Rechercher des projets européens

32 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

European Research and Innovation Centre of Excellence in ChiNA (ERICENA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Europe actively engages internationally to strengthen its leadership in the field of Science, Technology and Innovation (STI) in the global scene and improve synergies between Member States. Europe aims to foster international cooperation and strengthen its STI presence in China due to its growing importance and STI opportunities for European actors. ERICENA (European Research Innovation Centre of ...
Voir le projet

 13

 TERMINÉ 
Healthspan (the life period when one is generally healthy and free from serious disease) depends on nature (genetic make-up) and nurture (environmental influences, from the earliest stages of development throughout life). Genetic studies increasingly reveal mutations and polymorphisms that may affect healthspan. Similarly, claims abound about lifestyle modifications or treatments improving healths ...
Voir le projet

 20

 TERMINÉ 
The COP21 outcome represents an important new strategic context for EU climate policy. Analysing the implications of this new context requires an interdisciplinary approach, combining analysis of the evolution of the international climate regime as well as of NDCs and their socio-economic implications. Such analysis is also urgent, given the timelines imposed by the Paris Agreement for a “facilita ...
Voir le projet

 18

 TERMINÉ 
An important question for policy makers, in the G20 and beyond, is how to bring climate action into the broader sustainable development agenda. Objectives like energy poverty eradication, increased well-being and welfare, air quality improvement, energy security enhancement, and food and water availability will continue to remain important over the next several decades. There have been relatively ...
Voir le projet

 16

 TERMINÉ 

the international Learning Network of networks on Sustainability

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

The LeNSin project aims at the internationalization, intercultural cross-fertilization and accessibility of higher education by consolidating and empowering a global network called the Learning Network on Sustainability. This network is composed of 6 existing, functioning regional networks (14 HEIs in 5 partner countries and 4 European HEIs): LeNS_Brasil, LeNS_Mexico; LeNS_South Africa, LeNS_China ...
Voir le projet

 14

 TERMINÉ 

Introducing the European Union in classroom of Tsinghua

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

This proposed Jean Monnet module covers a suite of 2 undergraduate courses and 1 scholarship program for post-graduate students.Tsinghua University (THU) is one of the top two most important universities in China, together with Peking University. The recent three generations of Chinese national leaders, namely President Xi Jinping, former President Hu Jintao and former Premier Zhu Rongji, are all ...
Voir le projet

 1

 TERMINÉ 

Network for Cloud Computing Eco-System (CleanSky)

Date du début: 1 sept. 2014, Date de fin: 31 août 2018,

With the increasing demand for cloud computing services and rapid development and advances in data center techniques, cloud computing is moving from small data centers towards a large scale, highly efficient new computing infrastructure with low cost. The proposed CleanSky network is intended to provide a stimulating and structured platform for the training of young researchers, for the developmen ...
Voir le projet

 7

 TERMINÉ 
Due to the strong economic growth in the China in the past decade, air pollution has become a serious issue in many parts of the country. Therefore, up-to-date regional air pollution information and means of emission control for the main pollutants are important for China. Especially, the Beijing-Tianjin-Hebei region, the Yangtze River and the Pearl River deltas are known as three focal regions wi ...
Voir le projet

 15

 TERMINÉ 

PArtnership with chiNa on space DAta (PANDA)

Date du début: 11 nov. 2013, Date de fin: 1 janv. 2017,

PArtnership with chiNa on space DAtaThe objective of the PANDA Project is to establish a team of European and Chinese scientists who will jointly use space observations and in-situ data as well as advanced numerical models to monitor, analyse and forecast global and regional air quality. PANDA will provide to users and stakeholders knowledge, methodologies and toolboxes that will serve as a basis ...
Voir le projet

 14

 TERMINÉ 

The impact of the quality of CO2 on transport and storage behaviour (IMPACTS)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

"IMPACTS - The impact of the quality of CO2 on transport and storage behaviour will underpin the realisation of the EU CCS European Industrial Initiative implementation plan by developing knowledge and technology needed for Carbon Dioxide Capture, Transport and Storage (CCS) pilots and large-scale demonstrations. IMPACTS is linked to demonstration projects, and will therefore benefit from realisti ...
Voir le projet

 12

 TERMINÉ 

Evaluating the Climate and Air Quality Impacts of Short-Lived Pollutants (ECLIPSE)

