Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

The Genus Haslea, New marine resources for blue biotechnology and Aquaculture (GHaNA)

Date du début: 1 mars 2017, Date de fin: 28 févr. 2021,

The GHaNA project aims to explore and characterize a new marine bioresource, for blue biotechnology applications in aquaculture, cosmetics and possibly food and health industry. The project will determine the biological and chemical diversity of Haslea diatoms to develop mass-scale production for viable industrial applications by maximising biomass production and associated high-value compound pro ...
Voir le projet

 11

 TERMINÉ 
The demand for larger and more interconnected software systems is constantly increasing, but the ability of developers to satisfy it is not evolving accordingly. The most limiting factor is software validation, which typically requires very costly and complex testing processes. This project aims at significantly improving the efficiency and effectiveness of the testing process and, with it, the ov ...
Voir le projet

 11

 TERMINÉ 

Secure Management Platform for Shared Process Resources (SHAREBOX)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

To pave the way forward for IS as a solution for more efficient processing and energy systems for the process industry, we will develop a secure ICT platform (SHAREBOX) for the flexible management of shared process resources that will provide plant operations and production managers with the robust and reliable information that they need in real-time in order to effectively and confidently share r ...
Voir le projet

 17

 TERMINÉ 

Intelligent Hybrid Thermo-Chemical District Networks (H-DisNet)

Date du début: 1 juin 2016, Date de fin: 31 mai 2019,

The innovative thermo-chemical (TC) network technology of H-DisNet will contribute to next-generation district energy networks. The technology will exploit high chemical potential of absorption processes for loss-free transport and storage of energy potential. It will be applied to form an intelligent district network with thermal, electric and gas networks. This intelligent thermo-chemical distri ...
Voir le projet

 7

 TERMINÉ 
The XoSoft project will develop a modular soft lower-limb exoskeleton to assist people with mobility impairments. The consortium includes 5 research groups and 3 companies each with EU project experience in exoskeleton/assistive orthoics development. XoSoft, a class I medical device, assists people with low to moderate levels of reduced mobility, enabling them to remain active performing tasks of ...
Voir le projet

 9

 TERMINÉ 
The Process Industries require a high degree of automation, monitoring, and advanced simulation and control for their often complex manufacturing processes and operations. Emphasis is on continuous or batch production, mixing, reaction and separation of materials of higher value. Indeed, increased globalisation and competition are drivers for process analytical technologies (PAT) that enable seaml ...
Voir le projet

 18

 TERMINÉ 

Bringing FIWARE to the NEXT step (FI-NEXT)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2018,

Digital technologies underpin innovation and competitiveness across a broad range of market sectors. A key technology to boost such innovation and competitiveness is represented by the full and wide adoption of Open Service Platforms. In fact, they will allow increased competition and market penetration because they should be built on top of royalty-free open specifications, adopting open source r ...
Voir le projet

 16

 TERMINÉ 

Integrierte Lese- und Schreibförderung im Fachunterricht der beruflichen Bildung

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

CONTEXT/BACKGROUND OF THE PROJECT Reading and writing skills are not only important requirements for participating in professional and social life, but are also the basis for taking part in democratic society. Poor language abilities can cause school and work dropouts and result in unequal opportunities, poverty and social exclusion. This project, which works towards the integrative promotion of r ...
Voir le projet

 9

 TERMINÉ 
IbD® will create a holistic platform for facilitating process intensification in processes in which solids are an intrinsic part, the cornerstone of which will be an intensified-by-design® (IbD). The IbD approach is hinged on the use of robust data about a process to ‘redesign’, modify, adapt and alter that process in a continuous, intensified system, and will be the new paradigm in the intensific ...
Voir le projet

 23

 TERMINÉ 

Measurement and Architecture for a Middleboxed Internet (MAMI)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

Recent revelations about large-scale pervasive surveillance of Internet traffic have led to a rapidly expanding deployment of encryption in order to protect end-user privacy. At the same time, network operators and access providers rely on increasing use of in-network functionality provided by middleboxes and network function virtualization (NFV) approaches to improve network operations and manage ...
Voir le projet

 7

 TERMINÉ 
The DROPSA consortium will create new knowledge and understanding of the damage and losses of fruit crops resulting from pests and pathogens, with a specific focus on the new and emerging threats due to Drosophila suzukii and quarantine pathogens Pseudomonas syringae, Xanthomonas fragariae and X. arboricola. The project will deliver a cost effective approach that can be widely implemented by the E ...
Voir le projet

 27

 TERMINÉ 

Small cEllS coordinAtion for Multi-tenancy and Edge services (SESAME)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

SESAME targets innovations around three central elements in 5G: the placement of network intelligence and applications in the network edge through Network Functions Virtualisation (NFV) and Edge Cloud Computing; the substantial evolution of the Small Cell concept, already mainstream in 4G but expected to deliver its full potential in the challenging high dense 5G scenarios; and the consolidation o ...
Voir le projet

