Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

SAC robustness in the transition from meiosis to mitosis (SAC_EarlyEmbryo)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

...the fact that the first divisions of the embryo resembles meiosis in several aspects suggests that the mechanisms controlling chromosome segregation, most importantly the spindle assembly checkpoint (SAC), only become fully operational after the transition from meiosis to mitosis during early development. Despite the importance for early embryonic development, the sensitivity of mammalian embryos ...
Voir le projet

 1

 TERMINÉ 
...bbean regions (e.g. St Maarten, Martinique) where the results could be reproduced. Expected results: Ten West Indian manatees introduced and monitored in the natural environment of the Grand Cul-de-Sac Marin Bay, with normal wild behavior developing; Target users (100 fishermen, 10 tour operators, and 100 boatmen) informed and involved in the protection of the manatee and its natural environmen ...
Voir le projet

 1

 TERMINÉ 
...for all project sites and a fire prevention campaign run; Up to 6 km of fencing erected where necessary; A heightened public awareness of the importance of Ireland's 53 raised bog SACs and support from local communities for the urgent long-term conservation and restoration measures needed; Increased employment opportunities for rural communities; EU added value provided in demonstrating how to ...
Voir le projet

 1

 TERMINÉ 
Background The river Mulkear, part of the Lower Shannon Special Area of Conservation (SAC) Natura 2000 site, is important for Atlantic salmon (Salmo salar), European otter (Lutra lutra), sea lamprey (Petromyzon marinus) and other lamprey species. The conservation status of the SAC has come under pressure due to prolonged mismanagement of both the river it ...
Voir le projet

 3

 TERMINÉ 

Saç ve Makyaj Tasarımı Uygulamaları

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

We realized projects with our activity, our school has provided the apprentice students in Beauty an Hair Care department with applied education and on-the-job training . Thus, students was able to increase their theoretical and technical abilities, they was observe the materials, products and devices on-the - job training. With these experiences, they was able to employed more potentially wit ...
Voir le projet

 4

 TERMINÉ 
It is required to enable that the students in the field of beauty and hair care (Hairdressing, Skin Care and Beauty) could receive the required vocational trainings in the fields of Hairdressing, Skin Care and Beauty and could reinforce their trainings by “practical application” which is one of the ‘seeing on site’ and efficient learning methods; they could learn and apply the innovative methods u ...
Voir le projet

 5

 TERMINÉ 

Güzellik ve Saç Bakımında Avrupa Uygulamaları

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2016,

'' Beauty and Hair Care Practices in European Countries'' project is intended for 20 girls attending to 10 th and 11th grade classes of Beauty and Hair Care Services Department at Anamur Valide Sultan Vocational and Technical High School. There will be 1 vocational education teacher in charge of the branch courses of the department and 1 English language teacher responsible for the vocational for ...
Voir le projet

 3

 TERMINÉ 
Vocational education has important roles and responsibilities in order to meet the qualified technical personnel needed by the sectors. But vocational education in our country has important deficiencies and needs in this regard. The main deficiencies and needs of vocational education are the differences between the curriculum applied in the education institutions and the qualifications that are n ...
Voir le projet

 2

 TERMINÉ 
The project "Youth and decision makers dialogue to promote political participation in Lielvarde municipality "Come and start to speak!” necessity is to let young people to know what are their chances to participate in Lielvārde municipality, as well to involve decision makers (including local politicians) and young people in discussions, find opportunity for decision-makers to hear young people a ...
Voir le projet

 1

 TERMINÉ 
Background The River Allow catchment forms part of the Upper Blackwater River Special Area of Conservation (SAC). The site is important for a number of species including the kingfisher, freshwater pearl mussel, Atlantic salmon and European otter. The conservation status of the site has come increasingly under pressure and agricultural practices over recen ...
Voir le projet

 2

 TERMINÉ 
The zebrafish (ZF) is now a widely accepted vertebrate model for research in genetics, neuroscience and development due to its sheer experimental convenience and also its gene, developmental and functional homologies with mammals. ZF are also exploited as a novel model in nociceptive or pain research in a number of laboratories. We are already assessing behavioural and physiological responses in a ...
Voir le projet

 1

 TERMINÉ 
Background This project targeted the white-clawed crayfish (Austropotamobius pallipes) and was implemented over a wide area of the eastern side of the central Apennines. In the last decades the range of this species, which is present in several other European countries and is considered of community importance, has generally contracted. The species had be ...
Voir le projet

