Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Clean Accessible Transport for Community Health (Catch)

Date du début: 1 sept. 2002, Date de fin: 31 août 2005,

...ental Action Programme by promoting sustainable mobility; • Significantly improve urban air quality; • Implement advanced pollution monitoring techniques in Liverpool city centre; • Significantly expand the use of clean fuels in public transport and local authority vehicle fleets; • Contribute to the EC’s Kyoto commitments by reducing emissions of greenhouse ...
Voir le projet

 2

 TERMINÉ 
...ing great pressure on the natural landscape setting. In many urban spaces, the historic core is surrounded by physically separated new suburbs, which are nevertheless functionally linked to the urban centre, leading to growth in road traffic resulting in the loss of biodiversity and fragmentation of the natural environment. In this context open spaces play a vital role. They have a direct influenc ...
Voir le projet

 13

 TERMINÉ 

Regional Mobilizing of Sustainable Waste-to-Energy Production (REMOWE)

Date du début: 30 nov. 2009, Date de fin: 15 déc. 2012,

...uable for several actors. Just in project constellation we see how experiences from REMOWE could be used by the different authorities in their daily work (County Administrative Board of Västmanland; Centre for Economic Development, Transport and the Environment for North Savo; and Marshal Office of Lower Silesia). The reports have also been summarized in three brochures for various stakeholders pe ...
Voir le projet

 9

 TERMINÉ 

Removal of unexploded ordnance (UXO) from the Danube River, sector Prahovo

Date du début: 29 juin 2010, Date de fin: 30 déc. 2012,

...an efficient and effective supervision of their removal from the navigation fairway, but in accordance with international regulations and standards. Priority areas will be selected by the Mine Action Centre, Plovput and the Ministry of Infrastructure. Those locations will be verified by the project.
Voir le projet

 1

 TERMINÉ 

Managing the Industrial Territories in the Knowledge Era (MITKE)

Date du début: 31 oct. 2008, Date de fin: 30 oct. 2011,

... MITKE partnership is composed by 11 partners with several years of experience in managing BAIPs, being 6 of them regional development agencies, 4 Business networks and land developers and 1 research centre. The partnership is representing 10 regions spread over 7 different EU countries. ...
Voir le projet

 11

 TERMINÉ 

Maritime Incident Response Group EU (MIRG EU)

Date du début: 31 déc. 2011, Date de fin: 29 sept. 2014,

...ries benefitting from the results?All partners and partner regions will benefit from the activities of this project. The MIRG EU project will specifically target the emergency services and coastguard centres of all partners as currently, they are responsible for incident management. Increasing the knowledge, skills and operational readiness enables the emergency services in all partner regions to ...
Voir le projet

 7

 TERMINÉ 

Low-Carbon Economy Regions (LoCaRe)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...thority in the west-central part of SwedenAsturias (E): a regional government in the northern part of SpainEmilia Romagna (I): an administrative region in the northern part of ItalyBusiness Support Centre Gorenjska (SL): A non-profit limited company established by municipalities, chambers of craft, chamber of commerce and Republic of SloveniaProvince of Zeeland (NL): A province in the south-wester ...
Voir le projet

 6

 TERMINÉ 

Last Mile Logistics (LaMiLo)

Date du début: 11 mai 2011, Date de fin: 29 juin 2015,

...conomically viable for companies. The project will promote new business practice. so far only tested at research pilot scale. for delivering individual consumer goods to homes. shops and distribution centres. It will simplify last mile logistics and embed new ways of delivering goods by changing behaviour of private companies. the public sector and consumers. Globalisation and e-commerce change h ...
Voir le projet

 17

 TERMINÉ 
...d and non-qualified personnel and extremely poor cross-border coordination among bodies involved in the implementation of contingency plans. Furthermore, there is no Adriatic training and research centre, while some Adriatic countries – and a large number of regions – have no contingency plans, making matters even worse. Generally, the disregard for the marine environment and the alarming lack of ...
Voir le projet

 13

 TERMINÉ 

Green Urban Transport Systems (GUTS)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

...res for clean urban public transport. The GUTS partnership has continuously involved local/regional stakeholders via Regional Stakeholder Platform meetings and set up a Public Transport Resource Centre, which is a virtual platform where numerous professional documents and relevant information has been gathered in a database to be shared among partners and beyond. The platform is accessible public ...
Voir le projet

