Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"The Laboratory of Geodesy and Geomatics in the Technical University of Crete, Greece, is located in the less advanced region of Crete, but it is a dynamic and developing scientific entity on a European and international scale. Its primary research activities are on the Global Navigation Satellite Systems, satellite geodesy and deformation monitoring, quality control algorithms and software for g...
Voir le projet

 1

 TERMINÉ 

Innovative Integrated Training in Healing Plants Business

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Farming is important for the EU's natural environment, as around half the EU's land is farmed (82.2% in Greece, 81 % in Bulgaria, 87% in Romania, and 80% in Spain). The economic importance of the sector is therefore significant and can enhance its competitiveness by overcoming its structural, limitations. Thus comparative advantage of the cultivation of aromatic and medicinal plants, known for the...
Voir le projet

 5

 TERMINÉ 

I R I S

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

J.The IRIS -Project came to exist out of the desire of Tabora vzw and its partners to set an international network for exchange and cooperation in order to strengthen, broaden and deepen their knowledge of, insight in and application of methodologies that allow them to empower, educate and activate their youngsters in a more effective way so that they can discover, develop and deploy their skills ...
Voir le projet

 7

 TERMINÉ 

Poznajemy europejskie standardy wymagane w zawodzie

Date du début: 22 déc. 2014, Date de fin: 21 déc. 2015,

The summary of the project The project called ,,Get familiar with the European standards required in different professions” was aimed to the students from Non-public Technical School in Kozienice being taught in Information Technology profession. Bulgaria-Gateway - the institution having a great experience in organizing such projects was our partner organization. The objectives of the project we...
Voir le projet

 2

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

In administering the project, sector "International Integration" aims to further strengthen the interest in the program. “Erasmus +" at the Technical University - Sofia is available to any student who meets the university's internal rules without viewing, social status, gender, age, religion and others. Regularly held "information days" of explaining the program's activities, give presentations, d...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

The Ecole de Chaillot, training department of the Cité de l'Architecture et du Patrimoine, has extensive experience in the training of architects who wish to specialize in heritage. The School has developed cooperation with universities and training institutes in other countries wishing to benefit from this experience by welcoming teachers from the Ecole de Chaillot in their own training. Thus, a ...
Voir le projet

 1

 TERMINÉ 
Its main activities are in the field of technology transfer of competitive research products from the research institutions to SMEs. The technology transfer completing is based on the expertise of researchers and scientists leading in their technology field. The other two partners – Agency for Economic Development Kostinbrod (AEDK) and University faculties of Machinery and … are stable professiona...
Voir le projet

 4

 TERMINÉ 

Sustainable Management for European Local Ports (SuPorts)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

This project will help smaller ports and the local authorities managing them to address environmental issues. Most EU ports are small ports often combining shipping, fishing and leisure activities. Despite their small size they have important economic, social and environmental links with their surroundings. Together, the thousands of European local ports have a large cumulative impact. They face e...
Voir le projet

 11

 TERMINÉ 

Geothermal & Solar Skills in Continuous Vocational Education and Training

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The EU's strategy for sustainable growth, Europe 2020, puts innovation and green growth at the heart of its blueprint for competitiveness. Indeed, it has set clear objectives in terms of energy sustainability, the 20-20-20 targets . Moreover, according to the EU Directive 2010/31/EU on the Energy Performance Buildings, all new buildings by the year 2020 will have to be nearly zero energy buildings...
Voir le projet

 15

 TERMINÉ 

Smart Automation of Rail Transport (SMART)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

SMART main goal is to increase the quality of rail freight, as well as its effectiveness and capacity, through the contribution to automation of railway cargo haul at European railways.In order to achieve the main goal, SMART will deliver the following measurable objectives:• complete, safe and reliable prototype solution for obstacle detection and initiation of long distance forward-looking braki...
Voir le projet

 5

 TERMINÉ 
The CryoHub innovation project will investigate and extend the potential of large-scale Cryogenic Energy Storage (CES) and will apply the stored energy for both cooling and energy generation. By employing Renewable Energy Sources (RES) to liquefy and store cryogens, CryoHub will balance the power grid, while meeting the cooling demand of a refrigerated food warehouse and recovering the waste heat ...
Voir le projet

