Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
VOLATILE aims in the development of an innovative Volatile Fatty Acids Platform for the bioconversion of municipal solid bio-waste fraction and sludgy biowaste from other industries. The platform will be integrated in anaerobic digestion. The volatile fatty acids will be recovered continuously using sophisticated membrane technology and will be provided as feedstock / carbon source for value added ...
Voir le projet

 21

 TERMINÉ 

PLATInum group metals Recovery Using Secondary raw materials (PLATIRUS)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2020,

The PLATIRUS project aims at reducing the European deficit of Platinum Group Metals (PGMs), by upscaling to industrial relevant levels a novel cost-efficient and miniaturised PGMs recovery and raw material production process. The targeted secondary raw materials will be autocatalysts, electronic waste (WEEE) and tailings and slags from nickel and copper smelters, opening-up an important range of a ...
Voir le projet

 12

 TERMINÉ 

STORY- Added value of STORage in distribution sYstems (STORY)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2020,

The main objective of STORY is to show the added value storage can bring for a flexible, secure and sustainable energy system. This will be achieved by showing the inter-relations between technologies and stakeholders as well as the potential and impact of policy and regulation.The future European grid has to serve a diverse and mixed landscape of users in a situation of mixed rules and responsibi ...
Voir le projet

 18

 TERMINÉ 

Metal Recovery from Low Grade Ores and Wastes Plus (METGROW PLUS)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2020,

METGROW+ will address and solve bottlenecks in the European raw materials supply by developing innovative metallurgical technologies for unlocking the use of potential domestic raw materials. The METGROW+ consortium has received an EIP RM Commitment status. The consortium is supported by internationally respected research institutes and universities. Many of the partners (9) are members of EIT KIC ...
Voir le projet

 20

 TERMINÉ 

Sustainable CellulAr networks harVEstiNG ambient Energy (SCAVENGE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2020,

Energy sustainability is key to future mobile networks due to their foreseen capacity upsurge. The objective of the ETN SCAVENGE (Sustainable CellulAr networks harVEstiNG ambient Energy) is to create a training network for early-stage researchers (ESRs) who will contribute to the design and implementation of eco-friendly and sustainable next-generation (5G) networks and become leaders in the relat ...
Voir le projet

 9

 TERMINÉ 

MEthane activation via integrated MEmbrane REactors (MEMERE)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

The key objective of the MEMERE project is the design, scale-up and validation of a novel membrane reactor for the direct conversion of methane into C2H4 with integrated air separation. The focus of the project will be on the air separation through novel MIEC membranes integrated within a reactor operated at high temperature for OCM allowing integration of different process steps in a single multi ...
Voir le projet

 11

 TERMINÉ 
Public bodies face the lack of appropriate easy-to-use tools to support them in the definition, simulation and evaluation of suitable strategies for sustainable heating and cooling tailored to local conditions for achieving the ambitious targets set-up in their local plans. In light of this, PLANHEAT main objective is to develop and demonstrate an integrated and easy-to-use tool which will support ...
Voir le projet

 13

 TERMINÉ 
The aims of BAMB (Buildings as Material Banks) are the prevention of construction and demolition waste, the reduction of virgin resource consumption and the development towards a circular economy through industrial symbiosis, addressing the challenges mentioned in the Work Programme on Climate action, environment, resource efficiency and raw materials. The focus of the project is on building const ...
Voir le projet

 16

 TERMINÉ 

effective Container inspection at BORDer control points (C-BORD)

Date du début: 1 juin 2015, Date de fin: 30 nov. 2018,

Efficient NII (non-intrusive inspection) of containerised freight is critical to trade and society. Freight containers are potential means for smuggling (e.g. tobacco), illegal immigration, trafficking of drugs, mis-declared goods and dangerous illicit substances, including explosives, nuclear material, chemical and biological warfare agents and radioactively contaminated goods. One inspection NII ...
Voir le projet

 19

 TERMINÉ 
"SOLUTIONS will deliver a conceptual framework for the evidence-based development of environmental and water policies. This will integrate innovative chemical and effect-based monitoring tools with a full set of exposure, effect and risk models and assessment options. Uniquely, SOLUTIONS taps (i) expertise of leading European scientists of major FP6/FP7 projects on chemicals in the water cycle, (i ...
Voir le projet

 41

 TERMINÉ 

EUBET

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Bromangymnasiet in Hudiksvall is situated in a region of very high unemployment, among the young it is the highest percentage in the country (25 %). Our school has the task and mission to develop an intercultural teaching practice supported by inclusive, innovative methods and entrepreneurship to achieve a more entrepreneurial learning for the benefits of our students. For some years now, we have ...
Voir le projet

