Rechercher des projets européens

55 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

European Middleware Initiative (EMI)

Date du début: 1 mai 2010, Date de fin: 30 avr. 2013,

The European Middleware Initiative is a collaboration of the three major middleware providers in Europe, ARC, gLite and UNICORE, and other consortia. EMI aims to deliver a consolidated set of middleware components for deployment in EGI, PRACE and other DCIs; extend the interoperability between grids and other computing infrastructures; strengthen the reliability of the services; and establish a su ...
Voir le projet

 26

 TERMINÉ 
In the course of the project compact sized, rugged network enabled sensor nodes for monitoring structural health using • Electro mechanical impedance method (EMI) • Broadband acousto ultrasonic method (AU-BB), will be designed (embedded hard- and software) and prototypes manufactured. A cost-efficient but still failure tolerant network interface will enable the sensor node to operate in a heteroge ...
Voir le projet

 1

 TERMINÉ 

Eliciting Mucosal Immunity to Tuberculosis (EMI-TB)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

...ovel tools for identifying early predictors and correlates of vaccine-induced protection. The overall objective is to design a vaccine that will induce a broad-ranging immune response to MTB both systemically and in the mucosa of the lungs, and provide the currently missing links in protective immunity to this pathogen.
Voir le projet

 15

 TERMINÉ 

Safe cross-border tourism in the Mountains of Bukovina

Date du début: 21 oct. 2013, Date de fin: 20 juil. 2015,

Sustainable development of the tourism sector on both sides of the Romania-Ukraine border. Expected Results: Create a cross-border tourism product that refers to: 4 tourist routes marked and signaled through: red and white p ...
Voir le projet

 2

 TERMINÉ 

Ateliers d'Angers

Date du début: 1 avr. 2015, Date de fin: 31 mars 2016,

...bjective of the training is to allow the participants to develop, to carry out and to enhance the value of their first feature film project.Encouraged by the successful outcome of several projects, Premiers Plans wish to continue and develop its training action, with one edition a year for 2015 and 2016, thanks to the support of the Creative Europe program. We will initiate in 2015 and 2016 a new ...
Voir le projet

 1

 TERMINÉ 
... produce. Methane given off as a by-product of the method was to provide all the power needs of the system, plus more for onward supply to the grid. A final aim of the project was to disseminate results throughout Europe to help overcome negative perceptions of the risks associated with using sludge on the land and to promote the new system as the safest, most cost-effective and sustainable optio ...
Voir le projet

 2

 TERMINÉ 
... area of prosecution. Local communities have a role to play in this prosecution procedure. Objectives The LIFE Natura Themis project aims to: Inform and raise awareness of stakeholders, targeted audiences and the general public in Crete about environmental crime and wildlife crime, in particular, as a special case of ...
Voir le projet

 5

 TERMINÉ 
... The wide area of Romagna includes relevant sites for the conservation of the project’s target species, the southern damselfly (Coenagrion mercuriale castellanii) and hermit beetle (Osmoderma eremita) and possesses a high insect biodiversity – it is home to important populations of beetles, dragonflies and butterflies (Oxygastra curtisii, Lucanus cervus, Cerambyx cerdo, Callimorpha quadripunc ...
Voir le projet

 7

 TERMINÉ 
Background Recycled glass is produced from cullet, the technical name for crushed waste glass that is ready to be remelted. The glass container industry requires cullet to be ‘oven-ready’ (i.e. guaranteed free of substances such as ceramics, chinaware, stones, plastics or organic matter from food and beverages). This is because the presence of such ma ...
Voir le projet

 2

 TERMINÉ 

Integración de Nuevas Metodologías Lingüísticas en el Azud de Alfeitamí

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

CONTEXT The primary objective of our institution is the increase in the percentage of graduated students and the improvement of their professional and academic expectations. In order to achieve that objective, our school wants to carry out a project which improves the students’ communication in the different languages imparted in the centre through language integrated learning (co-operation among ...
Voir le projet

 1

 TERMINÉ 

Multi-proxy approach of marine Silicon and Carbon biogeochemical Cycles (MUSICC)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

