Rechercher des projets européens

12 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Aggression is a basic physiological trait with important roles throughout evolution, both in defence and predation. When expressed in humans in the wrong context, aggression leads to maladjustment, social impairment and crime. Despite this, knowledge about aggression aetiology is limited and current treatment strategies are insufficient. Contingent to a subdivision into impulsive and instrumental ...
Voir le projet

 27

 TERMINÉ 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Voir le projet

 39

 TERMINÉ 

Engine Module Validators (ENOVAL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Voir le projet

 37

 TERMINÉ 
INTERACTION proposes an evolution in airport operations towards a fully integrated and coordinated management of all the processes-passenger, baggage, freight and ramp operations-which are converging into the aircraft turnaround. The main needs are 3: increase time efficiency in each one of the airport processes and the turnaround itself in a coordinated way; reduce the environmental impact of the ...
Voir le projet

 14

 TERMINÉ 
"The MAPICC 3D project and concept aims at developing manufacturing system for 3D shaped, multilayered products based on flexible materials. The ultimate goals are:> The development of integrated and automated process chain able to produce from hybrid thermoplastic yarn to 3D complex shaped thermoplastic composite structure in single step thermoplastic consolidation process.> The development of fl ...
Voir le projet

 21

 TERMINÉ 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Voir le projet

 35

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
"SUCCIPACK aims to support European industry efforts to introduce biobased polybutylene succinate (PBS) as a new material on the food packaging market. Its main advantage is that it has complementary properties compared to other biobased polymers like polylactic acid. PBS is synthesized by polycondensation of succinic acid and butanediol, both identified as key “building blocks” from renewable res ...
Voir le projet

 20

 TERMINÉ 
The I2C integration project proposes for 2015 a new generation of innovative sea border surveillance system implementing key existing and in development capacities to track all vessel movements to early identify and report on threats associated to detected suspicious events. These key capacities are: *Shore based sensors platform grouping new sensor technologies; long range HFSW radar, FMCW radar ...
Voir le projet

 20

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 

Probabilistically Analysable Real-Time Systems (PROARTIS)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2013,

There is an ever-increasing demand both for new functionality and for reduced development and production costs for all kinds of Critical Real-Time Embedded (CRTE) systems (safety, mission or business critical). Moreover, new functionality demands can only be delivered by more complex software and aggressive hardware acceleration features like memory hierarchies and multicore processors. However, t ...
Voir le projet

 5

 TERMINÉ 
Description The main purpose of this project is the development of the Laser-Induced Forward Transfer (LIFT) process that permits the deposition of a wide variety of materials, with high spatial resolution (a few micrometers) for the manufacturing of electronic devices. It has been successfully applied so far in laboratory-scale trials for t ...
Voir le projet

 18