 8

 TERMINÉ 

Green Atlantic for Sustainable Development (GASD)

Date du début: 31 oct. 2006, Date de fin: 29 juin 2008,

...e priority issues and the corresponding technical, technological, scientific, economic, financial and political resources in order to provide a response in the context of the future centre of excellence. - Matching the needs of maritime regions in terms of maritime safety and the environment with the technical, scientific, technological, economic and political resources to meet the strategic chall ...
Voir le projet

 14

 TERMINÉ 

Connected Mobile Communities in the Northern Periphery 2.3 (CMC@NP)

Date du début: 31 août 2008, Date de fin: 30 déc. 2010,

...e Community model (In Progress). Implement the Connected Communities model developed in last point in each project region (Complete). Establish combined Connected Communities Office and Demonstration Centre in each region (Complete). Development of mobile services in the public, transport and community sectors (Complete). Once the services have been developed, workshops will be held in each region ...
Voir le projet

 5

 TERMINÉ 

Baltic-Adriatic Transport Cooperation (BATCo)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

...Logistics Centers, important logistics nodes and business potentials in the partner regions. Major progress has also been made with the finalisation of the concept for upgrading logistics centres to “Transnational Logistics Centre Incubators” which, when institutionalised will support SME’s in the partner regions along the Baltic-Adriatic Axis. In order to set up a Transnational Business Cooperati ...
Voir le projet

 18

 TERMINÉ 

Green Games and Local Authorities (GALA)

Date du début: 1 oct. 2001, Date de fin: 30 sept. 2004,

... EMAS in selected municipal sports facilities The EMAS Manual was developed for selected municipal sport facilities (basketball indoors and open courts, volleyball courts, tennis courts and swimming centre). In addition, an environmental programme was formulated for each sports facility. However, it was decided to proceed in the first instance with the implementation of the environmental programm ...
Voir le projet

 2

 TERMINÉ 
...e stove is a prototype developed during the course of the project and is also usable in passive houses. The S-HOUSE building has been established as a permanent exhibition and information centre. The objective of the permanent site is to promote the use of renewable raw materials and sustainable technologies in construction. As well as the permanent exhibition, technical symposia and advanced ...
Voir le projet

 1

 TERMINÉ 

Perpetuum Mobile 2

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

...rtners to foreign partners from Germany, Slovenia, Finland and Sweden.The second mentioned are: Croatian Economic Association in Frankfurt am Main and Frigoair Logistik from Neuss (Germany), School Centre Celje and Ocean Orchids d.o.o from Dobrovnik (Slovenia), Tampere Vocational College Tredu, South Savo Vocational College and Kouvola Region Vocational College (Finland) and Björknäsgymnasiet Bod ...
Voir le projet

 9

 TERMINÉ 
... at project start were operated by diesel vehicles, would be switched for methane-run vehicles operated “on demand” i.e. the user would communicate (booking via call centre, Internet or other means) the start and the destination of his/her trip; a computer system would then match the request to the vehicle in the optimum way. At the same time public awareness-raising activities would encourage ...
Voir le projet

 4

 TERMINÉ 
...roportion of recyclable material. The commitment affects both manufacturers and other economic stakeholders throughout the vehicle’s life. It also impacts on the development centre insofar as it must guarantee that its products fully comply with these requirements in matters of recycling. This project also contributed to the European Directive 91/156/CEE on March 18, 1991 amending Directive 7 ...
Voir le projet

 1

 TERMINÉ 

SYNERGY, Quality and respect for environment (SINERGIA)

Date du début: 1 sept. 2003, Date de fin: 1 juin 2006,

...These practices have been included in various manuals, with recommendations for each practice. Some of the practices were tested in various farms and wineries as well as the research and experimental centre of the beneficiary. - Design and validation of a System of Control and Certification which sets up the mechanisms for compliance with the production model defined during the project. However, ...
Voir le projet

 4

 TERMINÉ 

Demonstration of Photocatalytic Remediation Processes on Air Quality (PhotoPaq)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2014,

