all four project sites - Aizkraukle Mire and Forests, Aklais Mire, Melnais Lake Mire and Rozu Mire Nature Reserves - were approved by the Ministry of Environmental Protection and Regional Development. These management plans serve as guidelines for the implementation of restoration actions on these Natura 2000 sites and, as such, are a useful tool f ...
Voir le projet

 3

 TERMINÉ 
...e of large raptors in Bulgaria. Furthermore, a replicable model for protection of livestock from predator attacks was also developed. Finally, the beneficiary submitted a formal letter to the Ministry of Environment and Waters, requesting an update of the standard data forms of a total of five SPAs and five SCIs to reflect the changes in the population and status of the target species in these a ...
Voir le projet

 2

 TERMINÉ 
...to the end of the project, the final conference was held with more than 130 participants, including international experts. The project initiated ongoing networking amongst specialists from the Ministry of Environment, The Centre of Forest Protection and Silviculture, Rescue Service, Ministry of the Interior, State Forest Service and Environmental Board. This was the first time these responsible o ...
Voir le projet

 1

 TERMINÉ 
...howed that at least one wildcat migrated between these sites using a green corridor. Following on from the LIFE project, the Wildcat Leap Project, sponsored by the German Federal Environment Ministry, provides the opportunity to protect the wildcat in the long-term. Moreover, the Pathway Plan for the Wildcat has been incorporated in the state development plans of Hesse and Thuringia. The right pla ...
Voir le projet

 8

 TERMINÉ 
Background The Cyprus cedar (Cedrus brevifolia) is an evergreen long-lived coniferous tree that is endemic to Cyprus. Its natural distribution is very limited: it occurs only in a small area at the peak of Tripylos mountain, in the Paphos forest, in fragmented, scattered stands, over six separate geographical areas, mostly within the Koilada Kedron-Kampos ...
Voir le projet

 3

 TERMINÉ 
Description (EN): The AlpGovs’ main objective is to support effective and efficient EUSALP implementation in a systematic transnational approach through designing and testing appropriate governance structures and mechanisms mainly on the level of Action Groups (AGs), at the same time to create synergies with the other EUSALP implementing bodies General Assembly and Executive Board a ...
Voir le projet

 13

 TERMINÉ 

GPPbest - Best practices exchange and strategic tools for GPP (LIFE GPPbest)

Date du début: 1 oct. 2015, Date de fin: 30 juin 2018,

Background The most recent European Public Procurement directive emphasises the need for including environmental and social aspects in procurement procedures, while promoting a lifecycle costing approach. However, GPP is still not a common and established practice, underlining the evident gap between policy and its implementation. The lack of effective go ...
Voir le projet

 5

 TERMINÉ 
Background The Natura 2000 site, Rizoelia National Forest Park, covers only 0.001% of the surface area of Cyprus, yet it is a reservoir of threatened plants (a so called ‘biodiversity hot spot’). The site contains four habitat types that are protected under the Habitats Directive, three of which are priority habitats (1520 * Iberian gypsum vegetation ...
Voir le projet

 4

 TERMINÉ 

Efficient Managers for Efficient Natura2000 Network (EME Natura2000)

Date du début: 1 août 2012, Date de fin: 31 janv. 2016,

Background The project addresses the following environmental problems: The territorial plans, as well as other strategic planning documents in Romania, do not reflect biodiversity concerns, therefore, conservation measures are not properly integrated into strategic planning and into the activities of economic sectors. As a result, very often economic int ...
Voir le projet

 3

 TERMINÉ 
Background Endemic forests with Juniperus spp. is listed in Annex I of the Habitats Directive as a priority habitat for conservation. In Cyprus, there is currently no documented evidence that active conservation measures have ever been implemented for the protection and restoration of this habitat, which is threatened by natural regeneration, fire, fragme ...
Voir le projet

 5

 TERMINÉ 

Capitalising Climate Change Knowledge for Adaptation in the Alpine Space (C3-Alps)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

C3-Alps will synthesize, transfer and implement in policy and practice results of previous Alpine Space projects on climate change adaptation. The capitalisation approach aims at a) generating new and directly usable forms of state-of-the-art synthesis adaptation knowledge in the Alps, harmonised across sectors and useful to adaptation decision-makers, b) its effective and tailor-made communicatio ...
Voir le projet

 17

 TERMINÉ 

Low Carbon South East Europe  (LOCSEE)