 7

 TERMINÉ 

Restoring active blanket bog of European importance in North Scotland (Blanket bog)

Date du début: 1 mars 2001, Date de fin: 31 déc. 2006,

...afforestation and drainage) and to a lesser extent by on-going management practices (for example, grazing and burning). The greatest threat came from forestry plantations that lay just outside the SAC/SPA boundaries. Action was urgently required if this particular damage was to be stopped. The next three to five years of the new decade presented the last opportunity to restore afforested peatla ...
Voir le projet

 5

 TERMINÉ 

Implementation of management measures at the Agras wetland (AGRAS WETLAND)

Date du début: 1 juil. 2003, Date de fin: 1 juil. 2007,

Background The Special Protection Area (SPA) of Agras lake is a semi-natural wetland that was created after certain construction works at the site of a former natural wetland (the marshes of Tiavou), undertaken by the Public Power Corporation (PPC) in the mid-1950s. The Agras wetland, which is situated 7 km north-west of Edessa, covers an area of 600 ha a ...
Voir le projet

 5

 TERMINÉ 
Background The project focused on the Berwyn and South Clwyd Mountains SAC and the Migneint-Arenig-Dduallt SAC, which are two of the most important SACs for blanket bog in the UK. Most of the former site and the entirety of the latter site are also designated as SPAs for their breeding upland bird populations. Some of the blanket bog within the project ...
Voir le projet

 3

 TERMINÉ 

Living Coasts - Living Seas

Date du début: 31 août 2005, Date de fin: 29 juin 2008,

...r with the local community in providing more information to the coastal community on the coastal habitats & species of Fingal, Meath & Wicklow and the marine habitats and species of Penllyn ar Sarnau SAC and explain how they impact on the designated sites and the coastal/marine environments in general.
Voir le projet

 2

 TERMINÉ 
...d water table lowered. Habitat changes were particularly acute in the Valley’s Middle Basin, where two Natura 2000 sites have been designated; the Ostoja Biebrzańska SPA and Dolina Biebrzy SAC. These sites contain six habitats listed in the Habitats Directive and also provide breeding territories for a number of rare and endangered bird species, including more than 20 species listed in the Ap ...
Voir le projet

 1

 TERMINÉ 

Sustainable Wetland Restoration in the New Forest (New Forest)

Date du début: 1 juil. 2002, Date de fin: 31 déc. 2006,

...agement Forum was established between the project partners, all of which are significant conservation organisations. This forum provides an important structure for conservation within the SAC. Its main output has been a 10-year wetland management plan for the SAC. 604 ha of woodland wetland habitat have been restored to recovering conditions as a result of the project. This area includes riverine ...
Voir le projet

 1

 TERMINÉ 
Background A European Commission working group on environment and health has been set up to develop and discuss new European guidelines for measuring ultrafine particles. Scientists assume that ultrafine particles have a large impact on the environment and human health (some 60 000 fatalities per year in Europe). To date, however, the social and environm ...
Voir le projet

 5

 TERMINÉ 

Habitat restoration in the Visbeekvalley (Life Visbeek)

Date du début: 1 janv. 2010, Date de fin: 30 sept. 2015,

...d pool frogs (Rana lessonae), both of which are listed in the annexes of the Habitat Directive. The Flemish region has designated the Visbeek as part of a larger special area for conservation (SAC). However, the habitats in the valley are under extreme pressure, mostly from the threat of habitat fragmentation, as well as afforestation, eutrophication, intensification of agriculture and disturbanc ...
Voir le projet

 1

 TERMINÉ 

Habitat restoration in the Abeekvalley (Life Abeek)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2015,

...h as Luscinia svecica, Alcedo atthis, Botaurus stellaris, Lxobrychus minutus, Porzana porzana, Lanius collurio, Lullula arborea, and Pelobates fuscus. The project area has been designated as an SAC by the government, but several habitats are under severe pressure and some species are on the verge of extinction because of habitat fragmentation, inadequate management, afforestation, intensive farmin ...
Voir le projet

 1

 TERMINÉ 

Upper Main valley (Obermain)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2015,

...s, fish, molluscs and mammals bolster biodiversity in the Upper Main valley. The combination of this rich species mix and the valley’s semi-natural floodplain habitat features contribute to SAC and SPA designations in the Upper Main area, which is also a popular destination for river recreation among local communities and tourists. Balancing the needs of nature conservation with social and eco ...
Voir le projet

