Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...hone technology and digital payment systems has created an enormous opportunity to disrupt the meal voucher market. Paybon GmbH, an Austrian-based ICT SME, is exploiting these trends by launching a fully-automated smartphone-based voucher system that boost efficiencies, reduces costs, and creates positive social and environmental impacts. Vouchers can be simply generated by employers and distribut ...
Voir le projet

 1

 TERMINÉ 
TILOS aims to demonstrate the optimal integration of local scale energy storage in a fully-operated, smart island microgrid that will also communicate with a main electricity grid. The main objective of the project will be the development and operation of a prototype battery storage system, based on NaNiCl2 batteries, provided with an optimum, real-environment smart grid control system and coping ...
Voir le projet

 17

 TERMINÉ 
...on of the transport services delivered by the platform;- Identify transport open data sources of information and harmonizing this data to be used as real-time information;- Define and implement and fully distributed global architecture to enable cooperative sensing in ITS;- Leverage the information gathered from vehicular communications, GNSS and open data by means of artificial intelligence techn ...
Voir le projet

 11

 TERMINÉ 

Stack design for a Megawatt scale PEM electrolyser (MEGASTACK)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

"Water electrolysis based on PEM technology has demonstrated its applicability to produce hydrogen and oxygen in a clean and safe way on site and on demand. Systems have been demonstrated in a wide range of niche applications with capacities from
Voir le projet

 4

 TERMINÉ 
...ailers and ESCOs).The project aims to develop, deploy and demonstrate innovative solutions (grid systems, functions, services and tools) for advanced Operation and Exploitation of LV/MV networks in a fully smart grid environment improving the capacity of that networks as enablers for Distributed Generation, ADM, Customer empowering and business opportunities.The project proposes 4 real pilots in P ...
Voir le projet

 20

 TERMINÉ 

Improving Performance and Cost of Content Delivery in a Hyperconnected World (CDN-H)

Date du début: 1 août 2014, Date de fin: 31 juil. 2017,

...very. Today, CDNs are responsible for almost half of Internet traffic. Operation at that scale poses challenges for CDNs as they have to dynamically map end-users to appropriate servers without being fully aware of the network conditions within an Internet Service Provider (ISP) or the end-user location. CDNs also try to minimize their operation cost. Moreover, ISPs struggle to cope with rapid tra ...
Voir le projet

 1

 TERMINÉ 

FERROHUB

Date du début: 1 mai 2015, Date de fin: 31 août 2015,

...ion of transport in general, which calls for safe and quick vehicle charging.Ferroamp Elektronik (Sweden) is proposing the FerroHub, an innovative electronic hub leveraging several patents, which fully supports smart grids. The solution incorporates a PV inverter, energy storage and the necessary hardware and software to handle power flow to and from the network, as well as other innovative techno ...
Voir le projet

 3

 TERMINÉ 

STREAMLINE

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

...d “data in motion” in a single system and is compatible with the Hadoop ecosystem.3. Develop fast reactive machine learning technologies based on distributed parameter servers and fully distributed asynchronous and approximate algorithms for fast results at high input rates.The impact of developing a European open source tool for analysing “data at rest” and “data in motion” in a single system fea ...
Voir le projet

 8

 TERMINÉ 

An Adaptive Trust-based e-assesment System for Learning (TeSLA)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Although online education is a paramount pillar of formal, non-formal and informal learning, institutions may still be reluctant to wager for a fully online educational model. As such, there is still a reliance on face-to-face assessment, since online alternatives do not have the deserved expected social recognition and reliability. Thus, the creation of an e-assessment system that will be able to ...
Voir le projet

 19

 TERMINÉ 
...ata isprocessed on global third-party platforms. Existing models and techniques for security and privacy,which assume trusted infrastructure and well-defined policies, principals and roles, fail to fully addressthis challenge.The imPACT project addresses the challenge of providing privacy, accountability, compliance andtrust (PACT) in tomorrow’s Internet, using a cross-disciplinary and synergistic ...
Voir le projet