 14

 TERMINÉ 

MicroElectronics Cloud Alliance

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

mCloud Alliance brings together 18 higher education institutions (HEIs) and small and medium enterprises (SMEs) to develop Cloud-based European infrastructure and organisation for education in microelectronics providing a range of open educational resources (OERs), remote access and sharing of educational and professional software, remote and practice-based learning facilities. Neither university ...
Voir le projet

 18

 TERMINÉ 

An Adaptive Trust-based e-assesment System for Learning (TeSLA)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Although online education is a paramount pillar of formal, non-formal and informal learning, institutions may still be reluctant to wager for a fully online educational model. As such, there is still a reliance on face-to-face assessment, since online alternatives do not have the deserved expected social recognition and reliability. Thus, the creation of an e-assessment system that will be able to...
Voir le projet

 19

 TERMINÉ 

Development of two cycle innovative curricula in microelectronic engineering

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

The project consist of 16 universities: four from program countries PL, DE, BG and IT; four from KZ, four from AM, four from IL; two stakeholders of related field: 1-from KZ and 1-from IL and spin-off company- ECM from DE. The overall objectives of the proposal are: To support the modernisation of the higher education (HE) in microelectronics in the targeted Universities in AM, KG and IL through ...
Voir le projet

 17

 TERMINÉ 

FRESH - Find Researchers Everywhere and SHare (FRESH)

Date du début: 1 juin 2016, Date de fin: 31 janv. 2018,

FRESH (Find Research Everywhere and SHare) is led by the Center for Research and Analysis with 13 partners and 5 associated partners. The Consortium includes Bulgaria’s first technological park, a chamber of industry and commerce, a pan-European organisation, leading research organisations, academia, and media. The aim is to create a series of participatory and media events to promote research car...
Voir le projet

 13

 TERMINÉ 

I.D.E.AZIONE - Individual Development Environments

Date du début: 1 juin 2016, Date de fin: 31 oct. 2017,

The Consortium proposing the project ‘I.D.E.Azione’ is composed by Vocational and Technical Secondary Schools, together with the representatives of the labour market and the Chamber of Commerce, that share their concern on the difficult social-economic and occupational situation of the territory among which they operate. The area of reference, which is between the cities of Venice and Rovigo, ha...
Voir le projet

 14

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Integrating E-Learning and Open Educational Resources into Classroom

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

In the last decade great efforts have been made to integrate ICT in the educational process. But it has not been carried out with the desired dynamics. The most important reasons for that include: lack of digital learning content, insufficient training of teachers and lack of desire and motivation to follow and use the latest technologies and methodologies for e-learning. Besides these, the lack o...
Voir le projet

 6

 TERMINÉ 

Innovative ICT Solutions for the Societal Challenges

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

Fast proliferation of information and communication technologies (ICT) caused certain negative side effects for society (e.g., increased energy usage or CO2 emmisions). However, "innovation in ICT"and especially "innovation with ICT" offer potential solutions for some of the biggest societal challenges (e.g., reports "Smart 2020" and "Smarter 2020" by Global e-Sustainability Initiative). These are...
Voir le projet

 11

 TERMINÉ 

Develop, Evaluate and Safe Knowledge - Knowledge Continuity in Vocational Education

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

The new workplace of VET-teachers has changed their roles and their relationships with learners. As a consequence their professional identity has shifted from institute-based and teaching-focused to a much more learner-oriented delivery of topics in diverse environments. Initiatives to improve nat. VET-systems have occurred in the light of globalization of economy and culture and the shift in bala...
Voir le projet

 8

 TERMINÉ 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1...
Voir le projet

 29

 TERMINÉ 

eWall for Active Long Living (eWALL)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Description eWALL will be an affordable, easy-to-install prefabricated wall that can be mounted on an existing wall and includes all the ICT needed to enable a number of services for the senior citizen to cover major challenges in Active and Healthy Ageing. The project will carry out high-risk and multi-disciplinary research and will have a ...
Voir le projet

 14

 TERMINÉ 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be...
Voir le projet

