Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Over 130,000 children born in Europe every year will have a congenital anomaly (CA; birth defect). These CAs, which are often rare diseases, are a major cause of infant mortality, childhood morbidity and long-term disability. EUROCAT is an established European network of population-based registries for the epidemiologic surveillance of CAs. EUROlinkCAT will use the EUROCAT infrastructure to suppor ...
Voir le projet

 25

 TERMINÉ 

Erasmus Mundus Masters in Journalism, Media and Globalisation

Date du début: 1 sept. 2016, Date de fin: 31 août 2021,

... Consortium: Aarhus University/Danish School of Media and Journalism (Denmark) (coordinator), University of Hamburg (Germany), University of Amsterdam (the Netherlands), City University London and Swansea University (UK), the University of California at Berkeley (USA), University of Technology Sydney (Australia) and Pontificia Universidad Católica de Chile.
Voir le projet

 9

 TERMINÉ 

Erasmus Mundus Joint Master Degree in Sports Ethics and Integrity

Date du début: 1 sept. 2016, Date de fin: 31 août 2021,

...re skills required to develop sports integrity. Semester 1 comprises advanced study of sports ethics, ethical theory, and sports policy, including anti doping, illegal gambling and match fixing at Swansea University. Semester 2 focuses on the experience of sport as a social practice in relation to athlete welfare, child protection and safegaurding, equality, integrity and fair play across able b ...
Voir le projet

 6

 TERMINÉ 

SustainAble Farming for Effective Aquaculture (SAFE-Aqua)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Aquaculture is an important food source for the world’s growing population. The increasing demand and productivity of aquaculture leads to global trade in breeding stock, genetic material and aquaculture products for human consumption, but also exacerbates the globalization of pathogens.SAFE-Aqua, an international inter- and multidisciplinary consortium, aims to provide scientific solutions to sol ...
Voir le projet

 3

 TERMINÉ 

Blood Biomarker-based Diagnostic Tools for Early Stage Alzheimer’s Disease (BBDiag)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Alzheimer’s disease (AD) affects more than 7 million people in Europe and this figure is expected to double every 20 years. Despite intensive efforts, no disease-modifying treatments or preventive strategies are available. The lack of specific, sensitive and minimally invasive diagnostics to identify people with early-stage AD to be included in clinical drug intervention trials is among the main r ...
Voir le projet

 13

 TERMINÉ 

Adaptive Management of Barriers in European Rivers (AMBER)

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

Rivers rank among some of the most threatened ecosystems in the world, and are the focus of costly restoration programmes that cost billions to taxpayers. Much of Europe depends on water from rivers for drinking, food production, and the generation of hydropower, which is essential for meeting the EU renewable energy target. Yet only half the EU surface waters have met the WFD’s 2015 target of goo ...
Voir le projet

 21

 TERMINÉ 
...kes the collective technical expertise and experience of working on thermo-mechanical fatigue (TMF) problems related to large aero-engines from three major centres of TMF research, namely Linköping, Swansea and Nottingham Universities in order to perform the activities of this topic. Together, the team will deliver significant technical innovations in following major topics to ensure world-leading ...
Voir le projet

 3

 TERMINÉ 
“AdMoRe: Empowered decision-making in simulation-based engineering: Advanced Model Reduction for real-time, inverse and optimization in industrial problems” aims at providing in-depth training of Early Stage Researches (ESRs) in the development and application of state-of-the-art computational models and numerical methods to solve cutting-edge engineering problems. The main driving factors of all ...
Voir le projet

 7

 TERMINÉ 

AQUAtic INVAders: Early Detection, Control and Management (AQUAINVAD-ED)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

Aquatic Invasive Species (AIS) are on the rise due to the synergistic effects of climate change and habitat destruction. The impacts of AIS on Biodiversity, human health, and loss of ecosystem services are well known, but their control and management has now become a worldwide priority. Successful management of AIS is challenging because it requires several steps in succession: (1) early detectio ...
Voir le projet

 7

 TERMINÉ 
"The primary goal of PREVIEW is to identify the most efficient lifestyle pattern for the prevention of type-2 diabetes in a population of pre-diabetic overweight or obese individuals. The project comprises two distinct lines of evidence, both embracing European and overseas countries:1) A multicentre, clinical randomized intervention trial with a total of 2,500 pre-diabetic participants, including ...
Voir le projet

 16

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
...ipant partners are reputed research centers in numerical methods applied to civil engineering with significant previous collaborations between them: two European centers: CIMNE in Spain and C2EC at Swansea University in UK; an American one, CIMAT in Mexico and a fourth and last partner in Asia, Tsinghua University (THU), what is widely regarded as the best university in China.
Voir le projet

 2

 TERMINÉ 

Correctness by Construction (CORCON)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"As software becomes ever more ubiquitous in our lives, the need to ensure it runs without error becomes ever more important. Restarting a phone is a simple, if inconvenient task; restarting an aeroplane in mid-flight is not an option!Correct by construction programming offers a revolutionary approach to program verification where programs can contain not just computations as is normal, but also ...
Voir le projet

