Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Closed Loop Wind Farm Control (CL-Windcon)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Current practice in wind turbines operation is that every turbine has its own controller that optimizes its own performance in terms of energy capture and loading. This way of operating wind farms means that each wind turbine operates based only on the available information on its own measurements. This gets the wind farm to operate in a non-optimum way, since wind turbines are not operating as pl ...
Voir le projet

 15

 TERMINÉ 
In traditional models of manufacturing, the information flow from product design, over production processes, to the manufactured product has been strictly unidirectional. The production equipment “blindly” executes tasks that have no direct relationship to the concepts that are present in the original design models and the product is used with little or no feedback concerning product use patterns. ...
Voir le projet

 7

 TERMINÉ 

Virtual Factory Open Operating System (vf-OS)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The primary outcomes of vf-OS are an:- Open Operating System (vf-OS) and Software Development Kit (OAK) for Factories of the Future that aims to be the reference system software for collaborative manufacturing and logistics processes including its associated resources and data- Open vf-OS Platform, including a Multi-sided application marketplace and development studio, that aims to become the Apps ...
Voir le projet

 14

 TERMINÉ 
The general goal of the Project is to reach an efficient, modular and lightweight electromagnetic induction based ice protection system, which uniformly heats the wing leading edge surface. One of the main objectives of the induction based ice-protection system is to achieve at least a 95% heating efficiency. In addition to efficiency, ice-protection system speed is essential in order to act on ti ...
Voir le projet

 1

 TERMINÉ 

Critical Infrastructure Protection using Adaptive MILS (CITADEL)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

Critical infrastructures (CI) rely on complex safety- and security-critical ICT systems placed into unpredictable environments and forced to cope with unexpected events and threats while exhibiting safe adaptive behavior. Recent security trends stress continuous adaptation to increase attacker work factor and to confound reverse-engineering. Critical CI systems must undergo extensive and costly sc ...
Voir le projet

 14

 TERMINÉ 

Safe and secure mixed-criticality systems with low power requirements (SAFEPOWER)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Critical Real-Time Embedded Systems (CRTES) such as railway, aerospace, automotive and energy generation systems face a disruptive challenge caused by the massive irruption of mixed-criticality systems based on multicore processors. At the same time low-power is an intensifying demand in many market segments, a competitive advantage for CRTES that have to operate with limited energy (e.g., batter ...
Voir le projet

 9

 TERMINÉ 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Voir le projet

 18

 TERMINÉ 

Advanced Training and Research in Energy Efficient Smart Structures (ANTARES)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2018,

Smart mechatronic structures of the future will have to be extremely energy efficient and self-powering in as many situations as possible. In addition to capabilities such as sensing and reacting to their environment in a predictable and desired manner, the next generation of smart structures will have to exhibit top class energy efficiency.In the context of the proposed ANTARES project (Advanced ...
Voir le projet

 9

 TERMINÉ 
SAFE4RAIL will provide the baseline for a fundamentally simplified embedded computing and networked TCMS platform, for modular integration and certification of all safety-, time- and mission-critical train functions, including distributed hard real-time controls, safety signals and functions up to SIL4. The generic embedded platform architecture provided by SAFE4RAIL will allow mixed-criticality i ...
Voir le projet

 11

 TERMINÉ 
The key objective of PowerBase “Enhanced substrates and GaN pilot lines enabling compact power applications” is to ensure the availability of Electronic Components and Systems (ECS) for key markets and for addressing societal challenges, aiming at keeping Europe at the forefront of the technology development, bridging the gap between research and exploitation, creating economic and employment grow ...
Voir le projet

 40

 TERMINÉ 

Cyber Physical System based Proactive Collaborative Maintenance (MANTIS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Voir le projet

 47

 TERMINÉ 

Smart Access to Manufacturing for Systems Integration (SMARTER-SI)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