 21

 TERMINÉ 
"The objective of BIOCOMES is to develop 11 new biological control agents (BCAs) for key markets in European agriculture and forestry. BCAs were identified through market analysis by six manufactures of biological control products. BCAs will primarily be for use in open field crops of vegetables (3), of which 2 are also for use in protected crops, arable crops (3), fruit crops (3), and three diffe ...
Voir le projet

 27

 TERMINÉ 

Optimised food products for elderly populations (OPTIFEL)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

Optilfel has as its ultimate goal to contribute to elders’ health by combating denutrition due to both physical capacities diminution and appetite loss. The concept of Optifel is to translate the knowledge on nutritional needs, food preferences and physical capacities into accurate specifications for food products and packaging. Food products (including packaging and food serving methods) will the ...
Voir le projet

 29

 TERMINÉ 

EnhAnced Government LEarning (EAGLE)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Public administrations (PA) need to cope with various challenges: new regulations, an aging workforce and the need for adopting their ICT. Technology-enhanced learning (TEL) represents thus a sensible option notably for rural local governments (RLG) that need to keep up with such changing environments, but do have limited ac-cess to training courses.From interviews of a pre-study with RLG in 5 Eur ...
Voir le projet

 10

 TERMINÉ 

Network Functions as-a-Service over Virtualised Infrastructures (T-NOVA)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

Network Functions Virtualisation (NFV) is an emerging concept, which refers to the migration of certain network functionalities, traditionally performed by hardware elements, to virtualized IT infrastructures, where they are deployed as software components. NFV leverages commodity servers and storage, including cloud platforms, to enable rapid deployment, reconfiguration and elastic scaling of net ...
Voir le projet

 19

 TERMINÉ 
Workplace injuries cost European societies up to 4% of GNP. Over 25% of Europeans experience back injury due to work. Robots are traditionally inflexible to use for many manual handling tasks. The world robotics market is set to double to $66Bn pa in the next 15 years. Europe could corner the industrial collaborative human-robotic part of that market (currently Asia). The goal of Robo-Mate is to a ...
Voir le projet

 12

 TERMINÉ 
Despite the ongoing efforts on energy efficiency improvements,, the lower energy consumption per data centre does not compensate the cumulative increasing energy demand, due to the combined action of increasing load density in the computer room and rising digitization of human activities. Hence data centres are consuming increasing amount of energy, with a negative impact on the environment and on ...
Voir le projet

 11

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 
CONCORD advances European Future Internet research and innovation by supporting the successful implementation of the European Commission's Future Internet Public Private Partnership (FI-PPP) Programme. As a Programme Facilitation and Support Action, CONCORD coordinates and facilitates the alignment of FI-PPP activities to ensure the relevance, rigor and robustness of the emerging Future Internet ( ...
Voir le projet

 10

 TERMINÉ 
"This project is to validate a cleaning device capable of clearing out small debris from the leading edges of business jets or airliners, to keep the flow as laminar as possible on the leading edge of the wing. The cleaning concept will be compatible with the surface treatment of the leading edge of commercial aircrafts. Typically this concerns the contamination of leading edges by insect impact. ...
Voir le projet

 4

 TERMINÉ 

Proton Ionization Molecular Mass Spectrometry (PIMMS)

Date du début: 1 juin 2012, Date de fin: 31 mai 2016,

"The need for quantitative and fast identification of trace gaseous compounds in complex chemical matrices continuously pushes the limits of analytical chemistry in many areas of relevance to the EU, including food, health, the environment, and security. A relatively new broad-based and rapidly growing analytical technique, proton transfer reaction mass spectrometry (PTR-MS), combines excellent c ...
Voir le projet

 12

 TERMINÉ 

Boltless assembling Of Primary Aerospace Composite Structures (BOPACS)

Date du début: 1 sept. 2012, Date de fin: 29 févr. 2016,

"The main challenge of the BOPACS project is to reduce the weight and costs of primary aerospace structures by developing bolt free adhesive bonded joints that comply with the airworthiness requirements.Until today thin walled composite primary aerospace structures are joined by using a large number of fasteners. Bolt free joining would considerably contribute to the weight and cost reduction of a ...
Voir le projet

 14

 TERMINÉ 
There is an increasing pressure on European SMEs to deliver high quality, often customised products using cost effective manufacturing processes and systems while competing in the global market. One of the key production processes in high labour cost areas such as Europe is assembly of final products in sectors such as automotive, aerospace, pharmaceutical and medical industries. They all require ...
Voir le projet

 10

 TERMINÉ 

A MEasurement Tool to determine the quality of the Passenger EXperience (METPEX)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

"Public transport is central to people’s lives and well-being, especially vulnerable groups (e.g. less mobile, elderly and disabled). It is essential in providing access to employment, shops, services and leisure. The need to encourage greater public transport use is critical in achieving sustainability targets. For many, the perception and reality of public transport does not encourage use, espec ...
Voir le projet

 18

 TERMINÉ 

eXperimental Infrastructures for the Future Internet (XIFI)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Voir le projet