 2

 TERMINÉ 
...l (= “between CPS”);-)Simplify the design, implementation and integration of optimal coordinating control intelligence of CPS;-)Enable near-real-time co-simulation of manufacturing systems as a fully integrated “service” of a CPS;-)Create a Digital Marketplace to simplify the matchmaking between offer and demand within the Ecosystem;-)Conceive a multi-sided business model for the Automation Ecosys ...
Voir le projet

 14

 TERMINÉ 

ULTRA ACCURATE WORLD TIMING SERVICES II (WORLDTIMING II)

Date du début: 1 août 2016, Date de fin: 31 juil. 2018,

... service for key facilities all around the world. This allows deploying a terrestrial time network for the incoming 2020 applications, ultra-accurate, traceable with respect to UTC/Galileo GST and fully dependable. It will be a key solution to enable applications as autonomous navigation, UAVs, telecommunications infrastructure virtualization or indoor positioning. The second goal aims to provide ...
Voir le projet

 1

 TERMINÉ 

Next-generation hybrid wind and solar power technology (Omniflow)

Date du début: 1 mai 2015, Date de fin: 31 juil. 2015,

...hroughout the year in different meteorological conditions (currently up to 8.8 kW, with PV). Thanks to its design, Omniflow works well in urban environments. There is no visible motion, and it is fully operational both on and off the electrical grid. The applications and target markets range from distributed energy to novel, autonomous telecommunication base stations and intelligent lighting, in u ...
Voir le projet

 1

 TERMINÉ 
... a central location where coordinated resource management will be performed. Nonetheless, the today’s mobile network ecosystem includes vastly heterogeneous, evidently overlapping (in coverage) and fully isolated (in operation) attachment points that still handle most of the functions necessary for mobile data communications independently. Aiming to meet and surpass the requirements set for the 5G ...
Voir le projet

 10

 TERMINÉ 
...ble, since they lack features such as integrated storage capabilities and bidirectional power flow.Ferroamp is proposing the FerroHub, an innovative electronic hub leveraging several patents, which fully supports smart grids. The solution incorporates a PV inverter, energy storage and the necessary hardware and software to handle power flow to and from the network, as well as other innovative tech ...
Voir le projet

 1

 TERMINÉ 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

...n the cloud and including the rights to travel. The use case will be defined as a specific instantiation of our open concepts, and will benefit from a completely scalable architecture fully instantiated in IP4. This approach is addressing all the key challenges of the work program, supporting a complete door-to- door intermodal travel offer and proposing a seamless integration of the very diverse ...
Voir le projet

 33

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...rded, have been financed by the European Union through the SEPIE, which contributed with 58% of the grant’s amount. The remaining 42% as well as the financing of another 21 scholarships Erasmus has fully corresponded to the Ministry of Education, Culture and Sports of the Government of Cantabria. Destinations of 47 mobilities performed are distributed as follows: • Germany: 7 students • Ireland: 1 ...
Voir le projet

 1

 TERMINÉ 

UN-EMPLOYMENT+

Date du début: 1 mars 2015, Date de fin: 31 août 2016,

...t respects the employability rate of their youngsters and at the same time of the need to adapt the local, regional and national labour markets to the new needs of a global competitive economy taking fully advantage of the educational and training paths of the young people. In this way this project tries to give a step towards the achievement of the emblematic initiative "Youth on The Move" under ...
Voir le projet

 2

 TERMINÉ 

ENHANCING INTERNAL QUALITY ASSURANCE SYSTEMS

Date du début: 1 sept. 2014, Date de fin: 28 févr. 2017,

...upport in further development of IQA. The progress in the implementation of IQA systems varies greatly among HEIs in the four countries participating in the project and many of them are yet to have fully-fledged systems in place. The QA Agencies in the four countries are committed to enhancing their methodologies for the assessment of IQA systems as part of their external evaluations based on the ...
Voir le projet

 9

 TERMINÉ 
...stainable means of energy generation must be found, these must not hamper economic growth and development, or impact negatively on the quality of life. The potential of solar energy has not yet been fully exploited. Even in countries with high solar insolation (>2000kWh/m2) such as Cyprus, the penetration of solar energy in the overall energy mix is still low. PV technology can, however, play a c ...
Voir le projet

 4

 TERMINÉ 

Conservation of rare reptiles and amphibians in Latvia (Life-HerpetoLatvia)

