Rechercher des projets européens

35 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...pected market potential of 60B€ in 2025.Project results will be used to propose standardized validation procedures for highly automated systems (ACPS). The technical objectives addressed are: 1. Provision of a test and validation framework that proves the functionality, safety and security of ACPS with at least 50% less test effort than required in classical testing. 2. Promotion of a new techniqu ...
Voir le projet

 76

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

...evolution. Our program will put Europe firmly at the heart of the process, with a manifold return on the EU investment, both in terms of technological innovation and economic growth.To realise this vision, we have brought together a larger European consortium with about 150 partners in 23 countries. The partners represent academia, research institutes and industries, which work closely together in ...
Voir le projet

 158

 TERMINÉ 
...g disposed of in selective-waste collection, it ends up in landfills or is composted/incinerated with the remnant waste.We have developed SEEGLASS, a high performance optical sorter based on computer vision and a pneumatic rejection system. Our aim is to solve this non-environmentally friendly problem, while also offering our end-users additional revenues with this recovered material, which is not ...
Voir le projet

 1

 TERMINÉ 

Pilot Optical Line for Imaging and Sensing (POLIS)

Date du début: 6 janv. 2014, Date de fin: 6 janv. 2018,

The KET pilot line project POLIS is aimed at maintaining and furthering the innovation capability of CMOS image and optical sensors in Europe. An existing ST CMOS high volume production line, unique in Europe, will serve as the basis of the proposed project. The strategy behind POLIS lies in the development of specific technological modules and to implement them at pilot line level on the existing ...
Voir le projet

 20

 TERMINÉ 
...urized systems and advanced information systems towards an infrastructure for remote, continuous, noninvasive acquisition and advanced processing of multi-parametric data and friendly telecare provision based on serious gaming. It will use embedded electronics (suite and cap) capable of measuring neural, psychological, physiological, and biomechanical parameters, and securely communicating them to ...
Voir le projet

 5

 TERMINÉ 

ABC GATES FOR EUROPE (ABC4EU)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

During the last years, many ABC Gates have been deployed in the main European airports, most of them as pilot projects intended to test their capability to improve the border crossing processes in aspects such as speed, security, automation, false rejection reduction, etc.Experience gained from these pilots has been periodically assessed within the Frontex ABC Workshops, where the need for a harmo ...
Voir le projet

 17

 TERMINÉ 
The mobility project Key Action 1- Learning Mobility of individuals-mobility project for VET learners and staff ”Welcome.WBL @vet.eU"- "Work Based Learning ( WBL) in vocational training for hospitality and hotel management in Europe" , is being proposed by a local partnership consisting of: 1) Istituto Alberghiero IPSSART de Carolis – Spoleto (PG) 2) Istituto Alberghiero IPSSEOASC – Assisi (PG) 3 ...
Voir le projet

 39

 TERMINÉ 

Digital Innovation in Training

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project DIGIT– Digital Innovation in Training – is addressed to 100 students attending the ultimate and pen-ultimate year of secondary school in the Province of Macerata and it aims at strengthening, within their educational and training path, the use of innovative and flexible methodologies, in order to link school preparation with practical activities, through the experience of transnationa ...
Voir le projet

 45

 TERMINÉ 

Dynamic Social and Media Content Syndication for 2nd Screen (SAM)

Date du début: 1 oct. 2013, Date de fin: 31 oct. 2016,

Description The SAM project enables consumers to "socialise around media", via their second screens, where they are fed with relevant digital content created once and fully syndicated to all for maximum impact.Today people use “2nd screen” tablets or smartphones while watching their “1st screen” – typically a TV. They engage in activities ...
Voir le projet

 13

 TERMINÉ 

Flexible fabrication of lightweight aluminium transport structures (FlexiFab)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The Flexi-Fab project aims to develop a flexible FSW welding system capable of automatically fabricating complex structures, in a variety of joint configurations, from a range of aluminium alloy grades and thicknesses used in the transport sector.Flexi-Fab will deliver significant benefits to the metal working and fabrication industry by providing a cost-effective method of fabricating aluminium s ...
Voir le projet

 11

 TERMINÉ 

COgnitive & Perceptive CAMeraS (COPCAMS)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Voir le projet