 38

 TERMINÉ 

International Foresight Academy (IFA)

Date du début: 1 mai 2012, Date de fin: 30 avr. 2015,

"The proposed International Foresight Academy is the first organization to bind together Foresight activities around the globe and from contrasting cultural and political contexts. As the Mapping Report of the European Foresight Monitoring Network (2009) has documented, Foresight is used differently in various regions of the world. Foresight activities vary according to sponsors and customers, met ...
Voir le projet

 7

 TERMINÉ 
METRIC will map regional transport innovation capacity and identify the competitive advantage of identified regions. Based on their strengths, guidelines for the preparation of regional innovation roadmaps (strategy plans) will be developed. METRIC will also explore the regional innovation potential and make recommendations on how to support weak regions. The project will ultimately contribute to ...
Voir le projet

 5

 TERMINÉ 
In Europe, terrorism threatens horrific loss of life, extensive disruption to city transport and damage to commercial real estate. Vehicles provide an ideal delivery mechanism because they can be meticulously prepared well in advance of deployment and then brought in to the Area of Operations. Furthermore, a real and present danger comes from the threat of Chemical, Radiological, Biological and Nu ...
Voir le projet

 6

 TERMINÉ 
"RACE2050 foresight study aims to identify key success factors for a sustainable growth of the European Transport industry and for policies which can increase its strength in a long perspective up to 2050. By integrating the tremendous available foresight intelligence into a comparative synopsis, we will be able to compare and assess various visions and especially different policies to reach these ...
Voir le projet

 7

 TERMINÉ 

REsearch on a CRuiser Enabled Air Transport Environment (RECREATE)

Date du début: 1 août 2011, Date de fin: 31 janv. 2015,

This proposal is all about the introduction and airworthiness of cruiser-feeder operations for civil aircraft. Cruiser-feeder operations are investigated as a promising pioneering idea for the air transport of the future. The soundness of the concept of cruiser-feeder operations for civil aircraft is explained in the proposal, taking air-to-air refuelling operations as an example. A comprehensive ...
Voir le projet

 9

 TERMINÉ 

Cost Effective Reinforcement of Fastener Areas in Composites (CERFAC)

Date du début: 1 oct. 2010, Date de fin: 31 déc. 2014,

"CERFAC’s major challenge is the design and manufacturing of strong and cost-efficient joints for high performance CFRP aero-structures.In particular, transfer of distributed loading along rivets lines in the assembly of flat or curved thin-walled stiffened panels, and introduction of concentrated loads for connecting lugs with thicker laminates are special & frequent problems. Hence, CERFAC focus ...
Voir le projet

 15

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
OLED lighting holds the promise of entering the annual global lighting-fixture market that is estimated between $US 50-90 billion. OLED technology provide an environmentally friendly technology that requires no mercury and can enable energy savings up to 90 % (per lamp socket). Global transition to such efficient lighting sources will dramatically reduce energy.Since the onset of the solid state l ...
Voir le projet

 5

 TERMINÉ 
Long-term stable operation of Solid Oxide Fuel Cells (SOFC) is a basic requirement for introducing this technology to the stationary power market. Degradation phenomena limiting the lifetime can be divided into continuous (baseline) and incidental (transient) effects.This project is concerned with understanding the details of the major SOFC continuous degradation effects and developing models that ...
Voir le projet

 13

 TERMINÉ 

European Clearing House for Open Robotics Development (ECHORD)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Voir le projet

 105

 TERMINÉ 
"OPTIMISM's main outcomes is the creation and development of different sets of strategies and methodologies for optimising passenger transport systems based on co-modality ICT solutions. OPTIMISM also takes into consideration the passenger needs and the carbon-neutral objective. The main scope is to provide a scientifically documented insight of the transport system and people’s travel choices v ...
Voir le projet

 9

 TERMINÉ 
Plants sustainably produce low levels of secondary metabolites of high industrial value. However, they are often too complex to be economically manufactured by chemical synthesis. Advanced metabolic engineering and exploitation of plants as Green Factories has been prevented due to poorly understood metabolic pathways in plants and the regulation thereof. SmartCell brings together 14 leading Europ ...
Voir le projet

 19

 TERMINÉ 
Description Advancing the Evolution and Benchmaking of Multimedia and Multilingual Information SystemMeasuring is a key to scientific progress. This is particularly true for research concerning complex systems, whether natural or human-built. Multilingual and multimedia information systems are increasingly complex: they need to satisfy di ...
Voir le projet

 15

 TERMINÉ 

Smart Catheterization (SCATh)

Date du début: 1 févr. 2010, Date de fin: 31 janv. 2013,

Modern medicine is irreversibly shifting towards less invasive surgical procedures. Conventional open surgery approaches are systematically being replaced by interventions that reduce access trauma and thereby minimise pain and hospitalisation periods for patients. The downside of this approach is that it is highly demanding for the interventionalist, entailing unacceptable risks for the patient. ...
Voir le projet

 9