 5

 TERMINÉ 

Irfon Special Area of Conservation Project (ISAC 08)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

...dressing them at the catchment level that real improvements in water and habitat quality can be achieved. Objectives The ISAC 08 project built on the work of previous river restoration projects, such as Natura 2000 Rivers (LIFE99 NAT/UK/006088), to address the restoration of the Irfon catchment in mid-Wales. The projectâ ...
Voir le projet

 3

 TERMINÉ 

MoorLIFE: Active blanket bog restoration in the South Pennine Moors (MoorLIFE)

Date du début: 1 avr. 2010, Date de fin: 31 août 2015,

Background The South Pennine Moors are a special area of conservation (SAC) included in the Natura 2000 network. This site is important for active blanket bog and represents the most south-easterly occurrence of the habitat in Europe. It also forms part of two SPAs (Special Protection Areas according to the Birds Directive) whose Annex 1 species, includin ...
Voir le projet

 1

 TERMINÉ 

The microeconomics of growth across regions in Europe (EUMICRO)

Date du début: 9 janv. 2008, Date de fin: 8 janv. 2010,

This project is going to enrich the empirics of regional convergence across Europe (Corrado et al 2005; Canova, 2004) which has mainly focussed on country or regional (NUTS2) aggregate growth performance. A new dataset at a smaller geographical scale (NUTS3) for 1031 European regions has been released in September 2005. This is a key element to test for the determinants of growth at the micro-leve ...
Voir le projet

 1

 TERMINÉ 
Background The coastal heaths and coppiced woodland near Cuxhaven are unique in Germany. This area by the North Sea is designated as a Natura 2000 site and borders a marine protected area, the National Park Niedersächsisches Wattenmeer. It is characterised by a mosaic of habitat types, such as dry heaths, sandy dunes, oak woodlands, raised mires and olig ...
Voir le projet

 3

 TERMINÉ 

Kinnekulle plateau mountain - restoration and conservation (Kinnekulle)

Date du début: 1 nov. 2001, Date de fin: 30 sept. 2007,

...iven logistical support to encourage them to enter these schemes. These core measures will be accompanied by the preparation of new and updated conservation plan for the management of the SAC, and a public awareness campaign to highlight the area’s unique natural heritage. The campaign will aim at heightening knowledge and understanding of the nature conservation values and Natura 2000 among t ...
Voir le projet

 4

 TERMINÉ 

Restoration of wetlands in dune habitats (REWETDUNE-LIFE)

Date du début: 1 août 2014, Date de fin: 31 juil. 2019,

...evel, in order to significantly improve the conservation status of the wet and dune habitats 2130*, 2140*, and 2190 on the two northernmost Natura 2000 sites in Denmark (the terrestrial part of SAC: DK00FX112 and SAC/SPA: DK00FX005). It also aims to create favourable conditions for the species, Botaurus stellaris and Tringa glareola. Expected results: Using best practice techniques, the followin ...
Voir le projet

 2

 TERMINÉ 

Bringing the Bure back to LIFE: Hoveton Wetland Restoration Project (Bure LIFE)

Date du début: 1 sept. 2015, Date de fin: 30 nov. 2020,

...e eroded river banks; Monitor the recovery process and disseminate best practice guidance associated with the restoration techniques to managers of similar habitats both within the SAC and elsewhere in the UK and the rest of Europe; and Raise awareness of anthropogenic impacts, improve physical and intellectual access and increase appreciation of biodiversity amongst local communities, visitors, ...
Voir le projet

 2

 TERMINÉ 

Carpel evolution: a walk in the rice side (RiceStyle)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Flowering plants (angiosperms) protect their female reproductive structure, the ovule, within a carpel. After the embryo sac in fertilized by the pollen tube, the ovule gradually turns into a seed, and the carpel becomes a fruit. The carpel is thus an evolutionary conserved structure, but showing an outstanding variability in shapes and function. Several transcription factors directing the main as ...
Voir le projet

 1

 TERMINÉ 
"The spindle assembly checkpoint (SAC) inhibits chromosome segregation and mitotic exit prior to biorientation of all chromosomes on the mitotic spindle by restraining the activity of the anaphase promoting complex or cyclosome (APC/C) towards Cyclin B1 and Securin. In contrast, other APC/C substrates like Cyclin A2 bypass this inhibition and are degraded in the presence of an active SAC. Despite ...
Voir le projet