 28

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the...
Voir le projet

 116

 TERMINÉ 

Technology Transfer in Computing Systems (TETRACOM)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The mission of the TETRACOM Coordination Action is to boost European academia-to-industry technology transfer (TT) in all domains of Computing Systems. While many other European and national initiatives focus on training of entrepreneurs and support for start-up companies, the key differentiator of TETRACOM is a novel instrument called Technology Transfer Project (TTP). TTPs help to lower the barr...
Voir le projet

 33

 TERMINÉ 
"In order to gauge its significance, conceptual change in the study of borders must be seen in relation to fundamental social, economic and geopolitical transformations that have taken place in the past decades. In addition, major paradigmatic shifts in scientific debate, and in the social sciences in particular, must also be considered. Recognising the close interrelationships between social chan...
Voir le projet

 20

 TERMINÉ 
MOSAIC will address two very specific aspects linked to the prediction of risk of developing diabetes (type 2 and gestational) and complications associated to diabetes. These objectives respond to a widely recognized problem related to diabetes management and have the potential to have a major impact in the way diabetes is currently diagnosed and followed in Europe.\nThe MOSAIC consortium counts w...
Voir le projet

 11

 TERMINÉ 

Large Scale Industrial Structural Optimisation for Advanced Applications (LaSciSO)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The overall goal of LaScISO (Large Scale Industrial Structural Optimisation for Advanced Applications) is to enhance structural optimisation methods to be capable of optimisation with current industrial state-of-the-art simulation techniques, i.e. to “optimize what can be simulated”. This requires a tight cooperation between leading research institutions and industry within the fields of numerical...
Voir le projet

 4

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu...
Voir le projet

 42

 TERMINÉ 
"The main objectives of the INDECT project are: • to develop a platform for: the registration and exchange of operational data, acquisition of multimedia content, intelligent processing of all information and automatic detection of threats and recognition of abnormal behaviour or violence, • to develop the prototype of an integrated, network-centric system supporting the operational activities of ...
Voir le projet

 18

 TERMINÉ 

Distributed Energy Resources Research Infrastructure (DERRI)

Date du début: 1 sept. 2009, Date de fin: 31 déc. 2013,

DERRI has as its primary objective the further integration of the European Distributed Energy Re-sources research community through the provision of User Access to a unique portfolio of important European Laboratories in the field of Distributed Energy Resources, focusing mainly system and architectural aspects of smart energy network based on Distributed Generation.
Voir le projet

 18

 TERMINÉ 

Environment NCPs cooperating to improve their effectiveness (ENV-NCP-TOGETHER)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2013,

"National Contact Points (NCPs) hold a key role in communication with the European Commission concerning executive matters and the scientific community. The quality of proposals submitted, for example, relies partially on an effective NCP network. This project is a set of coherent activities and tasks that will foster further cooperation between Environment NCPs from EU member States and Associate...
Voir le projet

 31

 TERMINÉ 

New MS Linking for an Advanced Cohesion in Euratom Research (NEWLANCER)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2013,

"NEWLANCER project proposes to identify and implement effective and efficient actual solutions leading to enlarged NMS involvement in future Euratom Framework Programmes by strengthening and catalyzing the full R&D potential at national level, by increasing cohesion between New Member States institutions, and by improving their cooperation with Old Member States research centres.The specific sub-o...
Voir le projet

 19

 TERMINÉ 

Severe Accident Research Network of Excellence 2 (SARNET2)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order...
Voir le projet

 45

 TERMINÉ 
SYNER-G is research project which has the following main goals: (1) To elaborate appropriate, in the European context, fragility relationships for the vulnerability analysis and loss estimation of all elements at risk, for buildings, building aggregates, utility networks (water, waste water, energy, gas), transportation systems (road, railways, harbors) as well as complex medical care facilities (...
Voir le projet

 14

 TERMINÉ 
"Wake vortex and wind shear are major causes of accidents and injury to passenger and crew of all aircraft types. There has been little protection and the main way of mitigating accidents has been to have mandatory separation times that affect the operating performance of airports. The objective of GREEN-WAKE is to develop and validate innovative technologies that will detect the Hazards and thus...
Voir le projet

 14