...sting of photocatalytic material prior to their installation. The demonstration value of the PhotoPAQ project resides in the application of photocatalysis in specific urban conditions, namely a city centre tunnel with extreme traffic density (Brussel's Léopold II tunnel, Belgium) and a street canyon in an industrial area (a factory complex in Bergamo, Italy). Measurements from these campaigns we ...
Voir le projet

 7

 TERMINÉ 
...ironmental footprint of the created or converted urban facilities; Recycling and reuse of more than 75% of waste from project activities; and A ‘practical’ urban resilience charter and a centre to disseminate good practices of urban resilience at regional and European levels.
Voir le projet

 3

 TERMINÉ 
...ency. Eco-investments were promoted through the creation of an area for preferential eco-investment activities in Soria, which included the environmental corridor; the historic town centre, with its many old buildings; and the San Juan District, an economically-depressed area. The municipality drafted a document entitled ‘Delimitation of the area of preferential eco-investments in Soria’, whi ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 mai 2016,

CONTEXT The CPIFP “Los Enlaces” became operational as an Institute in the 1985-86 academic year. In 2010-2011 it becomes an Integrated Vocational Training Centre. We offer formal education in Intermediate and Advanced Vocational Training and Educational Cycles, classroom-based and distance-learning in the fields of Information Technology, Image & Media, Transport and Logistics, Marketing and Publ ...
Voir le projet

 1

 TERMINÉ 

Open your Mind

Date du début: 20 juin 2014, Date de fin: 30 juin 2015,

...pen door days”, on the information day, on “Festival of education” (“Festival izobraževanja”) and on technical days in primary schools. The model of cooperation with the Youth Centre Brežice (MC Brežice) and the Posavje Museum Brežice has proven as very successful in the context of presenting our work in international projects to the local community, so we intend to keep this model also for this p ...
Voir le projet

 3

 TERMINÉ 

The Best Experiences and Competences from Europe

Date du début: 1 sept. 2014, Date de fin: 31 août 2015,

The current mobility project involves teachers of department of agricultural studies and students in Järvamaa Vocational Training Centre. Therefore we can itemize more than just one aim: • providing our students as large-scale education as possible to compile with labour market in European Union; • supporting students in basic vocational education and training offering them knowledge, vocationa ...
Voir le projet

 6

 TERMINÉ 

Movilidad Erasmus CM para prácticas en empresas

Date du début: 19 déc. 2014, Date de fin: 18 déc. 2016,

...eement with the host companies (Annex I translated into English) - Request authorization to the administration to carry out the placement of the student abroad -Make a report (by the secretary of the Centre) in accordance with the student is covered by school insurance -Conduct an individualized plan of FCT and translate it into English. - Define the objectives of stay - Select the participants - ...
Voir le projet

 5

 TERMINÉ 

Proval: pasaporte a Europa

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

...eement with the host companies (Annex I translated into English) - Request authorization to the administration to carry out the placement of the student abroad -Make a report (by the secretary of the Centre) in accordance with the student is covered by school insurance -Conduct an individualized plan of FCT and translate it into English. - Define the objectives of stay - Select the participants - ...
Voir le projet

 5

 TERMINÉ 

Global Skills with Erasmus+

Date du début: 1 juin 2016, Date de fin: 31 août 2017,

The current mobility project involves teachers and students of Järvamaa Vocational Training Centre. The aims of the project are offering a large-scale education to compile with labour market in European Union, supporting people involved in vocational education offering them knowledge, vocational skills and qualification through implementation of ECVET. The mobility involves our employees in Depar ...
Voir le projet

 6

 TERMINÉ 

Proval VET mobilities 2016

Date du début: 31 déc. 2016, Date de fin: 30 déc. 2018,

...r key 1 + Action program-Make an agreement with the host companies- Request authorization to the administration to carry out the placement of the student abroad-Make a report (by the secretary of the Centre) in accordance with the student is covered by school insurance-Conduct an individualized plan of FCT and translate it into English.- Define the objectives of stay- Select the participants- Prep ...
Voir le projet

 4

 TERMINÉ 

Akvakultūros kūrimas pagal ES ateities viziją

Date du début: 1 juil. 2014, Date de fin: 30 juin 2015,

At the moment our school is implementing the European cohesion fund project “Establishment of Fisheries Practical Training Centre in Silute Agricultural School' VP3-2.2-MES-13-V-03-031-9.9 million litas of its value . The building is equipped, prepared training classes and the facilities for practical training, organized environment, purchased the ship for inland waterways and recreational ...
Voir le projet

