Rechercher des projets européens

23 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Cross-Layer Early Reliability Evaluation for the Computing cOntinuum (CLERECO)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Advanced multi-functional computing systems realized in forthcoming manufacturing technologies hold the promise of a significant increase in device integration density complemented by an increase in system performance and functionality. However, a dramatic reduction in single device quality and reliability is also expected.CLERECO research project recognizes early accurate reliability evaluation a ...
Voir le projet

 11

 TERMINÉ 
The mid-infrared (MIR) region is emerging as the favourite wavelength band for a number of applications, including high sensitivity trace detection, chemical emission monitoring, process control, and biological sensing applications. An efficient way to get precise and reliable information is to rely on spectroscopic analysis and, among the existing technologies, Tunable Diode Laser Spectroscopy (T ...
Voir le projet

 18

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Future media Internet for large scale CONTENT experimentation 2 (FI-CONTENT 2)

Date du début: 1 avr. 2013, Date de fin: 31 oct. 2015,

The FI-CONTENT 2 project aims at establishing the foundation of a European infrastructure for promoting and testing novel uses of audio-visual content on connected devices. The partners will develop and deploy advanced platforms for Social Connected TV, Mobile Smart City services, and Gaming/ Virtual worlds. To assess the approach and improve these platforms, user communities in 6 European locatio ...
Voir le projet

 31

 TERMINÉ 
There is a continued need for higher compute performance: scientific grand challenges, engineering, geophysics, bioinformatics, etc. However, energy is increasingly becoming one of the most expensive resources and the dominant cost item for running a large supercomputing facility. In fact the total energy cost of a few years of operation can almost equal the cost of the hardware infrastructure. En ...
Voir le projet

 14

 TERMINÉ 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Voir le projet

 51

 TERMINÉ 

ROBOT FLEETS FOR HIGHLY EFFECTIVE AGRICULTURE AND FORESTRY MANAGEMENT (RHEA)

Date du début: 1 août 2010, Date de fin: 31 juil. 2014,

In the last two decades, a precise management of agricultural land has been made possible due to the availability of new technologies, including global positioning systems (GPS), geographic information systems (GIS), sensors, automation of agricultural machinery, and high resolution image sensing. As a result, the concept of Precision Agriculture has emerged as the management strategy that uses in ...
Voir le projet

 15

 TERMINÉ 

Development of Helicopter EXhaust Engine NOise Reduction technologies (HEXENOR)

Date du début: 1 févr. 2012, Date de fin: 31 juil. 2014,

"The HEXENOR proposal aims to study, design and manufacture three items ( short, mean, and long) each made of two innovative concepts, a quiet plug and a quiet diffuser which will be mounted on a turboshaft engine to reduce the noise radiated by the exhaust. A preliminary study is concerned with the capability of two materials a Ferritic stainless steel (low cost material) and TiAl alloy (light bu ...
Voir le projet

 5

 TERMINÉ 
Description Development of future individualized cancer diagnosis and treatment follow-up devices, through surface plasmon early detection of circulating heat shock proteins and tumor cellsCancer has become the leading cause of death in the world and costs more in productivity and lost life than any other illness, according to the America ...
Voir le projet

 6

 TERMINÉ 

HIRF Synthetic Environment (HIRF SE)

Date du début: 1 déc. 2008, Date de fin: 31 mai 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Voir le projet

 45

 TERMINÉ 
The aim of this project is to achieve an improved knowledge of the terrestrial carbon cycle in response to climate variability and extremes, to represent and apply this knowledge over Europe with predictive terrestrial carbon cycle modelling, to interpret the model predictions in terms of vulnerability of the terrestrial – in particular soil – carbon pools and give according advice to EU climate a ...
Voir le projet

 26

 TERMINÉ 
"The consortium behind AGROBIOFILM project – a group of European SME suppliers and users of agricultural plastics – wishes to address a major market opportunity through the development and performance demonstration of mulch films that would be able to fulfill the three main following requirements: to be more environmentally friendly (i.e; biodegradable in soil without containing a high content in ...
Voir le projet

