Rechercher des projets européens

35 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The EOMonDis Project aims to improve the operationality of tropical forest products/services in order to better access the funding for the UNFCCC REDD+ policy which is a large market segment for the EO-industry in Europe. Additionally, national forest policy programmes and Zero Deforestation programmes also require forest monitoring systems with assessment of forest/non-forest information using di ...
Voir le projet

 5

 TERMINÉ 
...isciplinary nature of EDEN ISS combines research in space engineering, horticulture, food science and microbiology. Leading space industries (Thales Alenia Space Italia, Airbus Defense and Space, Telespazio), research organizations (DLR, CNR, AWI), SMEs (Liquifer, Heliospectra, EnginSoft, Aero Sekur) and academia (Wageningen UR, University of Guelph, Limerick Institute of Technology) from six Euro ...
Voir le projet

 13

 TERMINÉ 
The 5G CHAMPION project ambitions to deliver the first 5G system proof-of-concept in conjunction with the 2018 South Korean Winter Olympics. Key novel 5G building blocks will be developed and implemented into a new architectural approach providing an efficient end-to-end system performance encompassing cutting edge 5G radio-access, core-network and satellite technologies.It will be the first time ...
Voir le projet

 10

 TERMINÉ 

Consistently Optimised Resilient Secure Global Supply-Chains (CORE)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2018,

CORE will consolidate, amplify, extend and demonstrate EU knowledge and capabilities and international co-operation for securing supply chains whilst maintaining or improving business performance, with specific reference to key Supply Chain Corridors.CORE will be driven by the requirements of:• the Customs, law enforcement authorities, and other agencies nationally and internationally to increase ...
Voir le projet

 72

 TERMINÉ 

Satellite Technology for Advanced Railway Signalling (STARS)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Voir le projet

 18

 TERMINÉ 

Increase airport capacity, safety and security using European GNSS (e-Airport)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2017,

The main goals of the e-Airport project are:• The development of an airport operations monitor application based on European GNSS to increase the efficiency, safety and security of aircraft services and cargo processes • Application demonstrations in two European airports using EGNOS and Galileo Early services.Eurocontrol statistics indicates that 70 % of all flight delays in Europe are caused b ...
Voir le projet

 8

 TERMINÉ 

Building EGNSS capacitY On EU Neighbouring multimodal Domains. (BEYOND)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2017,

The overall project concept consists of building capacity in the field of multi-modal applications, focussed mainly on aviation using EGNSS in different Eastern European and Mediterranean countries. These countries are located at boundaries of the EGNOS SOL coverage area with limited EGNSS experience; the projects will promote the development of multi-modal applications, building on the lessons le ...
Voir le projet

 19

 TERMINÉ 

ERTMS on SATELLITE – Enabling Application Validation (ERSAT EAV)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2017,

The main ERSAT EAV objective is to verify the suitability of EGNSS (including EGNOS and Galileo early services) for safety railway application, in particular in regional lines scenario, for which a safe localization of the trains, based on satellite technologies, will be defined and developed, leading the way for the harmonization with the European ERTMS standard, by implementing the solution on ...
Voir le projet

 14

 TERMINÉ 
MAGNIFIC project aims to enable the development of EGNSS applications through international cooperation. MAGNIFIC proposes to demonstrate to African Stakeholders the benefits of EGNOS and Galileo in 6 market sectors: airport surface vehicle, flight trials, Oil exploitation, Natural resources, highly secured multi-modal transport and use of secured Maritime transport. These applications have been s ...
Voir le projet

 11

 TERMINÉ 

Joint EUropean Project for International ITS/EGNSS awareness Raising (JUPITER)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

JUPITER aims at EGNSS awareness raising, capacity building and promotion activities for fostering business development of EGNSS based applications worldwide in response to the H2020 societal challenges at stake for mobility and transportation.In order to ensure that EGNSS comes to prominence in the ITS sector, the added value of EGNSS, compared to or in combination with GPS/Glonass/Beidou constell ...
Voir le projet

 11

 TERMINÉ 

Demonstrator of EGNSS Services based on Time Reference Architecture (DEMETRA)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

DEMETRA aims to demonstrate the feasibility of delivering early EGNSS timing services to end users by utilising an operational demonstrator and conducting tests with pilot applications. Based on the current practice of national metrological laboratories, DEMETRA will define and develop a prototype of a European time disseminator, based on EGNSS., An array of important service features that are nec ...
Voir le projet

 14

 TERMINÉ 

European Location As A Service Targeting International Commerce (ELAASTIC)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2016,