Date du début: 1 sept. 2010, Date de fin: 31 août 2014,

...o establish corridors for animal movement. The Rare Reptile and Amphibian Breeding Centre was established on land owned by the Latgale Ecological Society. The project fully renovated an existing building. Laboratories were equipped with a new heating system (earth thermal pump), an electric system (with solar power elements), and water filtration and regeneration systems. Six large outdoor basins ...
Voir le projet

 3

 TERMINÉ 

From Treated Wastewater to Alternative Water Resources in Semi-Arid Regions (PURE)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2014,

... in Greece that has been given a license for reusing 100% of its effluent. This practice is currently allowed only for tree irrigation. The WTU has a capacity of 40 000 people-equivalent, but is only fully used during the tourist season (June-August). In winter, the WTU serves 2 000 local residents. The system needs upgrading for a number of reasons: there is no monitoring of the quality of the tr ...
Voir le projet

 4

 TERMINÉ 
... these obstacles and find alternative ways of achieving the project objectives and expected results are commendable. The objectives were mostly met, though several longer term aims could not be fully assessed at the end of the project. The pilot waste collection schemes for packaging waste, organic waste and WEEE surpassed the quantitative targets that were set in the proposal (except for C&DW). ...
Voir le projet

 12

 TERMINÉ 

ENhanced and SUstainable TReatment for URban Stormwater (ESTRUS)

Date du début: 1 oct. 2005, Date de fin: 30 sept. 2008,

... Storm water runoff in urban areas can contain high levels of pollution. The ‘first flush’ of rain is often the most polluted. First flush detention tanks have been successfully tested but the system presents some problems that are not easily solved, such as the availability of space. In addition, these systems require very sophisticated numerical models. Distributed Treatmen ...
Voir le projet

 7

 TERMINÉ 
.... The ship is operating to the full satisfaction of its owner, Knutsen, on short sea waterways in Norway; no major problems occurred during the 41 weeks demonstration phase. The ship has a dedicated, fully optimised gas engine resulting in the lowest possible emission of any similar type of vessel running on traditional diesel fuel. Fuelling is provided from the gaseous boil-off of the vessel’s ...
Voir le projet

 1

 TERMINÉ 

Restoring Active Blanket Bog in Ireland (Blanket bog)

Date du début: 1 juil. 2002, Date de fin: 31 déc. 2007,

...ng lobby ensured that this was confined mainly to marginal sites unsuitable for agriculture. Peatlands (both blanket and raised bog) were one of these site types and, until their ecological value was fully appreciated, they were regarded as wasteland to be converted to more productive uses. Forestry was one of those uses and large scale annual afforestation programmes were undertaken resulting in ...
Voir le projet

 1

 TERMINÉ 

Demonstration project PlusPunten Rotterdam (PlusPunten)

Date du début: 1 févr. 2001, Date de fin: 30 sept. 2003,

...s, more points saved and thus more income for the organization. In this model after just over 3 years it was estimated that the costs of the incentive system could be fully paid from the income of services delivered to the paying clients (i.e. SMEs and civil services). This would however mean a considerable scale-up: a factor 200 compared to the Rotterdam pilot. The strategy was to perform some ot ...
Voir le projet

 1

 TERMINÉ 
...ing accessible innovation resources and services to SMEs in the BSR.The problem addressed is that especially SMEs and R&D institutions in branches such as energy, climate or medical technology do not fully exploit their innovation and growth potentials in the field of micro- and nanotechnology. The consequence is less competitiveness of SMEs, less dynamic innovation and economic growth in the BSR. ...
Voir le projet

 14

 TERMINÉ 
... constituting a high level sw layer which can be integrated on the top of commercial CNCs, and it is conceived as open to embed portions of the 4D modules control;• A validated process model to fully exploit the synergistic interactions among elementary processes;• A dedicated 4D Engineering CAD/CAE/CAM Platform, which covers the lifecycle of the reference product family where multiple processes a ...
Voir le projet

 20

 TERMINÉ 

Electrical Simulation Criteria & Tool Performances (ESCRITP)