 1

 TERMINÉ 
...riturus cristatus); Improve breeding and foraging conditions for the moor frog (Rana arvalis), in order to increase the number of breeding active adults by 50%; and Maintain the eastern part of the SAC Øvre Mølleådal, Furesø og Frederiksdal Skov as one of the best breeding sites in Denmark for the water beetle (Graphoerus bilineatus) and the dragonfly large white-faced darter (Leucorrhinia p ...
Voir le projet

 7

 TERMINÉ 
... have not been well characterized. Most hematopoietic cells renew from hematopoietic stem cells (HSC), however recent evidence has shown that tissue ‘resident’ macrophages are generated from yolk sac progenitors, expand and differentiate within developing seeded tissues, and self-maintain in adults independently of HSC. In contrast to HSC-derived macrophages, resident macrophages proliferate local ...
Voir le projet

 1

 TERMINÉ 

Development of a readout circuit for a resonant accelerometer (RESACC)

Date du début: 1 janv. 2013, Date de fin: 31 mars 2015,

"The purpose of the present project is to develop an ASIC implementing a readout interface for a resonant accelerometer. It is developed in response to the requirements described in the Clean Sky call for proposals referenced under CS-2012-01-SFWA-01-046 and the specifications the topic manager will provide at the beginning of the project. Resonant accelerometers offer the advantage over capacitiv ...
Voir le projet

 2

 TERMINÉ 

Spatiotemporal regulation of chromosome segregation fidelity (PRECISE)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2015,

.... Inaccuracy of mitosis leads directly to aneuploidy (gain or loss of chromosomes), a hallmark of several cancers and birth defects. Mitotic fidelity is controlled by the spindle assembly checkpoint (SAC), a signaling pathway that delays the progression of mitosis to ensure that all chromosomes are attached to mitotic spindle microtubules (MTs). Central to this activity, the kinetochore (KT), a mi ...
Voir le projet

 1

 TERMINÉ 

Information Service on Agricultural Change (ISAC)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2013,

"Agricultural resources are in high demand to sustain the world’s growing population. In Europe, agriculture is regulated and monitored through the CAP and agricultural insurances are increasing in importance as an instrument for risk management. In the developing world droughts and other natural disasters impact vulnerable populations and lead to famines and starvation. The EC development policy ...
Voir le projet

 5

 TERMINÉ 

Technologies for Safe and Controlled Martian Entry (SACOMAR)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2012,

"The main objective of the study is the experimental and numerical study of gas surface interaction phenomena in the high enthalpy flow field behind the bow shock in front of a model at Martian entry flow conditions. The improvement of physical modelling using experimental data and its implementation into the CFD codes is essential to understand and interpret the physical processes. At the end the ...
Voir le projet

 8

 TERMINÉ 
...ural Tilio-acerion woodland of the British Isles includes mosaics of woodland habitats associated with steep-sided limestone valleys. The project focused on two such sites, the Wye Valley Woodlands cSAC along the border of England and Wales and the Peak District Dales cSAC in northern England, due to their size and complex conservation requirements. These woodlands suffer from a range of threats ...
Voir le projet

 9

 TERMINÉ 

River Avon cSAC: demonstrating strategic restoration and management (STREAM)

Date du début: 1 août 2005, Date de fin: 30 sept. 2009,

...f local, national and EU audiences, working with the UKRRC and Living River; Producing best practice guidance on sluice operation, distributed to relevant landowners and operators in the SAC; Publishing ditch management and fish (including Atlantic salmon) exclusion measures and dissemination to relevant landowners in the SPA; and Improving stakeholder and public appreciation of the sites and s ...
Voir le projet

 4

 TERMINÉ 

Studying Plant Cell Secretion and Membrane Trafficking (CELLSEC)

Date du début: 3 nov. 2008, Date de fin: 2 nov. 2010,

...proposal aims to evaluate how signaling pathways previously identified modulate membrane trafficking and microfilament architecture connecting structure and function. The grant focuses on the role of SAC and syntaxin proteins in polar growing cells. Mutation of SAC1, an Arabidopsis SAC Domain Phosphoinositide Phosphatase, causes alterations in cell morphogenesis and actin organization. We have sel ...
Voir le projet

 2