Over the last decade, development of Smart Systems Integration (SSI) has demonstrated tremendous benefits in terms of enabling new functionalities of diverse products contributing to enormous economic potential with annual efforts in Europe estimated at approx.10 b€. There is significant opportunity for innovative SME’s to further exploit SSI as they are ideally placed to commercialise and drive t ...
Voir le projet

 15

 TERMINÉ 
Uncertainty is intrinsic in Cyber-Physical Systems (CPSs) due to novel interactions of embedded systems, networking equipment, cloud infrastructures, and humans. CPSs have become predominant in critical domains and necessitate the implementation of proper mechanisms to deal with uncertainty during their operation at an acceptable cost avoiding unwarranted threats to its users and environment. One ...
Voir le projet

 9

 TERMINÉ 

GateOne - Innovation Service for European Smartization by SMEs (GateOne)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

GateOne’s mission is to accelerate smart systems adoption by European SMEs in facilitating their access to advanced technologies for the development of innovative and smart solutions. GateOne offers Innovation as a Service to the benefit of SMEs in structuring a complete and adapted innovation chain to contribute to the Smartization of Europe. The concept is based on an innovative and pragmatic ap ...
Voir le projet

 12

 TERMINÉ 

Cloud Collaborative Manufacturing Networks (C2NET) (C2NET)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The goal of C2NET Project is the creation of cloud-enabled tools for supporting the supply network optimization of manufacturing and logistic assets based on collaborative demand, production and delivery plans. C2NET Project will provide a scalable real-time architecture, platform and software to allow the supply network partners: to master complexity and data security of the supply network, to st ...
Voir le projet

 22

 TERMINÉ 
The ROLL2RAIL project aims to develop key technologies and to remove already identified blocking points for radical innovation in the field of railway vehicles, as part of a longer term strategy to revolutionise the rolling stock for the future.The high level objectives of the work are to pave the way to:• Increase the capacity of the railway system and bring flexibility to adapt capacity to deman ...
Voir le projet

 34

 TERMINÉ 

Distributed REal-Time Architecture for Mixed Criticality Systems (DREAMS)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The objective of DREAMS is to develop a cross-domain architecture and design tools for networked complex systems where application subsystems of different criticality, executing on networked multi-core chips, are supported.DREAMS will deliver architectural concepts, meta-models, virtualization technologies, model-driven development methods, tools, adaptation strategies and validation, verification ...
Voir le projet

 16

 TERMINÉ 

Resource and Energy Efficient Manufacturing (REEMAIN)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

REEMAIN combines cutting edge knowledge and experience from production processes, professional energy simulation, energy and resource planning, and renewable energy and storage to develop and demonstrate a methodology and platform for the boost, of efficiency resources.Based on the knowledge of who are the energy consumers in manufacturing REEMAIN offers 3 solutions. 1) Innovation in technologies ...
Voir le projet

 18

 TERMINÉ 

NAPES - Next Generation Analytical Platforms for Environmental Sensing (NAPES)

Date du début: 1 déc. 2013, Date de fin: 31 mai 2017,

GOALS:The current state-of-the-art for autonomous environmental instruments monitoring the chemical and biological status of our water is based on flow systems that employ conventional approaches to sample/liquid handling, which makes them prohibitively expensive (often >€20K per unit) in terms of up-scaling deployments. This project will investigate ways to deliver revolutionary advances in liqui ...
Voir le projet

 10

 TERMINÉ 

A New GEnetic LABoratory for non-invasive prenatal diagnosis (ANGELab)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2017,

This project will develop a family of In-Vitro Diagnostic Systems that will transfer for the first time novel Non Invasive Prenatal Diagnostic (NIPD) methods in tube to a LabonaChip format. This family will consist of three research systems chosen to cover all prenatal diagnosis models:- ANGELAB1. This system will use a LabonaChip to extract fetal DNA from the mother´s plasma based on differences ...
Voir le projet

 16

 TERMINÉ 

A CANcer Development mOnitor (CanDo)