Date du début: 1 nov. 2011, Date de fin: 28 févr. 2015,

ECLIPSE aims to develop and assess effective emission abatement strategies for short-lived climate agents in order to provide sound scientific advice on how to mitigate climate change while improving the quality of air. Current climate policy does not consider a range of short-lived gases and aerosols, and their precursors (including nitrogen oxides, volatile organic compounds, sulphate, and black ...
Voir le projet

 11

 TERMINÉ 

Linking European and Chinese Research Infrastructures and Communities (ORIENTplus)

Date du début: 1 juil. 2011, Date de fin: 31 déc. 2014,

Between 2007 and 2010 the ORIENT project provided the first high capacity link between GEANT and China with FP6 funding support and successfully enabled many innovative EU-China research and application collaborations to flourish. ORIENTplus addresses Section 3.4 domain (f) of the call ("International cooperation in Research and Education Networking addressing (i) the extension of the European in ...
Voir le projet

 12

 TERMINÉ 

Cross-lingual Knowledge Extraction (X-Like)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

The goal of the X-LIKE project is to develop technology to monitor and aggregate knowledge that is currently spread across global mainstream and social media, and to enable cross-lingual services for publishers, media monitoring and business intelligence.In terms of research contributions, the aim is to combine scientific insights from several scientific areas to contribute in the area of cross-li ...
Voir le projet

 8

 TERMINÉ 

Prediction and control of porosity in laser welding of non-ferrous metals (PCPLAS)

Date du début: 10 oct. 2013, Date de fin: 9 oct. 2014,

Laser welding is a robust process for producing full penetration welds in steels. Welds in non-ferrous materials (such as Al and Ti), achieving acceptable weld quality is less straightforward. Of particular concern is porosity formation in the deep penetration. Achieving low levels of porosity in a reproducible way is currently preventing acceptance of laser welding in the aerospace and to some ex ...
Voir le projet

 1

 TERMINÉ 

Glycomics by High-throughput Integrated Technologies (GlycoHIT)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2014,

Protein glycosylation is a post-translational phenomenon that is involved in most physiological and disease processes including cancer. Most of the known cancer-associated glycobiomarkers were discovered individually using liquid chromatography and mass spectroscopy. Though valuable, there is room for improvement in these approaches for the discovery phase. There is also a critical need for innova ...
Voir le projet

 16

 TERMINÉ 

Manipulation of Reynolds Stress for Separation Control and Drag Reduction (MARS)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2014,

"Reynolds stress is the most important quantity affecting the mean flow as it is responsible for a major part of the momentum transfer in the wall bounded turbulent flow. It has a direct relevance to both skin friction and flow separation. Manipulation of the Reynolds stress can directly lead to changes in the viscous stress at the wall so as to effectively control the flow for effective flow cont ...
Voir le projet

 19

 TERMINÉ 

Innovative CO2 capture (iCap)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deplo ...
Voir le projet

 14

 TERMINÉ 

Casting of Large Ti Structures (COLTS)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

"This proposal is in response to the call for EU and China collaboration on casting large Ti structures. The consortium consists of 7 EU and 7 Chinese partners. This proposal aims to make a step-change for casting of large Ti components by overcoming some key challenges in the casting process. Such a step-change is critical if the production of large Ti components is to meet the requirement in cos ...
Voir le projet

 11

 TERMINÉ 
"SPRING is a supporting action under EU FP7 Environment theme, with the main objective of creating and providing a solid basis for future EU-China collaboration in environmental research. SPRING will identify common needs and opportunities, analyse potential topics of research cooperation and initiatives, map competences and potentials of Chinese research organisations and major infrastructure, in ...
Voir le projet

 10

 TERMINÉ 

Policy Options to engage Emerging Asian economies in a post-Kyoto regime (POEM)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2012,

"Developing countries are reluctant to make any binding commitment as their per capita emissions are low and climate abatement measures conflict with their main priorities on socio-economic development. The question is if there is a way to simultaneously provide sufficient energy (which is also the main source of GHG emissions), to support poverty alleviation and economic growth and achieve suffic ...
Voir le projet

 7

 TERMINÉ 
BRAVEHEALTH proposes a patient-centric vision to CVD management and treatment, providing people already diagnosed as subjects at risk with a sound solution for continuous and remote monitoring and real time prevention of malignant events. The solution proposed will be made up of the following sub-systems: 1)WEARABLE UNIT: it is an innovative concept of miniaturised multi-parameter sensor, able to ...
Voir le projet