...s on supporting the development of downstream European companies working in the sector. The ELAASTIC proposal has been built through collaboration of five global leaders in location technology: Telespazio France, ST-microelectronics, Thales Alenia Space France, Rx Networks, and Novero, three of them listed as major actors in Berg Insight 2013 LB
Voir le projet

 5

 TERMINÉ 
Landmines and the cluster munitions still kill or maim civilians every day in an indiscriminate manner even long after conflicts are over. At the current rate of clearance of about 500,000 mines per year and assuming no additional mines are laid from now on, it could still take hundreds of years to find and clear all the landmines around the world.D-BOX will tackle the burning issue of anti-person ...
Voir le projet

 24

 TERMINÉ 

GMES pre-operational security services for supporting external actions (G-NEXT)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2015,

According to the potential application areas identified under SEA (GMES Security working group in Support to External Actions), and the experience gained by the proposal consortium in Security and Emergency precursor projects (LIMES, G-MOSAIC, SAFER) this proposal will identify and exploit a set of Services able to provide reliable support to the EU External Action service and suitable to be integ ...
Voir le projet

 17

 TERMINÉ 

Container Security Advanced Information Networking (CONTAIN)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

CONTAIN will specify and demonstrate a European Shipping Containers Surveillance system which will encompass regulatory, policy and standardisation recommendations, new business models and advanced container security management capabilities. CONTAIN will:1. Support transport security stakeholders in managing container security threats as part of an integrated approach to the management of transpor ...
Voir le projet

 24

 TERMINÉ 
An attempt to integrate Journey Planning engines to form a unified intermodal planner for international journeys, has been performed by the WISETRIP FP7 project. WISETRIP has addressed important needs of the international traveller including the provision of personalized information before and during the trip, under different usage scenarios. The proposed Enhanced WISETRIP project aims at building ...
Voir le projet

 16

 TERMINÉ 

SPACE-DATA ROUTERS For Exploiting Space DATA (SPACE-DATA ROUTERS)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2014,

"""Space-Data Routers"" is a project that has the potential to allow Space Agencies, Academic Institutes and Research Centers to share space-data generated by a single or multiple missions, in a natural, flexible, secure and automated manner. We develop a communication overlay modeled according to thematic context of missions, Ground Segment topological distribution, Agency policies and Applicatio ...
Voir le projet

 6

 TERMINÉ 

Sea Border Surveillance (SeaBILLA)

Date du début: 1 juin 2010, Date de fin: 28 févr. 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Voir le projet

 29

 TERMINÉ 
The present coordination action intends to conclude the major gaps that need to be filled for the establishment and future development of an international e_infrastructure able to effectively support and promote the exploitation of the scientific data produced by the International Space Station and other major space missions.The need for coordination stems from the large number of European partne ...
Voir le projet

 3

 TERMINÉ 

Simulator for Moving Target Indicator System (SIMTISYS)

Date du début: 1 juin 2011, Date de fin: 30 nov. 2013,

"Within the framework of the FP7 3° call several policies are related to the maritime surveillance for safety purposes as border surveillance, traffic safety, fishery control and environmental protection and monitoring (i.e. sea platform infrastructures and sea ports).Within all these policies the detection and the tracking of small vessels assumes a central strategic issue. A common tool, useful ...
Voir le projet

 7

 TERMINÉ 

Integrated Mobile Security Kit (IMSK)

Date du début: 1 mars 2009, Date de fin: 28 févr. 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Voir le projet

 29

 TERMINÉ 

Tagging Tool based on a Semantic Discovery Framework (TATOO)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

This proposal aims to set up a semantic web solution to close the discovery gap that prevents a full and easy access to environmental resources on the web. The proposal assumes the following: 1. It is meaningless to create yet another standard to facilitate access; we must exploit existing standards; 2. The burden of facilitating access to existing resources cannot be solely delegated to the owner ...
Voir le projet

 7

 TERMINÉ 
Digital Earth is a visionary concept for the virtual representation of the Earth that is spatially referenced, interconnected with the world's digital data repositories, and encompassing all its systems and forms, including Earth Sciences, Natural Resources Management, Environmental Monitoring system and human society dimensions. The project will establish open data and services access, allowing E ...
Voir le projet

 10

 TERMINÉ 

Future Integral SatCom Initiative (FISI)