Date du début: 1 janv. 2014, Date de fin: 28 févr. 2017,

Through further development, integration and validation of micro-nano-bio and biophotonics systems from previous projects CanDo will develop an instrument that will permit the identification and concentration determination of rare cells in peripheral blood for two key societal challenges, early and low cost anti-cancer drug efficacy determination and cancer diagnosis/monitoring.A cellular link bet ...
Voir le projet

 10

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Energy efficiency Management for Vehicles and Machines (EMVEM)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

In view of reducing the ecological footprint of machines and vehicles, effective and efficient analysis techniques and adequate measurement technologies are required to produce world-leading products with a high energy-efficiency, without compromising functionality/safety/performance/etc. Combined with the increasing trend towards virtual design and prototyping, to reduce costs and development tim ...
Voir le projet

 13

 TERMINÉ 

Efficient, large-area arbitrary shape solar energy (ArtESun)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The ArtESun project combines the multidisciplinary and complementary competences of top-level European research groups and industries in order to make significant steps towards high-efficiency >15%, stable and cost efficient OPV technology. For this purpose, the project objectives are set to make break-through advances in the state of the art in terms of (i) the development of innovative high effi ...
Voir le projet

 13

 TERMINÉ 
In the next decade, EU industries developing Critical Real-Time Embedded Systems (CRTES) (safety, mission or business critical) will face a once-in-a-life-time disruptive challenge caused by the transition to multicore processors and the advent of manycores, tantamount to complex networked systems. This challenge brings the opportunity to integrate multiple applications onto the same hardware plat ...
Voir le projet

 11

 TERMINÉ 
A lifetime of 4000 cycles at 80 % DOD and an energy density of 250 Wh/kg is a target for automotive batteries. The Batteries2020 project takes several steps to increase lifetime and energy density of large format lithium ion batteries towards these goals. Our approach is based on three parallel strategies: 1) highly focused materials development; 2) understanding ageing and degradation phenomena; ...
Voir le projet

 9

 TERMINÉ 
The proposed EXPRESS CA responds to ICT-2013.3.3-b (iv) 'Supporting the development of an ecosystem for smart systems integration in Europe'. In this context, ecosystem is defined as a sustaining environment to promote economic growth, skills growth, and growth in industrial capability and global competitiveness, fuelled by the extension of knowledge, the ambitions of innovators and the business a ...
Voir le projet

 11

 TERMINÉ 

Scalable Modelling and Model Management on the Cloud (MONDO)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

As Model Driven Engineering (MDE) is increasingly applied to larger and more complex systems, the current generation of modelling and model management technologies are being pushed to their limits in terms of capacity and efficiency, and as such, additional research is imperative in order to enable MDE to remain relevant with industrial practice and continue delivering its widely recognised produc ...
Voir le projet

 10

 TERMINÉ 

Multi-cores Partitioning for Trusted Embedded Systems (MultiPARTES)

Date du début: 1 sept. 2011, Date de fin: 31 déc. 2014,

Growing complexity of applications makes the integration of security and dependability an issue in many domains (e.g. energy supply, transportation, industrial control, aerospace, etc). The engineering of embedded systems needs to take these aspects into account. However, guaranteeing security and dependability in a situation of increasing system complexity is leading to unacceptable development c ...
Voir le projet

 10

 TERMINÉ 

Efficient, low-cost, stable tandem organic devices (X10D)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

X10D aims to enable organic photovoltaics (OPV) to enter the competitive thin-film PV market. It will achieve this by pooling the knowledge and expertise of the leading research institutes and start-up companies in Europe, and is the first project of its kind to leverage this knowledge irrespective of the processing technology. It will use the strengths available in device efficiency and architect ...
Voir le projet

 20

 TERMINÉ 
The overall objective of the FC-DISTRICT project is to optimize and implement an innovative energy production and distribution concept for sustainable and energy efficient refurbished and/or new “energy autonomous” districts exploiting decentralized co-generation coupled with optimized building and district heat storage and distribution network. The concept is based on dynamic heat exchange betwee ...
Voir le projet