Date du début: 1 janv. 2011, Date de fin: 31 oct. 2012,

...systems, wing ice protection systems, electro-mechanical actuators, motor control units and engine starters).To reach numeric objectives, an adequate simulation platform has to be developed to successfully address the following steps:• Modelling system through modelling language• Computing simulation through dedicated solver• Post processing data through advanced analysis tools• Display and record ...
Voir le projet

 1

 TERMINÉ 
...ates for guarantees of such key system characteristics when deployed on distributed HW-architecturesTo achieve these objectives, COMBEST will:•\tDevelop a design theory for complex embedded systems, fully covering heterogeneity, interface specifications, composability, compositionality, and refinement for functional and extra-functional properties•\tBuild on substantial highly recognized backgroun ...
Voir le projet

 15

 TERMINÉ 

Electronic Chemical Cell (ECCell)

Date du début: 1 sept. 2008, Date de fin: 31 déc. 2011,

...ical systems. Chemical cells must combine self-replication, self-containment and self-regulation of resources (metabolism) enabling evolution to qualify as alive. ECCell will employ novel families of fully synthetic hybrid informational polyelectrolyte copolymers (not simply DNA), which simultaneously support all three cell functionalities. Their microscopic multiphase self-assembly under electric ...
Voir le projet

 5

 TERMINÉ 
...in many recent projects trying to use commercial applications in Grid systems clearly indicates a technological barrier of current licensing mechanisms that must be overcome before the Grid becomes a fully commercial productive environment.SMARTLM solution is to implement licenses as Grid services thus providing platform-independent access just like other Grid resources. Service Level Agreements b ...
Voir le projet

 14

 TERMINÉ 
...igating the Internet goes beyond traditional search engines. Complementary and different means to navigate the digital world are now required. The objective of GOSSPLE is to provide an innovative and fully decentralized approach to navigate the digital information universe by placing users affinities and preferences at the heart of the search process. GOSSPLE will turn the network into a self-orga ...
Voir le projet

 2

 TERMINÉ 
...hicles is projected to 2200 millions in the 2050. The emerging markets require at most low cost and environment compatible vehicles. P-MOB addresses the above challenges proposing: a novel concept of fully electrical personal mobility, reduction of system complexity concentrating on the essentials, advanced systems integration including solar cells, e-motor and magnetic torque control of the wheel ...
Voir le projet

 8

 TERMINÉ 

Intelligent Dynamics for fully electric vehicles (ID4EV)

Date du début: 1 juin 2010, Date de fin: 31 oct. 2012,

The objective of the ID4EV project is to develop energy efficient and safe brake and chassis systems for the needs of fully electric vehicles and the improvement of active safety and comfort for a faster introduction of fully electric vehicles. These systems will be optimized to the requirements for FEVs. Beside the development and optimization of the most relevant sub-systems of a vehicle with re ...
Voir le projet

 12

 TERMINÉ 

Car multi propulsion integrated power train (CASTOR)

Date du début: 1 juin 2010, Date de fin: 30 nov. 2013,

The main objective of CASTOR is to integrate an innovative distributed propulsion system on fully electrical vehicles. Future electrical propulsion concepts demand more efficiency and less complexity with great functionality, high robustness and light weight and need to run in a wide ambient temperature range.CASTOR is aimed at:•Energy saving of 10 - 20% in respect to present propulsion systems•Co ...
Voir le projet

 7

 TERMINÉ 
...terms of simplification, added flexibility, increased maintainability, quality, energy efficiency and resilience of the sites. The new distribution will complement existing middleware services, being fully transparent to upper layers in the infrastructure. Existing Grid middleware would continue to provide the glue to federate the distributed resources and the services for high-level job and data ...
Voir le projet

 6

 TERMINÉ 
...arch for more efficient solutions, where a compliant structure is continuously optimized in flight using distributed sensors and actuators. From the structural perspective the objective is to produce fully integrated, hierarchical structures with compliance control. However the requirements are conflicting: the structure must be stiff to withstand the external loads, but must be flexible to enable ...
Voir le projet

 1

 TERMINÉ 
.... Approaches based on SOA principles, using distributed networked embedded services in device space, are the most appropriate for implementation of such self-learning solutions. The main obstacles to fully utilize the opportunities offered by service-based self-learning systems are problems related to reliability, availability, interoperability and security & trust of diverse SW services. Context ...
Voir le projet

 3