Though decoupled in time and space in the ocean, Si and C cycles are closely linked. The role played by these elements on climate and marine ecosystems is essential and their biogeochemical cycle is undergoing dramatic changes. MuSiCC proposes to bring unique know-how, developed abroad by the applicant, to UPMC, a leading French university where he now has a permanent position. This project is com ...
Voir le projet

 1

 TERMINÉ 

The Body-on-a-Chip (BoC) (BOC)

Date du début: 1 juin 2012, Date de fin: 31 mai 2015,

High attrition and failures rates in pharmaceutical and biotechnological drug development require a paradigm change towards more physiological human cell-based assays at an early time point in the process. The central idea of this proposal is to develop a versatile and reconfigurable pharmaceutical screening technology platform that relies on organotypic three-dimensional spherical microtissues. T ...
Voir le projet

 5

 TERMINÉ 
(a) to promote cross-border cooperation between mountain area, in production and marketing of farm products, of traditional handicrafts and eco-tourism in order to develop a solide eco-economy through consolidation of small busineses; (b) to develop an eco-destination in cross border area (a common eco-tourism brochure will be produced) and to improve the knowledge about eco-tourism at EU standar ...
Voir le projet

 4

 TERMINÉ 
Le projet TEMIS propose une recherche innovante dans le champ médicotechnique, à travers le transfert de technologie du secteur des TIC appliqué au domaine médical.La recherche médicale a démontré que le mode de vie a un impact sur de nombreuses pathologies, en particulier pour les maladies chroniques. À cet égard, TEMIS étudiera des indicateurs de santé pouvant ensuite être utilisés pour une méde ...
Voir le projet

 6

 TERMINÉ 
Raccolta di informazioni sulle statistiche nel settore della sicurezza e della salute sul lavoro.
Voir le projet

 1

 TERMINÉ 
To increase the productivity and the competitiveness of the agricultural sector through increased contacts of partners on both sides of the border in order to improve the economic situation in the Programme area. Expected Results: ...
Voir le projet

 5

 TERMINÉ 

TransAgROpolis - TransfROntier AgRObusiness Support

Date du début: 14 févr. 2012, Date de fin: 14 févr. 2015,

The project's objective is the develop the agricultural marketing infrastructure in order to improve the economis performance of the border economy in the inter-regional area. Expected Results: TransAgropolis Agro-industrial P ...
Voir le projet

 7

 TERMINÉ 

Cross-border cooperation in preventing human trafficking

Date du début: 3 sept. 2013, Date de fin: 3 sept. 2014,

The objective is to reduce the dimensions of the human trafficking phenomenon and removing the negative effects it has on the border area Romania-Ukraine-Moldova. Expected Results: Increasing of the level of information and aw ...
Voir le projet

 4

 TERMINÉ 
...n is located at the borders between Greece, Albania and Macedonia. It is surrounded by mountains and contains two lakes. The Prespa lakes contain around 23 species of fish, including nine that are endemic. Native carp are important to the fishery sector. However, the introduction of non-native species poses a threat to the structure of endemic fish populations. Long-term monitoring has shown, for ...
Voir le projet

 1

 TERMINÉ 
The objective is to promote greater interaction between teenagers and teachers from high schools in the cross-border area through technology adoption in their daily activity. Expected Results: 6 equipped media classrooms; 2 eq ...
Voir le projet

 5

 TERMINÉ 

Business Environment – sustainable promotion and development

Date du début: 29 août 2013, Date de fin: 28 déc. 2014,

The increase and the expanding of cross border cooperation between the institutional actors of Galati, Romania, Cahul, the Republic of Moldova and Odessa, Izmail, Ukraine with responsibilities in the economic regional development. Expected R ...
Voir le projet

 6

 TERMINÉ 
Background The hydrographic network of creeks and streams that drain water from the hills and mountains of Emilia-Romagna are often characterised by small watersheds and narrow stream beds prone to flooding. As a consequence, creeks and streams are characterised by steep slopes and very few floodplains. Thus, it is not always easy to consider the expansio ...
Voir le projet

 5

 TERMINÉ 

Conservation of priority bird species in Lake Mikri Prespa, Greece (Mikri Prespa)