 25

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
In manufacturing of industrial parts, turning is one of the most important manufacturing processes and is applied mainly by SMEs. However, until today, turning processes suffer from inflexible machine characteristics, as to mention an extreme high amount of needed tool holders and frequent tool changes caused by tool lives of > 3 minutes. In order to raise production flexibility and efficiency sig ...
Voir le projet

 11

 TERMINÉ 
The main aim of the DASH project is to demonstrate the previously developed fully automatic & selective harvesting machine for white and violet asparagus. The SMEs (BZN, STRAUSS, TTC and IMIX) proposing the DASH project build on the excellent results achieved in their recently successfully completed FP 7 ‘Research for the benefits of SMEs’ project AutoSpar (Call Identifier: FP7-SME-2007-1, EC Gran ...
Voir le projet

 5

 TERMINÉ 
...will drive the change of our company’s current license-based model to a Cloud-based service model as part of our plan for growth into new markets worth €300 million over a 4-year period. At ICAR Vision Systems we have spent the last ten years providing our clients –banks, hotels, casinos, telecoms and IKEA, among others– with the technological edge in the automated detection of document fraud. I ...
Voir le projet

 1

 TERMINÉ 
The MobiWeld project will develop a prototype, mobile Friction Stir Welding (FSW) system, which will be designed and constructed for use in final fabrication/assembly in a shipyard environment.It will deliver the following benefits:• Offer a superior method of fabricating aluminium ship panelling – reducing fabrication costs of ships and ship components by €500k for a 2,000 tonne cruise liner• Dev ...
Voir le projet

 9

 TERMINÉ 
"The E-SPONDER is a suite of real-time data-centric technologies which will provide actionable information and communication support to first responders that act during abnormal events (crises) occurring in critical infrastructures. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and ou ...
Voir le projet

 17

 TERMINÉ 
The main problem of harvesting green asparagus is the great need of seasonal workers. Usually between 1.5 and 2.5 workers are needed per ha. The high labour costs and unsatisfying working conditions have created over the last four decades the demand for a partial mechanization of the harvesting process. The increasing labour costs and the lack of in time labour supply have forced the asparagus far ...
Voir le projet

 8

 TERMINÉ 

High-throughput Production of FunctIonal 3D images of the brain (HIGH PROFILE)

Date du début: 1 avr. 2011, Date de fin: 30 juin 2014,

"HIGH PROFILE combines industrial and clinical driven R&D activities dealing with image diagnostic platforms for the central nervous system. The project’s approach is to progress state-of-the-art by integrating imaging equipment for diagnostics –including algorithms, equipment and infrastructure for massive image processing and simulation– to support combinations of images from different medical e ...
Voir le projet

 20

 TERMINÉ 

Energy Efficient and Intelligent Lighting Systems (ENLIGHT)

Date du début: 1 avr. 2011, Date de fin: 1 mars 2014,

The lighting industry is currently going through a radical transformation, driven by both the rapid progress of Solid State Lighting (SSL) and semiconductors technologies, and the changing societal needs like sustainability, energy efficiency and CO2 reduction.Therefore, we have to adapt rapidly by collaborating in a supportive open-innovation eco-system, which can drive research and development t ...
Voir le projet

 30

 TERMINÉ 
...dvanced medical care ending up to chronic conditions and minor disabilities well manageable by home care. This has highlighted shared concerns by regional Governments about implications for future provision of welfare, health services. This demographic change poses significant challenges to Europe’s society and economy.JADE project concept is to develop and promote a Common Research Agenda and Joi ...
Voir le projet

 42

 TERMINÉ 

Future Internet Gateway-based Architecture of Residential Networks (FIGARO)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The Internet has evolved from a technology-centric core network to a user- and content-centric network that must support millions of users creating and consuming content. It must accommodate new services with new requirements and cope with heterogeneous network technologies. The momentum is moving toward the end user who is now capable of creating, storing, and delivering content and services. FIG ...
Voir le projet

 13

 TERMINÉ 
European SMEs which produce high precision parts by means of hard turning are facing a steady loss of competitiveness in their growing markets since existing manufacturing technologies do not fulfil increasing demands on part quality and variety. During the last years the competition has worsen due to up-coming low wages countries outside Europe and an increasing cost pressure. Additionally these ...
Voir le projet

 10

 TERMINÉ 

BIOmimetic Technology for vibrissal ACtive Touch (BIOTACT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