 18

 TERMINÉ 

Advanced Turbulence Simulation for Aerodynamic Application Challenges (ATAAC)

Date du début: 1 avr. 2009, Date de fin: 30 juin 2012,

"The ATAAC project aims at improvements to Computational Fluid Dynamics (CFD) methods for aerodynamic flows used in today’s aeronautical industry. The accuracy of these is limited by insufficient capabilities of the turbulence modelling / simulation approaches available, especially at the high Reynolds numbers typical of real-life flows. As LES will not be affordable for such flows in the next 4 d ...
Voir le projet

 22

 TERMINÉ 

Innovative networks of SMEs for complex products manufacturing (Net-Challenge)

Date du début: 1 juin 2009, Date de fin: 29 févr. 2012,

European SMEs will have to adopt new business models and to establish dynamic and non-hierarchical networks to respond to market opportunities, assuring quick response, fast time to market, differentiated offerings and competitive prices. Sustainability for SMEs will be found in high-variety low-volume businesses, related with complex products manufacturing. However, there are currently no proven ...
Voir le projet

 15

 TERMINÉ 

Open Architecture for Accessible Services Integration and Standardisation (OASIS)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2011,

OASIS introduces an innovative, Ontology-driven, Open Reference Architecture and Platform, which will enable and facilitate interoperability, seamless connectivity and sharing of content between different services and ontologies in all application domains relevant to applications for the elderly and beyond. The OASIS platform is open, modular, holistic, easy to use and standards abiding. It includ ...
Voir le projet

 30

 TERMINÉ 

Integrated Sustainable Solid Waste Management in Asia (ISSOWAMA)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2011,

The general inadequate, when existing, methods of collection and disposal of solid waste in most Asian cities are causing important environmental and social harms, as human diseases spreading, environmental pollution and ground and water pollution. In order to raise awareness, promote an adequate waste collection and treatment system and the economic growth of this activity sector in a technologic ...
Voir le projet

 22

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 
Description With partners around the globe, the FLOSSInclude project is developing a roadmap for international co-operation to realise the potential of FLOSS as a tool for social and economic development.The Southern FLOSS ChallengeFree/Libre/Open Source Software (FLOSS) holds great potential for developing countries. There are no licence ...
Voir le projet

 11

 TERMINÉ 

China EU Information Technology Standards Research Partnership (China EU Standards)

Date du début: 1 mars 2008, Date de fin: 28 févr. 2010,

This Action will promote research collaboration and engagement between research and policy in relation to Information Technology standardisation in China & Europe. The People’s Republic of China has recently begun to be remarkably active in many areas of ICT interoperability standards. This raises important issues for China about standardisation processes and technology promotion policy. Their out ...
Voir le projet

 8

 TERMINÉ 

INTERWEAVE - Student Mobility EU - Asia

Date du début: 15 juil. 2013,

The INTERWEAVE partnership & mobility project gathers diversified and complementary leading Asian and European HEIs in Science and Technology. It is jointly coordinated by Ecole Centrale de Nantes, France, and University of Malaya, Malaysia. It gathers 10 Asian and 10 EU HEIs, and is supported by 2 associate partners from the corporate and institutional realms. It triggers and manages the training ...
Voir le projet

 22

 TERMINÉ 
Voir le projet

 20

 TERMINÉ 

S1-L12 Erasmus Mundus Europe Asia

Date du début: 15 juil. 2011,

The overall objective of Erasmus Mundus Europe Asia, EMEA, (Lot 12) is to create a partnership in research and education that will strengthen the ties between Europe and Asia. The project will be used as a platform to establish or strengthen structures of academic cooperation, and emphasis will also be placed on capacity building aspects, specifically, the ability of the partner institutions to ha ...
Voir le projet

 20

 TERMINÉ 

S1-L11- EM Europe Asia

Date du début: 15 juil. 2010,

The Consortium is composed of partners representing eight European countries (Sweden,Italy, Poland, UK, Ireland, France, Austria, and The Netherlands) and five Asian countries(India, China, Pakistan, Nepal, and Bangladesh). When choosing partners, excellence ineducation and research have been the main criteria, but we have also taken into account theheritage from existing EMECW China and India pro ...
Voir le projet

 20