Date du début: 1 juil. 2002, Date de fin: 30 juin 2007,

Background Lake Mikri Prespa is part of the Prespa National Park and of the transboundary Balkan Prespa Park set up in 2000 by Albania, the former Yugoslav Republic of Macedonia, and Greece. The lake has been classified as a wetland of international importance under the Ramsar Convention and has been designated as a special protection area under the EU Bi ...
Voir le projet

 1

 TERMINÉ 

Development of the port of Otranto (Adeguamenti infrastrutturali del porto di Otranto)

Date du début: 31 janv. 2005, Date de fin: 30 déc. 2006,

L`interveno prevede la realizzazione di un piazzale, di un area parcheggio e la costruzione di un edificio da destinare a servizi, nelle aree esterne nella cosidetta "Area Fabbriche", nella zona di ingresso del porto.
Voir le projet

 1

 TERMINÉ 
To explore the existing tourism potential, develop local recreational facilities and create a sustainable cross-border tourism network in Galati – Cahul – Reni cross-border region. Expected Results: 1 tri-nodal cross-border to ...
Voir le projet

 3

 TERMINÉ 

Educating the Educators

Date du début: 14 août 2014, Date de fin: 13 déc. 2014,

...hancing human rights education therein. After the course, AEQUITAS will draw up a report on the project, its aims and objectives, methodologies and activities as well as results which it will disseminate widely as a source for other youth organizations to refer to when implementing such activities. Moreover, this project aspires to improve the capacity of the partner organizations to use human rig ...
Voir le projet

 5

 TERMINÉ 

Sinergjia, Kultura, Arti, Institucione (S.K.A.I.)

Date du début: 28 févr. 2005, Date de fin: 29 août 2006,

Il progetto ha la finalià generale dell'intervento è quella di valorizzare le economie locali dei microsistemi territoriali delle aree frontaliere coinvolte, favorendo un più efficace inserimento nel mercato europeo e contribuendo a raggiungere l'obiettivo della ricomposizione delle risorse culturali ai fini dello sviluppo economico. L`obiettivo principale del progetto si concentra nella attivazio ...
Voir le projet

 1

 TERMINÉ 
To improve the economic performance of the border area through diversification and modernisation in a sustainable manner of cross-border tourism in the Lower Danube region of Ukraine, Romania and Republic of Moldova. Expected Results: ...
Voir le projet

 9

 TERMINÉ 
Improving the quality of public emergency services in the cross-border area Romania (Iasi, Vaslui, Galati, Tulcea, Braila counties) and Republic of Moldova by increeasing the intervention capacity of management emergency situations structures and respectively increase the level of safety and health of inhabitants. ...
Voir le projet

 3

 TERMINÉ 

Medieval Jewelleries: Khotyn, Soroca, Suceava, Mejekss

Date du début: 17 mai 2012, Date de fin: 17 mai 2014,

The objective of the project is to increase the competitiveness and attractiviness of the Soroca-Suceava-Khotyn region by implementing in cross-border partnership activities related to enrichment of tourism potential and promotion of common cultural and historical values. Achievemen ...
Voir le projet

 4

 TERMINÉ 
The project's objective is to improve of the cross-border integration and the long-lasting development of the frontier economy between the communities from Romania and Ukraine. Expected Results: Modernization by concrete casti ...
Voir le projet

 2

 TERMINÉ 

European Desktop Grid Initiative (EDGI)

Date du début: 1 juin 2010, Date de fin: 31 août 2012,

...nfrastructure. EDGI will establish the EuroCivis organization to coordinate DG-related activities in Europe both for solving technical issues as well as to attract volunteer DG resource donors by disseminating results of the EDGI and EGI projects. EuroCivis and EDGI will work in strong collaboration with EGI, EMI, NorduGrid, Unicore Forum and interested NGIs.
Voir le projet

 11

 TERMINÉ 
...orld’s total energy consumption. Ammonium is the basic component for the production of nitrogen fertilisers, but this process is very energy intensive (36.6 GJ/t NH3) as well as producing high emissions of CO2 (1966.8 kg CO2 eq/kg) and nitrogen oxides. Organic fertilisers obtained from animal waste, however, can partially substitute inorganic fertilisers, but there are some difficulties linked ...
Voir le projet