 3

 TERMINÉ 
Background Freshwater habitats are among the most threatened habitat types globally. In the 2007-2012 conservation status assessment of the EU Habitats Directive (Article 17), none of the freshwater, coastal, and groundwater dependent wetland habitats in Europe fully met favourable conservation status, and most are in unfavourable conservation status. Alm ...
Voir le projet

 30

 TERMINÉ 

Light & Fire open the Doors for Biodiversity -LIFE (Light & Fire -LIFE)

Date du début: 1 août 2014, Date de fin: 31 juil. 2020,

Background Under Article 17 of the Habitats Directive, EU Members States are required to periodically report on the conservation status of Annex I natural habitat types and Annex II species that fall within their territory. The Finnish country report for the period 2001-2006 assessed the overall conservation status of 18 out of 19 Annex I natural habit ...
Voir le projet

 6

 TERMINÉ 

Safeguarding the Saimaa Ringed Seal (LIFE Saimaa Seal)

Date du début: 1 août 2013, Date de fin: 31 juil. 2018,

Background Once widespread in Finland, the Saimaa ringed seal (Phoca hispida saimensis) is now found only in the Saimaa fragmented freshwater lake complex. With a small population of about 310 seals, it is probably the world’s most endangered seal species and is categorized by the IUCN as Critically Endangered. In Annex II of the Habitats Directive, it ...
Voir le projet

 8

 TERMINÉ 
Background The project area includes 32 Natura 2000 network sites (over a total area of 363 000 ha) located in south-western Lapland. The area is extremely valuable and vulnerable due to its unique biodiversity and rare limestone soil. Areas outside the Natura 2000 sites are mostly commercial forests, where mining districts and claims, peat industry and b ...
Voir le projet

 5

 TERMINÉ 
Background Watersheds in urban environments are largely invisible and altered from their natural state. Widespread impervious surfaces, such as concrete and asphalt, and underground stormwater sewer networks have adversely altered watershed boundaries and lead to the rapid flow of untreated stormwater and snowmelt water into receiving bodies of water. Bec ...
Voir le projet

 4

 TERMINÉ 
Background Multi-criteria decision analysis (MCDA) has emerged as a formal methodology for fusing available technical information and stakeholder values to support decision-making in many fields. MCDA has many characteristics, such as the integration of diverse information and the handling of conflicting objectives, which make it a useful tool for suppor ...
Voir le projet

 4

 TERMINÉ 

Safer Roads for Users

Date du début: 22 mai 2013, Date de fin: 21 juil. 2015,

The main objective of the Project is to eliminate border effect expressed with difference in road accident risks for road users in EU and RF sides of Barents Region. Harmonisation of principles and instruments to manage accident risk for users, caused by factor "Road and its surrounding" is expected to be able harmonise road conditions both sides of the border, improve fluency of road transport fl ...
Voir le projet

 8

 TERMINÉ 

The Barents Freeway

Date du début: 3 sept. 2012, Date de fin: 30 mai 2015,

Economic and social development of local communities in the Kolarctic area through optimization of transport infrastructure development on a base of the common Barents Region Transport Strategy responding to new challenges arising in the Arctic and Northern periphery. Achievements: ...
Voir le projet

 10

 TERMINÉ 

Trilateral cooperation on Environmental Challenges in the Joint Border Area (TEC)

Date du début: 29 févr. 2012, Date de fin: 30 janv. 2015,

Assessment tools for detecting the effects of harmful substances, water regulation and climate change will be developed in the Finnish, Norwegian and Russian border region within the project. The aim of the project is to develop tools used by environmental authorities and researchers when assessing the impacts of airborne emissions, regulation of waterways and climate change on the environment. Th ...
Voir le projet

 8

 TERMINÉ 

Nuijamaa Border Crossing Development II

Date du début: 31 janv. 2013, Date de fin: 30 déc. 2014,

In order to increase border crossing throughput between Finland/EU and Russia, the project will improve transport area infrasructure and facilities on the Nuijamaa crossing point.
Voir le projet

 6