BIOTACT will develop novel biomimetic computational methods and technologies for active touch sensing. The project is inspired by the functionality, morphology, and neural processing architectures of biological sensory systems that use tactile hairs known as whiskers or vibrissae. It will focus on two animals that are tactile specialists--the Norwegian rat and the Etruscan shrew. Both species make ...
Voir le projet

 10

 TERMINÉ 

Understanding interactions between cells and nanopatterned surfaces (NanoScale)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2011,

The study of biological processes occurring at the nanoscale is becoming a new discipline at the border between Physics and Biology with major scientific challenges and new technological applications. In fact, interactions at the nanoscale between cells/neurons and surfaces with specific nanopatterns appear to control several major biological processes, such as cell proliferation and differentiati ...
Voir le projet

 8

 TERMINÉ 
There is considerable demand from industry – both from the asparagus industry and the food retail trade – for the development of new and innovative solutions allowing a gentle, automatic harvesting of asparagus. To meet the requirements, the aim of AutoSpar is the development of a continuous, fully automatic harvesting system for white and violet asparagus. This requires three major new innovative ...
Voir le projet

 9

 TERMINÉ 

High Quality Tube and Pipe Production by Hybrid Welding (HQ-TUBES)

Date du début: 1 août 2008, Date de fin: 31 juil. 2010,

"Hybrid laser-arc welding offers many advantages compared with conventional arc or laser welding. The process does, however require a high level of control if high quality welds are to be produced. This proposal tackles the issues of weld quality and productivity improvement for manufacturing pipes through development of advanced sensors for the hybrid laser-arc welding process. Hybrid process dev ...
Voir le projet

 10

 TERMINÉ 

European Global Border Environment (GLOBE)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2009,

"The GLOBE project will provide a comprehensive framework in which an integrated global border management system must be developed. The project will take into account the current and future technological environment. Additionally, GLOBE’s scope reaches even further by looking into other key aspects of border management beyond isolated technology, such as the legal and political environment, the s ...
Voir le projet

 15

 TERMINÉ 
The project aims at creating a transnational network in the domain of virtual and remote experiments for e-learning based on integration and optimization of existing products (some of them created in the framework of the pilot project “Virtual-Electro-Lab”, RO/01/B/F/PP141024) with the multilateral use of the transnational network capacities. The main target groups are trainers in the field of tec ...
Voir le projet

 12

 TERMINÉ 
The project focuses on training for maritime personnel (working on ships and in ports) and intends to elaborate a competence portfolio of new professions in the sector and disseminate it in order to promote professional mobility. The main aims of the project are: to analyse and address emerging training needs in various aspects of marine transport in the partner countries, with a view to identifyi ...
Voir le projet

 28

 TERMINÉ 
Integrated education and training have need of core competence and core methodology. The objective of this project is therefore the promotion of the continuous training of the target groups, thus improving the service and the system itself. Related activities are the systemic definition through a semantic analysis and description referred to the different national contexts and the identification o ...
Voir le projet

 12

 TERMINÉ 
The project focuses on training for maritime personnel (working on ships and in ports) and intends to elaborate a competence portfolio of new professions in the sector and disseminate it in order to promote professional mobility. The main aims of the project are: to analyse and address emerging training needs in various aspects of marine transport in the partner countries, with a view to identifyi ...
Voir le projet

 11

 TERMINÉ 
The project aims at developing a methodology for the production, assessment, validation of learning objects easily downloadable, structured for didactic purposes, and usable by different target groups, duly supported with directions for use. A small laboratory for testing the learning objects will be created, where a wide range of platforms will be assessed too, in terms of strengths and weaknesse ...
Voir le projet

 21

 TERMINÉ 
The project aims at developing a methodology for the production, assessment, validation of learning objects easily downloadable, structured for didactic purposes, and usable by different target groups, duly supported with directions for use. A small laboratory for testing the learning objects will be created, where a wide range of platforms will be assessed too, in terms of strengths and weaknesse ...
Voir le projet

 9

 TERMINÉ 
The main aim is to contribute to the establishment of a European lifelong learning space, by providing tools and guidelines by which mutual trust between countries and between labour market and educational field is achieved more easily.Background.Experiences from earlier projects tell that Europe-wide agreements on qualification profiles do not always hold when it comes to their implementation as ...
Voir le projet

 20