 4

 TERMINÉ 
Obiettivo primario del progetto è creare una rete permanente tra i soggetti istituzionali appartenenti al sistema dei beni culturali pugliese e albanese in grado di progettare e attuare politiche per la protezione e valorizzazione dei Beni Culturali. Tale rete sarà alimentata e sostenuta grazie all'utilizzo di tecnologie web based che terranno continuamente in contatto tutti i nodi della rete che ...
Voir le projet

 1

 TERMINÉ 

Improving Innovation Capacity in European Chemical Clusters (ChemClust)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

The project Chemclust is a cooperation between 10 chemical regions from 7 Member States with the objective to improve the effectiveness of regional development policies in the area of innovation and cluster policies for the chemical sector by means of interregional cooperation and exchange of best-practice. The project has the aim to 1. accelerate the innovation capacity in chemical clusters in c ...
Voir le projet

 10

 TERMINÉ 

Mejoramos con Europa

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

Pre-primary and Primary School Emilio Carmona develops and Erasmus+ project whose main idea is the development some of our staff´s proffessional competences. Our European Development Plan aims at the achievement of teaching quality in our everyday work and enhances the developmnet of those aspects of our teaching practise which should be improved, especially those that we lack, and are relat ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...provisions of EU Regulation No 1288/2013 of the European Parliament and of the Council and the Strategic Framework ET 2020, the Erasmus+ KA103 awarded to the Academy of Fine Arts in Lecce for the academic year 2014/2015 have permetted to twenty persons among students, teachers and administrative staff to organise and realize their study, training and work / training abroad experience (as for stude ...
Voir le projet

 1

 TERMINÉ 
To contribute the readiness to the emergency situation in the medicine sphere in the cross-border area of Bukovyna and Moldova. Expected Results: Purchased equipment for the Novoselytsya district central hospital, Zastavna dis ...
Voir le projet

 5

 TERMINÉ 

Eco-Cities- A Common Vision in the Cross-Border Area

Date du début: 17 déc. 2013, Date de fin: 16 oct. 2015,

To develop long-term solutions to the environmental problems faced by the border areas, by converting a cross-border city (Durleşti) into an ecological one and by organizing seminars on ecological topics held by experts in the cross-border area. ...
Voir le projet

 4

 TERMINÉ 
Gli obiettivi che il progetto si pone sono: 1) Collegamento in rete dei servizi territoriali dedicati alla prevenzione; 2)Diffusione di pratiche condivise, standartizzazione delle tecniche di prelievo e di diagnostica citologica della cervicale e del carcinoma mammario.
Voir le projet

 1

 TERMINÉ 

ULYSSES

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

...fessional journey” young talent must undertake in order to become mature artists. Ulysses aims to propose “paths” that will enable young artists to find their way from the academies, through the journeys that ultimately will put them in a position to be offered commissions for creating new works to be premiered in world-class venues, thus serving as a “launching pad” for their careers. Secondly, t ...
Voir le projet

 13

 TERMINÉ 

RISK CHANGE

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

... related to contemporary migrations and continuous social and cultural change in 21th Century the geopolitical focus on EU and neighboring countries.RC aims to research, create, connect, compare, disseminate and promote contemporary interdisciplinary art related to science, especially social and applied sciences, and ICT. RC will highlight the importance of connectivity and interdisciplinary cultu ...
Voir le projet

 10

 TERMINÉ 

YOUNG OPERA MAKERS Programme by enoa

Date du début: 11 mai 2016, Date de fin: 10 mai 2020,

YOUNG OPERA MAKERS PROGRAMME by enoaThe role of creation, development of new forms, exploration of innovative creative processes and audience renewal are all major challenges facing today’s European opera world. Young artists must be the drivers of this change: their training and employability are crucial issues. In a globalized and competitive sector young artists should be fundamentally mobile a ...
Voir le projet

 13

 TERMINÉ 
...nishing virtual simulator and a specific database on finishes and coatings.b) Multiplier Event: an international conference on finishings and coatings.c) Joint training activities for teachers.d) Dissemination activities: web platform, workshops, newsletters...The project target groups are students and teachers of VET, companies in the furniture industry and prescribers. Therefore, these groups wi ...
Voir le projet

 5

 TERMINÉ 

Healthy EU

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Nowadays people often sit while working, move with car and eat and drink more and more unhealthy things than they need. We already pay huge amounts of money for nursing physical and mental problems of these people. European people live longer but can be even in worse condition than before. The main way to influence this development is influencing our youngsters. At the moment they move too little, ...
Voir le projet