 23

 TERMINÉ 

Robust Advanced Materials for metal Supported SOFC (RAMSES)

Date du début: 1 janv. 2011, Date de fin: 31 mai 2014,

"The RAMSES project aims at developing an innovative high performance, robust, durable and cost-effective Solid Oxide Fuel Cell based on the Metal Supported Cell concept i.e. the deposition of thin ceramic electrodes and electrolyte on a porous metallic substrate. Both planar and tubular cells will be developed. By considering advanced materials tailored for this cell design, such cells will be ab ...
Voir le projet

 10

 TERMINÉ 

Implementation of Research and Innovation on \nSmart Systems Technologies (IRISS)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2013,

Europe benefits from leadership across a breadth of industries including automotive, avionics, ICT, medical equipment and industrial automation. Incorporated Smart Systems, including smart components (and in the future MNBS) often provide the key technical features for the competitiveness of products in these sectors.The objectives of IRISS are to hedge and extend competitive advantages of Europea ...
Voir le projet

 16

 TERMINÉ 
Conventional analytical methods often require a large sample volume and complicated time-consuming protocols. The objective of this project is to develop ultra low cost laboratories on chips (LOC) without penalisation in time response, sensitivity or simplicity of use. The user will obtain the test results using a very popular interface (a smartphone) and a set of Labcards and Skin Patches where t ...
Voir le projet

 16

 TERMINÉ 
Processed and poor quality solid fuels produce highly corrosive flue gases that significantly reduce the lifetime of flue liners. Coupled with increased flue gas temperatures from high efficient solid fuel stoves, flue liners are failing to reduce serious chimney fires. The Intelli-Flue solution will address the issue of highly corrosive flue gases and elevated flue gas temperatures by developing ...
Voir le projet

 9

 TERMINÉ 
We the SME AGs, represent the European SMEs involved in the design, manufacture and installation of heating, hot water and renewable energy systems (RES). Increasing the uptake of RES is crucial if Europe is to achieve ambitious energy and emission reduction targets. However, despite steep increases in energy prices the uptake of domestic RES is still very limited. The initial investment required ...
Voir le projet

 14

 TERMINÉ 
The objective of TERESA is to define, demonstrate and validate an engineering discipline for trust that is adapted to resource constrained embedded systems. We define trust as the degree with which security and dependability requirements are met.Resource constrained embedded systems are characterized as follows:•\tThey belong to different application sectors•\tComputing resource are mostly statica ...
Voir le projet

 6

 TERMINÉ 
In SelfPOCNAD, we propose to develop an industrial prototype for a rapid (“same day”) Cervical Cancer screening of self-taken patient samples. The industrial prototype will only include enough sample from the self-taken sample in order not to risk any clogging of the sample preparation chip. The first industrial prototype will include the detection of oncogenic E6/E7 mRNA from in total 9 HPV types ...
Voir le projet

 8

 TERMINÉ 

Small Scale Solar Cooling Device (ALONE)

Date du début: 1 oct. 2008, Date de fin: 30 nov. 2012,

Solar cooling technologies use solar thermal energy provided through solar collectors to power thermally driven cooling machines. Cooling demand is rapidly increasing in many parts of the world: the combination of solar thermal and cooling has a high potential to replace conventional cooling machines based on electricity and depleting refrigerants. However, while larger solar cooling systems have ...
Voir le projet

 8

 TERMINÉ 
More than 40% of the total energy consumed in the EU is used to cover the needs for heating, cooling and electricity of buildings. As the major part of this energy is produced from combustion of oil and natural gas, both the EU and the EU Building Sector are highly depended on imported fossil fuels. Moreover, the Sector is also a major contributor to Green-House Gas (GHG) emissions. To address iss ...
Voir le projet

 19