 10

 TERMINÉ 

Saving Energy in Social Housing with ICT (eSESH)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

To substantially reduce peak and overall demand for energy across EU social housing, the project will develop innovative energy awareness and management services EAS and EMS.The objective of the project is to enable sustained reductions in energy consumption across European social housing by providing usable ICT-based energy management and awareness services directly to tenants, by providing effec ...
Voir le projet

 33

 TERMINÉ 
"The electric ship concept offers many benefits; among other aspects if offers flexibility of control and effectiveness of power transmission. But predominantly it enables higher energy conversion efficiency by ensuring that prime movers are effectively loaded at all times and across all operating conditions. This dominating advantage cannot be matched by mechanical transmission systems because ge ...
Voir le projet

 34

 TERMINÉ 

Future High-Altitude High-Speed Transport 20XX (FAST20XX)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2012,

"The current project aims at the investigation and development of technologies and steps necessary for approaches to conquer the grey zone between aeronautics and space in Europe, and thus to set the foundation of a new paradigm for transportation in the long term. The underlying concepts considered are a) a European space plane based on an airplane launch approach to advance European know how in ...
Voir le projet

 17

 TERMINÉ 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Voir le projet

 59

 TERMINÉ 

Broadband Evolved FEMTO Networks (BeFEMTO)

Date du début: 1 janv. 2010, Date de fin: 31 juil. 2012,

BeFEMTO is a timely proposal to address broadband communications, an important stimulus to the European economy. It aims to research and develop evolved femtocell technologies that accelerate cost-effective provision of ubiquitous broadband services by smoother convergence between fixed and wireless broadband.The approach adopted is pragmatic in two ways: near-term solutions as enabler for early d ...
Voir le projet

 14

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 

ERA-NET TRANSPORT II (ENT II)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2012,

"ERA-NET TRANSPORT II (ENT II) brings together the owners of national transport re-search programmes from thirteen countries, representing an annual public funding volume in the access of € 300 Mio in total. The vision behind ENT is to supplement and enrich na-tional RTD programmes through trans-national cooperation where national programme representatives can see an added value. Since 2003 the EN ...
Voir le projet

 17

 TERMINÉ 

African-European Georesources Observation System (AEGOS)

Date du début: 1 déc. 2008, Date de fin: 30 nov. 2011,

Africa, the largest single component of the African Caribbean Pacific (ACP) Group of States, despite its huge potential for development through both human and georesources, suffers in many places from poverty and underdevelopment. The sustainable use of its resources is a key issue, not only for development of the African countries, but also for the world’s future. Over the coming decades, these i ...
Voir le projet

 23

 TERMINÉ 

Oral Off-patent Oncology Drugs for Kids (03K)

Date du début: 1 sept. 2008, Date de fin: 31 août 2011,

"There is an urgent need for appropriate oral formulations of anticancer drugs for the treatment of paediatric malignancies in children. The goal of the O3K consortium is to develop oral liquid formulations of Cyclophosphamide and Temozolomide, important chemotherapeutics which have been identified in the list of paediatric needs by EMEA (EMEA/197972/2007). Both off-patent drugs are widely used or ...
Voir le projet

 9

 TERMINÉ 
A strong and efficient Network of National Contacts Points (NCP) is not only elementary to the success of the Seventh EU Framework Programme but also to the realization of the European Research Area. The trans-national project “NET4SOCIETY” will strive to achieve this declared goal. For its proposed duration of three years, “NET4SOCIETY” will support the creation and establishment of a functional ...
Voir le projet

 39

 TERMINÉ 
Design and verification of modern embedded platforms are two highly related problems which are still mainly addressed by using unrelated methodologies. This effectively reduces development productivity and complicates achieving predictable system properties.The COCONUT project thus focuses on the definition of a formal framework based on a tight integration of design and verification through all r ...
Voir le projet

 10