The typical lifetime of an industrial process plant is between 30 and 50 years. Technologies to enhance the operation and optimization of process plants can both guide the development of new state-of-the-art process plants and, perhaps more pertinently, can ensure that the large installed base of existing plants operates efficiently. The PRONTO Consortium partners are strongly convinced that for E ...
Voir le projet

 11

 TERMINÉ 
Individualised production is an emerging trend in manufacturing. Laser-based Additive Manufacturing (LBAM) fits well with this trend, due to its capability of transforming digital designs directly into physical products. LBAM is not yet competitive for a widespread industrial adoption: post-processing operations are necessary and they are not currently integrated, human intervention is needed to o ...
Voir le projet

 13

 TERMINÉ 
"In ZERO-PLUS, a comprehensive, cost-effective system for Net Zero Energy (NZE) settlements will be developed and implemented. The system will be composed of innovative solutions for the building envelope, for building energy generation and management, and for energy management at the settlement level. A reduction of operational energy usage to an average of 0-20 kWh/m2 per year (compared with the ...
Voir le projet

 18

 TERMINÉ 
The project HERCULES-2 is targeting at a fuel-flexible large marine engine, optimally adaptive to its operating environment. The objectives of the HERCULES-2 project are associated to 4 areas of engine integrated R&D:• Improving fuel flexibility for seamless switching between different fuel types, including non-conventional fuels.• Formulating new materials to support high temperature component ap ...
Voir le projet

 33

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Voir le projet

 17

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only these eco-efficient mines will contribute to improved access to domestic mineral resources, secure the supply of mineral raw materials for Europe and reduce the import dependency.IntelliMine will contr ...
Voir le projet

 27

 TERMINÉ 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Voir le projet

 28

 TERMINÉ 

High Power, high Reliability offshore wind technology (HIPRWIND)

Date du début: 1 nov. 2010, Date de fin: 30 juin 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Voir le projet

 22

 TERMINÉ 

Safety Testing Approaches for Large Lithium-Ion battery systems (STALLION)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

The STALLION project develops and validates a safety framework for large stationary Lithium Ion batteries in all stages of their life cycle (commissioning, transport, installation, operation, maintenance, repair, decommissioning, recycling). It offers a unique approach by relating safety issues to root causes at all levels of the system (material, cell, module, pack, system). This two-axis safet ...
Voir le projet

 8

 TERMINÉ 
The drive across the world towards energy efficiency and reduction of CO2 emissions is leading to new industrial processes and new ways of operating existing processes. In particular, the control and operation of processes, rotating machinery and electrical equipment is becoming radically more integrated giving new opportunities for energy saving through equipment management, automation, and optim ...
Voir le projet

 10

 TERMINÉ 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Voir le projet

 15

 TERMINÉ 
"HERCULES was conceived in 2002 as a long-term R&D Programme, to develop new technologies for marine engines. It is the outcome of a joint vision by the two major European engine manufacturer Groups MAN & WARTSILA, which together hold 90% of the world’s marine engine market.The present proposed HERCULES-C project is the Phase III of the HERCULES Programme. In order to take marine engine technology ...
Voir le projet

 23

 TERMINÉ 
Power transmission in Europe is entering a period of significant renewal and technological change because the electrical transmission grids face increases in new and variable energy sources, especially from large scale wind power generators. They therefore face future challenges of operation and control. Changes happening in the process industries will also have an impact on electrical supply beca ...
Voir le projet

 11

 TERMINÉ 

Validating Changes and Upgrades in Networked Software (PINCETTE)

Date du début: 1 juil. 2010, Date de fin: 31 oct. 2013,

...nable certification of upgrades.The PINCETTE consortium is composed of the leading European research experts and prominent infrastructure providers. The PINCETTE technology will be validated at:•\tABB produces and sells components and systems used in utility, industrial, and public transportation infrastructures. A major share of the European power grid is built on ABB equipment.•\tVTT provides th ...
Voir le projet

 8

 TERMINÉ 
The first objective of the project is plant-wide application of asset management. It lifts the focus from single-component diagnostics to a plant-wide view of both asset performance and asset condition. Secondly, because di-agnostics need to result in actions, diagnostic information (asset information) is used to generate control actions. Control refers to all levels of the automation pyramid, i.e ...
Voir le projet