 6

 TERMINÉ 
There are major changes within and related to the professional driving profession ahead of us that need to be prepared and supported by vocational education and training in order to reach its full potential but also to avoid a further increase of already today’s major deficits of skilled workers in this field that belonged continuously to the Top Ten jobs employers are having difficulty filling ov ...
Voir le projet

 6

 TERMINÉ 

Measuring Return on Investment from EU VET mobility

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The Education and Training 2020 Strategy wishes for a challenging 6% rate of VET students involved in a mobility experience abroad, compared to the current 0,7%. ROI-MOB springs from the idea that quality can increase quantity. But what is quality?All people say work experiences abroad are useful, enriching, favour employability, development of one’s skills, etc.. What are such statements based up ...
Voir le projet

 8

 TERMINÉ 

100Mirrors Inclusive Tools for the motivation of enterprising disabled women

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The aim of this project is to promote inclusive entrepreneurship for women with disabilities by developing a methodology based on coaching, mentoring and job shadowing of women with physical disabilities willing to become entrepreneurs. Coaching and mentoring will be done by successful disable women entrepreneurs supported by trainers. The project will also develop a Needs and state of the art ana ...
Voir le projet

 6

 TERMINÉ 
...ket;- uses educational biographies and other screening measures in order to enhance employability of young refugees and encourages the use of Europass as an instrument.project partners:- Berufliches Seminar Karlsruhe, Germany (coordinating partner)- Education Group, Austria- Escuela Professional Otxarkoaga, Spain- Falun Borlänge Regionen AB, Sweden- Istanbul University, Turkey- Landesinstitut für ...
Voir le projet

 6

 TERMINÉ 

Breakthrough solutions for adaptable envelopes for building refurbishment (BRESAER)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2019,

The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Voir le projet

 17

 TERMINÉ 
...n skills. Another challenge for Europe is to reinvent the notion of industrial innovation by coupling the three components of the Knowledge Triangle: the HIGH EDUCATION as knowledge producer, the academic RESEARCH as creativity source, and BUSINESS, with its entrepreneurial spirit. Europe is facing, also, with the loss of its cultural and material identity, inclusive the culture of traditional foo ...
Voir le projet

 5

 TERMINÉ 

SymfoS - Symbols for success

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2019,

...mfoS and different EU transparency and recognition tools we will clarify interfaces and synergies by the help of concrete case studies. SymfoS implements a systemic approach that focuses on target groups at four different levels: 1.) 500 Young people (15-25 years) facing problems in school or labour market (low qualified, job seeker, drop-outs, NEETS) will be counselled. Objectives pursued are ef ...
Voir le projet

 6

 TERMINÉ 

Competency Based Inland Waterway Transport Education & Training

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2019,

...in Craiova, Ingineria si Managementul Sistemelor Tehnologice - IMST, RomaniaZilinska Univerzita v Ziline, SlovakiaSchiffer-Berufskolleg RHEIN, GermanyStichting Dunamare Onderwijsgroep, Maritieme Academie Harlingen, NetherlandsFor the project management we will make use of Prince 2.
Voir le projet

 6

 TERMINÉ 

MILAR Modelli Inclusione Lavoro Rifugiati

Date du début: 3 oct. 2016, Date de fin: 2 févr. 2019,

...ing of Social Community Enterprise projects and of learning pathways for refugees, gathered in a Compendium of experimentations and Toolkits for refugees• COMMUNICATION AND DISSEMINATION The METHODOLOGY used in MILAR, precisely because it is focused on the community model of social community enterprise, promotes the constant participation and sharing among the partners, towards territorial ...
Voir le projet

 5

 TERMINÉ 

BIM4PLACEMENT European key competences in building and construction

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

...R Region (Italy).INTELLECTUAL OUTPUTS envisaged:1. Comparative research "BIM as driver for employment" (publication)2. New/renewed professional qualification in building and construction sector for Emilia Romagna Region 3. New/updated training programs about BIM for students, unemployed, employed in building sector4. New serious game about BIM addressed to beginners from various environments5. BIM ...
Voir le projet

 6