 9

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

POLICY INNOVATION AND LEGITIMACY IN REGIONAL MULTI-LEVEL GOVERNANCE (MLGPIL)

Date du début: 7 sept. 2015, Date de fin: 6 sept. 2017,

Multi-level policy-making between EU, national and sub-national levels has become increasingly complex. This has created the need for innovative governance solutions to address this complexity, which in turn has had an effect on political legitimacy. This project aims to address this topic by developing the linkages between procedural innovation in governance and the legitimacy of these processes ...
Voir le projet

 1

 TERMINÉ 
Predator species are disproportionately vulnerable to human-caused extinction and their loss can trigger ecosystem altering trophic cascades. Elucidation of the consequences of predator biodiversity loss is therefore central to forecasting how ecosystems will respond to real-world losses of biodiversity. Experiments to date reveal a high degree of variability around effects of predator species los ...
Voir le projet

 1

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
Wildfires remove protective vegetation, leaving the landscapes vulnerable to catastrophic erosion, landslides and floods. The resulting losses and mitigation costs following wildfires have increased dramatically in the last 30 years due to (i) the population increase, (ii) the rise in fire severity and torrential rains associated with climatic change, and (iii) critical gaps in and limited transfe ...
Voir le projet

 1

 TERMINÉ 
The overarching goal of AMAZE is to rapidly produce large defect-free additively-manufactured (AM) metallic components up to 2 metres in size, ideally with close to zero waste, for use in the following high-tech sectors namely: aeronautics, space, automotive, nuclear fusion and tooling.Four pilot-scale industrial AM factories will be established and enhanced, thereby giving EU manufacturers and en ...
Voir le projet

 29

 TERMINÉ 

Virtual Prototyping of Tactile Displays (PROTOTOUCH)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

"It is estimated that touch screen module revenues will reach $23.9 billion by 2017. These user interfaces have become one of the most common input devices for digital media, e.g. in mobile phones and computers. Current devices incorporate relatively primitive vibrotactile haptic-feedback. The aim of PROTOTOUCH is to develop tactile displays with high fidelity haptic recognition, so that buttons w ...
Voir le projet

 10

 TERMINÉ 

Tephra constraints on rapid climatic events (TRACE)

Date du début: 1 sept. 2011, Date de fin: 28 févr. 2017,

Little has challenged our understanding of climate change more so than the abruptness with which large-scale shifts intemperatureoccurred during the last glacial period. Atmospheric temperature jumps of 8-16°C, occurring within decades over Greenland,were closelymatched by rapid changes in North Atlantic sea surface temperatures. Though these climatic instabilities arewell-documented in variouspro ...
Voir le projet

 1

 TERMINÉ 

Optimising translator training through collaborative technical translation

Date du début: 1 sept. 2014, Date de fin: 31 déc. 2016,

...lator training. The project will involve students and staff in advanced translation degree programmes from seven academic institutions (Rennes 2 University, France; HE Vinci, Brussels, Belgium; Swansea University, UK; Univerzita Karlova V Praze, Prague, Czech Republic; Universitatea Babes-Bolyai, Cluj-Napoca, Romania; Universita ta Malta, Malta; Universidad Pablo de Olavide, Sevilla, Spain). It wi ...
Voir le projet

 6

 TERMINÉ 
A national service in support of recipients of the H2020 sme instrument and for the enhancement of innovation management in SMEsInnovation is a vital ingredient of growth and an important element of the future success of the UK. With some 95% of R&D and innovation conducted outside of the UK and many major and lead market shaping companies being of non-UK origin, access to knowledge, markets, ski ...
Voir le projet

 22

 TERMINÉ 
Forests are one of Europe’s most important renewable resources and a key repository of biological biodiversity. Also, the forest sector is one of Europe’s most important economic sectors. In recent years, widespread forest mortality related to drought or temperature stress has been described in drought-prone forests throughout the world. Such mortality events can radically transform biodiversity, ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Marine Investment for the Blue Economy (MARIBE)

Date du début: 1 mars 2015, Date de fin: 31 août 2016,

MARIBE is a Horizon 2020 project that aims to unlock the potential of multi-use of space in the offshore economy (also referred to as Blue Economy). This forms part of the long-term Blue Growth (BG) strategy to support sustainable growth in the marine and maritime sectors as a whole; something which is at the heart of the Integrated Maritime Policy, the EU Innovation Union, and the Europe 2020 str ...
Voir le projet

 10

 TERMINÉ 

Open the Access to photonics life Science Infrastructure for SMEs (OASIS)

Date du début: 1 déc. 2013, Date de fin: 31 mai 2016,

The large scale research facilities and technology platforms are usually defined as a set of experimental instruments and components that are available mainly to academics and to a certain extent to industrials. The management of open access for researchers and world-class research programmes between these facilities is under consolidation through existing programmes like Instruct, EuroBioimaging. ...
Voir le projet

 10

 TERMINÉ 

Greater Operating Temperature Alloy (GOTA)

Date du début: 1 oct. 2012, Date de fin: 30 avr. 2016,

...gs; gravity cast and centrifugally cast samples; sheets, welding wire, and welded samples.• TIMET UK Ltd., [TIMET] will be the Principal Participant, and will lead the Management of the project.• Swansea University will lead the review of literature and prior industrial work. A candidate alloy (Ti+) will be selected based on this review, and on commercial and industrial factors.• TIMET will supply ...
Voir le projet