 8

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 

Price-based Control of Electrical Power Systems (E-PRICE)

Date du début: 1 févr. 2010, Date de fin: 31 mai 2013,

The EU electric power system experiences a fundamental change in the quasi-monopolistic, top-down oriented, stable, and reasonable predictable arrangements of the past. It now spans continents, has hundreds of millions consumers and hundreds of thousands of producers, from nuclear power plants to privately-owned and operated badly predictable renewables such as solar cells, wind and microturbines ...
Voir le projet

 9

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 
"The CASOPT Project Consortium consisting of ABB, University of Cambridge, Technical University of Munich and Technical University of Graz proposes to facilitate a paradigm change from state-of-the-art Simulation-Based Design to novel Optimisation-Based Design of complex electromagnetically-driven industrial products. This new design philosophy will first enable automatic, physics-governed re-siz ...
Voir le projet

 4

 TERMINÉ 
Description Developing "human-centric" technology for industrial robots Robots for industrial production still need a lot of skilled engineering effort for installation, setup and programming. They also require closed-ended environments, with physical protection devices to separate them from human ...
Voir le projet

 8

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 

HIGHER-EFFICIENCY ENGINE WITH ULTRA - LOW EMISSIONS FOR SHIPS (HERCULES-B)

Date du début: 1 sept. 2008, Date de fin: 31 déc. 2011,

"The project HERCULES-B is the Phase II of the HERCULES programme, conceived in 2002 as a 7-year strategic R&D Plan, to develop the future generation of optimally efficient and clean marine diesel powerplants. The project is the outcome of a joint vision by the two major European engine manufacturer Groups, MAN Diesel and WARTSILA, which together hold 90% of the world’s marine engine market. The r ...
Voir le projet

 32

 TERMINÉ 
Society is increasingly dependent on the proper functioning of the electric power system, which in turn supports most other critical infrastructures: water and sewage systems; telecommunications, internet and computing services; air traffic, railroads and other transportation. Many of these other infrastructures are able to operate without power for shorter periods of time, but larger power outage ...
Voir le projet

 10

 TERMINÉ 

MAN-MACHINE-ORGANISATION THROUGH INNOVATIVE ORIENTATIONS FOR NUCLEAR (MMOTION)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2011,

MMOTION is a support action answering the call EURATOM-Fission-2007-2.1.4 targeting a better understanding of Man-Machine-Organization in the operation of nuclear installations. The objective of MMOTION is to analyse the current situation and the future trends concerning MMO and safety related aspects, and to propose an European research road map for the period 2010-2015 to comprehensively addres ...
Voir le projet

 11

 TERMINÉ 

Quality Impact Prediction for Evolving Service-Oriented Software (Q-ImPrESS)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

The Q-ImPrESS project aims at bringing service orientation to critical software systems, such as industrial production control, telecommunication and critical enterprise applications. All these domains share a need for guaranteed end-to-end quality of service, but also a need to evolve over their long lifetimes. The Q-ImPrESS project targets this challenge by providing a method to allow developers ...
Voir le projet

 8

 TERMINÉ 

European network for the Security of Control and Real-Time Systems (ESCoRTS)

Date du début: 16 juin 2008, Date de fin: 15 déc. 2010,

ESCoRTS is a joint endeavour among EU process industries, utilities, leading manufacturers of control equipment and research institutes, under the lead of CEN, to foster progress towards cyber security of control and communication equipment in Europe. ESCoRTS will be intersectoral, embracing the following industrial fields: power, gas, oil, chemicals and petrochemicals, pharmaceuticals, manufactur ...
Voir le projet

 12

 TERMINÉ 
The EQUAL-CLASS project focussed on qualifications in the field of mechatronics/electrical engineering, which can be achieved in higher non-university VET institutions or comparable institutions in the following countries: AT, CH, DE, LT, PT. Therefore, the EQUAL-CLASS project, as a Transfer of Innovation project, aimed to transfer the methodology developed in the previous ZOOM project.ZOOM develo ...
Voir le projet

 21