 62

 TERMINÉ 

Beyond Retirement - A Migrant Integration Resource

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

The BRAMIR Project proposes the development and implementation of a multi-layered andragogic framework designed for a seniors target group comprising older workers approaching retirement and recent retirees. This framework will incorporate a bespoke train-the-trainer curriculum, a suite of psychographic profiling tools and a digital toolbox of appropriate teaching resources to enable the redeploym ...
Voir le projet

 9

 TERMINÉ 
Improvements of the overall sustainability of process industries from an economic, environmental and social point of view require the adoption of a new industrial symbiosis paradigm - the human-mimetic symbiosis - where critical resources (materials, energy, waste and by-products) are coordinated among multiple autonomous Production Units organized in industrial clusters.SYMBIOPTIMA will improve E ...
Voir le projet

 15

 TERMINÉ 

Enhancing ecoSysteM sERvices mApping for poLicy and Decision mAking (ESMERALDA)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2018,

Mapping and assessment of ecosystems and their services (ES) are core to the EU Biodiversity (BD) Strategy. They are essential if we are to make informed decisions. Action 5 sets the requirement for an EU-wide knowledge base designed to be: a primary data source for developing Europe’s green infrastructure; resource to identify areas for ecosystem restoration; and, a baseline against which the goa ...
Voir le projet

 25

 TERMINÉ 
With anticipated exponential growth of connected devices, future networks require an open solutions architecture facilitated by standards and a strong ecosystem. Such devices need an easy interface to the connected network to request the kind of communication service characterized by guarantees about bandwidth, delay, jitter, packet loss or redundancy. In response, the network should grant the req ...
Voir le projet

 9

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Concerted Action EPBD IV (CAIV_EPBD)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The 'Concerted Action EPBD IV', supporting transposition and implementation of Directive 2010/31/EC of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings, is an activity which aims to foster exchange of information and experience among Member States and participating countries with regards to the implementation of the specific Community legislation and ...
Voir le projet

 29

 TERMINÉ 

Do Cardiac Health: Advanced New Generation Ecosystem (Do CHANGE)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

The primary objective of Do CHANGE is to develop a health ecosystem for integrated disease management of citizens with high blood pressure and patients with ischemic heart disease or heart failure. The system will give them access to a set of personalized health services in a near real-time fashion. This disruptive system will incorporate behavior change methods, such as “Do Something Different”, ...
Voir le projet

 12

 TERMINÉ 

Ubiquitous iNteroperable Care for Ageing People (UNCAP)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The lack of ICT platforms based on open standards is regarded as one of the most significant market barriers to the creation of new care & assistance paradigms with global interconnection and interworking. UNCAP delivers an interoperable platform based on open industrial standards that leverages on existing technologies for biosensing, indoor/outdoor localisation and home-automation. The result is ...
Voir le projet

 23

 TERMINÉ 
"GREEN SURGE will identify, develop and test ways of connecting green spaces, biodiversity, people and the green economy, in order to meet the major urban challenges related to land use conflicts, climate change adaptation, demographic changes, and human health and wellbeing. It will provide a sound evidence base for green infrastructure planning and implementation, exploring the innovation potent ...
Voir le projet

 28

 TERMINÉ 
Indoor Air Quality and emissions from building materials have been over the last decades a major challenge for scientists, industry and consumers. Traditional construction materials contribute to contaminants such as VOCs, formaldehyde, particulates and fibres. However, new eco-innovative building materials are able to provide a healthier indoor environment both by substituting source of contamina ...
Voir le projet

 22

 TERMINÉ 

BeTheCuRE (BTCURE)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2017,

BTCure is based on the recognition that RA is a heterogeneous disease where a major subset involves adaptive immunity, and that animal models have to develop the line with the different subsets of the human diseases in order to be optimally used for drug discovery and drug evaluation. Our aim is to develop an understanding of the early process in human arthritis subsets and the animal models that ...
Voir le projet

 41

 TERMINÉ 
Sarcomas are rare malignant tumors, with an overall incidence of 6/105/year. Bone and soft tissue connective tissue tumours encompass more than 50 different rare histotypes and more than 150 different molecular subtypes. The incidence of individual rare sarcomas subtypes is often less than 0.5/105/year. Given sarcoma rarity as a group, but even more as individual entities, few prospective clinical ...
Voir le projet

 22

 TERMINÉ 

Semiconductor Equipment Assessment for Key Enabling Technologies (SEA4KET)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Voir le projet