 4

 TERMINÉ 

COHERENT OPTICS SENSORS FOR MEDICAL APPLICATIONS (COSMA)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2016,

"The main objective of the project is to focus theoretical, experimental and clinical research of the participating groups on biomagnetism phenomena, with the specific aim to develop all-optical sensors dedicated to their detection and suitable for applications in clinical diagnostics.A central role in the project is played by Optical Atomic Magnetometers (OAMs) that have the potential, in terms o ...
Voir le projet

 6

 TERMINÉ 

Computable Analysis (COMPUTAL)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

The proposed programme focusses on logical and algorithmic aspects of processing infinite data. Through a network of institutes from three European and three Third countries, all of them among the leading groups in the relevant research, we aim at facilitating the interplay between the underlying branches of computable mathematics, i.e. computable analysis and topology, as well as exact real numbe ...
Voir le projet

 8

 TERMINÉ 

Innovative biological products for soil pest control (INBIOSOIL)

Date du début: 1 juil. 2012, Date de fin: 31 déc. 2015,

"INBIOSOIL is a timely project that proposes novel eco-efficient environmentally friendly technologies substantially contributing to the reduced input of conventional chemical pesticides for the control of subterranean crop pests of global economic importance. This would be accomplished through the generation of new formulations of biological control agents (BCAs) based on entomopathogenic fungi ...
Voir le projet

 15

 TERMINÉ 
"Morphing in aircrafts has been studied and used throughout recent time in order to increase their flight envelope. This characteristic is of the upmost importance in order to offer a greater efficiency, versatility and performance during the assigned mission. Moreover an aircraft with the capability to adapt itself to each given situation is prone to achieve positive results to a range of differe ...
Voir le projet

 9

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

The project funded staff and student mobility in Europe, and through it a total of 127 beneficiaries were supported (107 students and 20 staff). The funding allocated to Swansea University was for a total of 117 students and 23 staff. The difference between these numbers is down to unavoidable drop out of participants previously recruited (for example students who failed exams at Swansea were unab ...
Voir le projet

 1

 TERMINÉ 

Optimal Control Technologies in Quantum Information Processing (QUAINT)

Date du début: 1 août 2012, Date de fin: 31 juil. 2015,

We seek to bring together all major European and Israeli research centres in Optimal Control of Quantum Information Processing. This project will coordinate ongoing research activities, best practice dissemination, personnel training and public engagement as well as interaction with public stakeholders and policymakers for 17 established research groups from 15 universities in 6 countries – a tota ...
Voir le projet

 8

 TERMINÉ 

Energetic Algae (EnAlgae)

Date du début: 31 oct. 2009, Date de fin: 29 juin 2015,

Aim Energetic Algae aims to reduce CO2 emissions and dependency on unsustainable energy sources in NWE. by accelerating the development of sustainable technologies for algal biomass production. bioenergy and greenhouse gas (GHG) mitigation from pilot phase to application and marketable products. processes and services. This is achieved by bundling know-how. finance and political support. The plan ...
Voir le projet

 21

 TERMINÉ 

Multiscale Modelling of Hydrogen Embrittlement (MultiHy)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2015,

The proposed project aims to advance the state-of-the-art of numerical modelling of hydrogen embrittlement (HE). The primary focus and novelty of the project is the description of H transport in modern advanced materials with complex microstructures. This goal will be achieved through development of a multiscale modelling framework, which will enable the extraction and propagation of information p ...
Voir le projet

 12

 TERMINÉ 
The performance of engineering structures is continuously increasing, enabled by the accurate simulation and subsequent optimization of these systems. The ACARE Vision 2020 document set the ambitious goal of a 50% reduction in aircraft emissions that can only be achieved through a step change in aircraft technology. Adaptive structures and morphing aircraft are novel technologies that can provide ...
Voir le projet

 1

 TERMINÉ 

Creative Enterprises Network European Window (CINEW)

Date du début: 30 sept. 2013, Date de fin: 30 mars 2015,

...o access to technology and market places. Achievements: University of Swansea have proposals for development in the film and related industries sector, covering TV and film production, skills development, studio space, graphic design etc. They are incorporating many dri ...
Voir le projet

 7

 TERMINÉ 
A variety of complementary approaches are needed to evaluate safety of medicine use in pregnancy. To evaluate safety in relation to teratogenicity (capacity to cause malformations), population-based congenital anomaly registers, which are already networked across Europe (EUROCAT) with a common database, can provide a cost-effective mechanism which is as yet underexploited. The enormous population ...
Voir le projet

 10

 TERMINÉ 
"Fisheries landings of Nephrops novegicus (also known as Dublin Bay Prawn, Norway Lobster and Langoustine, among other names) are around 59,000 tons a year with a first sale value of close to €200 million.The NEPHROPS project is intended to bring together complementary information from survey, experimental and laboratory work. This combination of approaches is intended to create synergies and tran ...
Voir le projet

 15