Date du début: 30 sept. 2012, Date de fin: 29 sept. 2014,

Combating climate change and reducing greenhouse gas emissions is one of the biggest challenges of the European Union which is addressed also in the Europe 2020 Strategy with the objective to reduce greenhouse gas emissions by 20% by year 2020 compared to year 1990. Because of its diversity and extreme weather events it is expected that South East Europe region will be impacted by climate change m ...
Voir le projet

 9

 TERMINÉ 

BORDER ENVIRONMENTAL EDUCATION (ΔΙΑΠΕΡΕΚ)

Date du début: 31 déc. 2006, Date de fin: 30 déc. 2013,

Το προτεινόμενο έργο αναφέρεται σε περιοχές με πλούσιο φυσικό περιβάλλον, η προστασία και διαχείριση του οποίου διαμορφώνει σε μεγάλο βαθμό τις αναπτυξιακές προοπτικές τους. Τόσο στην περιοχή των Χανίων όσο και στην Κύπρο καταγράφονται έργα που υλοποιήθηκαν με σκοπό την προστασία και διαχείριση του περιβάλλοντος , ωστόσο εντοπίζονται σημαντικές ελλείψεις όχι μόνο σε επίπεδο υποδομών αλλά και σε ό, ...
Voir le projet

 3

 TERMINÉ 

GEO-Tourism and Local Development/ Mount Itanos-Mount Troodos (ΓΕΩΤΟΠΙΑ)

Date du début: 14 juin 2011, Date de fin: 13 nov. 2013,

Στόχο του έργου αποτελεί η συνεργασία μεταξύ δύο ορεινών, κατά βάση, περιοχών της Κρήτης και της Κύπρου που διακρίνονται για τον πλούτο γεωλογικών φαινομένων που διαθέτουν. Με το έργο αυτό επιδιώκεται η ανάπτυξη και τόνωση δύο ορεινών περιοχών που, σε μικρότερο ή μεγαλύτερο βαθμό, μαστίζονται από τις γνωστές (σε διεθνή κλίμακα) τάσεις εγκατάλειψης της ενδοχώρας που προκαλούν την απαξίωση περιβαλλ ...
Voir le projet

 5

 TERMINÉ 
Το έργο αφορά στη διακρατική συνεργασία για την αναβάθμιση της παρεχόμενης πληροφορίας & των τουριστικών υποδομών & υπηρεσιών σε περιπατητικές διαδρομές τριών νησιωτικών περιοχών (Κρήτης, Χίου & Κύπρου). Τόσο στην περίπτωση του Νομού Λασιθίου, όσο και στο Νομό Χίου και την Κύπρο, τα περιπατητικά μονοπάτια στα οποία προβλέπονται οι παρεμβάσεις αφορούν σε περιοχές με ιδιαίτερα περιβαλλοντικά & πολι ...
Voir le projet

 3

 TERMINÉ 
Transport security and accessibility are essential for a balanced and sustainable development of ASP. Due to current climatic trends, the vulnerability of transport infrastructure to natural hazards has increased. But the specific threats to transport infrastructure have not yet been tackled in a systematic joint effort. Therefore the goal of PARAmount is to improve risk management strategies for ...
Voir le projet

 13

 TERMINÉ 
With the expected Climate Change (CC), the ecological conditions for forests in the Alpine Space will be fundamentally changing – with unknown effects on the forests essential protective, ecological, economical and social functions. Under different climate and land-use change scenarios only an adaptive management can provide the conservation of the natural heritage and the multiple functions. MANF ...
Voir le projet

 15

 TERMINÉ 
Beyond its traditional functions, the Mediterranean forest areas are concerned with new uses, notably in periurban or protected contexts, such as biodiversity, soil and water conservation, carbon storage, leisure… This multitude of functions requires the implementation of new strategies of common actions and participative policies, which imply the different concerned stakeholders. The aim of QUALI ...
Voir le projet

 8

 TERMINÉ 
Background Forests cover about 30% of Europe, providing high value concerning: biodiversity; carbon sequestration; soil and water protection; and the economic contribution of goods and services. However, climate change, air pollution and changes in land use are threatening the health, stability and sustainability of forests and their values. On top of th ...
Voir le projet

 38

 TERMINÉ 
ManageMED is a project aiming to contribute to the sustainable development, protection and management of the protected ΝΑΤURA 2000 areas in the Eastern Mediterranean, which are threatened by a number of aggravating factors that can lead to the complete degradation or even extinction of these areas. The risk management will be based on a scientific model of risk indexes, which will result from the ...
Voir le projet

 11