 26

 TERMINÉ 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Voir le projet

 13

 TERMINÉ 
"The main objective of the BACCHUS project is to develop tools and resources that will facilitate the generation of robust and exploitable scientific evidence that can be used to support claims of a cause and effect relationship between consumption of bioactive peptides and polyphenols, and beneficial physiological effects related to cardiovascular health in humans. To achieve this, the BACCHUS c ...
Voir le projet

 28

 TERMINÉ 

Boys Reading

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

Engaged readers have a much greater chance of staying in school, expanding career and life options, and maturing into self-actualized adults” (Brozo, 2010). The BoysLit project aims to make reading an integral part in the life of boys aged 10-15, who are currently unenthusiastic about books. BoysReading asserts that this can only be achieved if teenage boys acquire control over their reading and c ...
Voir le projet

 8

 TERMINÉ 
Growing investments in distributed energy resources (DER) – renewable distributed energy generation combined with demand response, energy storage, plug-in electric vehicles and active management of distribution networks – will require new business and technology platforms to manage the increased level of diversity and complexity of global energy management. The increasing variability of both gener ...
Voir le projet

 14

 TERMINÉ 

More Medicines for Tuberculosis (MM4TB)

Date du début: 1 févr. 2011, Date de fin: 31 juil. 2016,

The More Medicines for Tuberculosis (MM4TB) consortium evolved from the highly successful FP6 project, New Medicines for TB (NM4TB), that delivered a candidate drug for clinical development two years ahead of schedule. Building on these firm foundations and exploiting its proprietary pharmacophores, MM4TB will continue to develop new drugs for TB treatment. An integrated approach will be impleme ...
Voir le projet

 27

 TERMINÉ 
Water4Crops provides a combination of technical improvements in the field of bio-treatment and agricultural water use within a transdisciplinary identification of novel agri-business opportunities. Water4Crops aims at: a) developing innovative biotechnological wastewater treatments for improved water recycling, b) initiating the co-creation of alternative combinations of bio-treatment, recycling o ...
Voir le projet

 25

 TERMINÉ 

MOBILITY LA SALLE VIRGEN DEL MAR ALMERÍA

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

Given the actual situation of high unemployment in Spain, especially among young people under 25, one of our main responsibilities as educators is to apply measures that allows us to implement new opportunities for employment, while the structural reforms that have been carried out start giving results. Not so long ago, our students considered as a novelty the search for new challenges. Nowadays ...
Voir le projet

 12

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
Gait parameters monitoring and energetic expenditure (EE) calculation is of high importance for patients recovering from diseases that affect movement (e.g. stroke). The same applies to professional athletes either in the phase of recovery from a lower limb injury or performing a sport requiring precise body posture and movement control. Currently, gait parameters’ monitoring is made either using ...
Voir le projet

 10

 TERMINÉ 
BioConSepT aims to demonstrate the technically feasibility of White Biotech processes for the conversion of 2nd generation biomass into platform chemicals, which are 30% cheaper and 30% more sustainable than existing chemical routes or 1st generation processes. BioConSepT uses lignocellulose and non-edible oils & fats as cheap, abundantly available feedstocks, which cannot be used as food. The ma ...
Voir le projet

 38

 TERMINÉ 

Additive Manufacturing for Wear and Corrosion Applications (AMCOR)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

AMCOR will develop and demonstrate Laser Metal Deposition (LMD) industrial manufacturing systems for the deposition of functional graded coatings (FGM) and 3D features onto metallic components supplied by industry that are subjected to in-service wear and corrosion. This will be supported by the development, production and testing of mixed powder combinations for coatings suitability.The proposed ...
Voir le projet

 16

 TERMINÉ 

Aero-Thermodynamic Loads on Lightweight Advanced Structures II (ATLLAS II)

Date du début: 1 mai 2011, Date de fin: 31 oct. 2015,

ATLLAS II is a logical follow-up of a recently finalized FP6 project which has as objectives the identification and assessment of advanced light-weight and high-temperature resistant materials for high-speed vehicles up to Mach 6.The material requirements are first defined through an in-depth feasibility study of a Mach 5-6 vehicle. The consortium has now this capability at hand as they can rely o ...
Voir le projet

 16

 TERMINÉ 

Biohybrid templates for peripheral nerve regeneration (Biohybrid)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

The BIOHYBRID consortium was build up with the overall aim to develop, in a preclinical perspective, an innovative biohybrid artificial nerve device for the regenerative treatment of traumatic injuries of peripheral nerves. This consortium consists of three active and well integrated SMEs as well as seven academic partners that are recognised leaders in the scientific areas of interest for this pr ...
Voir le projet

 10

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68