Date du début: 1 sept. 2010, Date de fin: 30 sept. 2012,

Merit to their inherent properties of ubiquitous coverage and dependability, Satellite communication (SatCom) solutions by now play a significant role for the delivery of telecommunication services to European citizens and institutions in entertainment, digital divide, private networks, disaster management and security domains.Emerging SatCom architectures featuring increased capacity and flexibil ...
Voir le projet

 7

 TERMINÉ 
"The aim of the proposal is to design, assess and promote an ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring in order to achieve the critical transport infrastructures more reliable and safe. This has the overall aim to developing a high situation awareness in order to provide real time and detailed information and images of the infrastr ...
Voir le projet

 10

 TERMINÉ 

EUropean software defined radio for WireLEss in joint secuRity operations (EULER)

Date du début: 1 mars 2009, Date de fin: 30 avr. 2012,

The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Voir le projet

 19

 TERMINÉ 
"Within the context of the GMES Initiative, the G-MOSAIC Collaborative Project aims at identifying and developing products, methodologies and pilot services for the provision of geo-spatial information in support to EU external relations policies and at contributing to define and demonstrate sustainability of GMES global security perspective. The activities will be devoted to: Investigate the oper ...
Voir le projet

 39

 TERMINÉ 

Services and Applications For Emergency Response (SAFER)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

"SAFER aims at implementing preoperational versions of the Emergency Response Core Service. SAFER will reinforce European capacity to respond to emergency situations: fires, floods, earthquakes, volcanic eruptions, landslides, humanitarian crisis. The main goal is the upgrade of the core service and the validation of its performance with 2 priorities: First priority is the short term improvement o ...
Voir le projet

 57

 TERMINÉ 

New European WAtcher (NEWA)

Date du début: 1 août 2010, Date de fin: 31 mars 2012,

"The NEWA project aims at addressing and fully characterizing limiting factors in EU which limit the access to required technology and capabilities, creating large dependence on critical technologies from outside Europe specifically in space techniques applications.This mainly originates from the large number of past and on-going efforts conducted in space-based and air-based surveillance systems ...
Voir le projet

 9

 TERMINÉ 
"The ULISSE project is conceived by a network of centers already operative in space experimentation. This network is mainly based on the European USOCs including a number of research centers and companies. The USOCs (User Support and Operation Centers) are a network of centres engaged by the European Space Agency (ESA) in various EU countries to support the operations for scientific experiments on ...
Voir le projet

 17

 TERMINÉ 

Business and IT Alignment using a Model-Based Plug-in Framework (plugIT)

Date du début: 1 mars 2009, Date de fin: 31 août 2011,

Today we're witnessing the necessity to align Business and Information Technology (IT) and a respective change in the role that IT plays for businesses. Specifically, IT is massively changing from its role as an enabler - businesses request the IT support to an industrial sector in its own right. This sector provides IT infrastructure and services to any business in a way similar to the way electr ...
Voir le projet

 9

 TERMINÉ 

Resources and Services Virtualization without Barriers (RESERVOIR)

Date du début: 1 févr. 2008, Date de fin: 31 mars 2011,

Description The goal of the RESERVOIR project is to increase the competitiveness of the EU economy by introducing a powerful ICT infrastructure for the reliable and effective delivery of services as utilities.The main goal of the RESERVOIR project is to increase the competitiveness of the EU economy by introducing a powerful ICT infrastru ...
Voir le projet

 17

 TERMINÉ 

Support action to the Integral Satcom Initiative (ISI) (sISI)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

sISI is a support action (SA) intended to stimulate the participation in future Community ICT research of a large number of actors through facilitating their involvement into the Integral Satcom Initiative (ISI), the Technology Platform for Satellite Communications within FP7. To this purpose, sISI will provide all necessary support to ISI to make it an efficient platform, able to provide plenty o ...
Voir le projet

 5

 TERMINÉ 
Description INTERSECTIONINTERSECTION (INfrastructure for heTErogeneous, Resilient, SEcure, Complex, Tightly Inter-Operating Networks) aims at enhancing the European potential in the field of security by assuring the protection of heterogeneous networks and infrastructures. The project will focus on vulnerabilities at the intersection poin ...
Voir le projet

 10

 TERMINÉ 
Background In 2003 the province of Agrigento, on the south coast of Sicily, completed a LIFE project (LIFE99 NAT/IT/006271 - Urgent conservation measures of Caretta caretta in the Pelagian Islands) aimed at the conservation of the loggerhead turtle (Caretta caretta). It targeted two Natura 2000 sites in the Pelagian islands, Lampedusa and Linosa. The proj ...
Voir le projet

 6