Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The project aims to establish an authoritative scientific framework for understanding the relationship between group ritual, social cohesion, and pro-group behaviour. Rituals have shaped human societies for millennia, but the exact social consequences of rituals are poorly understood. The proposed research will identify the fundamental components of rituals worldwide and chart their effects on pat ...
Voir le projet

 2

 TERMINÉ 

Information Theoretic Evaluation of Random Content Generation in Games (INTERCOGAM)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

INTERCOGAM’s goal is to develop and use information theory based intrinsic motivation formalisms to evaluate automatically generated game mechanics. Content generation is one of the production bottlenecks of professional game design, which has begun to be addressed by procedural content generation. In this field, search based procedural content generation uses the idea of evolutionary algorithms t ...
Voir le projet

 2

 TERMINÉ 

Online Proctoring for Remote Examination

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

...ome more accessible to a wider audience. Online education coupled with remote examination, offers more students the opportunity to gain a degree without the need to stay at or travel to university. In this way, this project will widen access to HE through reduced cost and help educate people across the world, especially in countries where access to this level of education is restricted. In additio ...
Voir le projet

 8

 TERMINÉ 

Safety Enables Cooperation in Uncertain Robotic Environments (SECURE)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

The majority of existing robots in industry are pre-programmed robots working in safety zones, with visual or auditory warning signals and little concept of intelligent safety awareness necessary for dynamic and unpredictable human or domestic environments. In the future, novel cognitive robotic companions will be developed, ranging from service robots to humanoid robots, which should be able to l ...
Voir le projet

 7

 TERMINÉ 

Socialising Sensori-Motor Contingencies (socSMCs)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

As robots become more omnipresent in our society, we are facing the challenge of making them more socially competent. However, in order to safely and meaningfully cooperate with humans, robots must be able to interact in ways that humans find intuitive and understandable. Addressing this challenge, we propose a novel approach for understanding and modelling social behaviour and implementing social ...
Voir le projet

 11

 TERMINÉ 
The crowning achievement of human communication is our unique ability to share intentionality, create and execute on joint plans. Using this paradigm we model human-robot communication as a three step process: sharing attention, establishing common ground and forming shared goals. Prerequisites for successful communication are being able to decode the cognitive state of people around us (mindrea ...
Voir le projet

 10

 TERMINÉ 
The objective of the EnviGuard project is to develop a highly specific and precise (i.e. quantitative and qualitative) in situ measurement device for currently hard to measure man-made chemical contaminants and biohazards (toxic microalgae, viruses & bacteria, biotoxins & PCBs) that can be used as an early warning system in aquaculture and as an environmental monitor to assess the good environment ...
Voir le projet

 19

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
Creating environments that foster young people´s wellbeing is one of the current priorities for the European Union. Increasingly such efforts are conceptually framed through a focus on positive paradigms across the life course. Social science evidence indicates that supportive relationships with significant adults are important determinants of young people’s wellbeing and future life chances. Rece ...
Voir le projet

 2

 TERMINÉ 

German Apprentices' Training in Europe XI

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Our vocational college "Berufskolleg an der Lindenstraße für Wirtschaft und Verwaltung" in Köln, Germany applies for funding by the programme Erasmus+ to be able to carry out the project "German Apprentices' Training in Europe XI" ("GATE XI") for 30 trainees for the eleventh time. GATE XI shall financially enable our very good vocational school students - mangement assistants in office communicati ...
Voir le projet

 3

 TERMINÉ 
The EFFeCT project aims to facilitate policy development and well-evidenced innovative improvements related to teacher learning at all levels of educational governance. By enhancing opportunities for teachers’ collaborative learning at all stages of their career, the project will contribute to improving teachers’ competencies in order that they have up-to-date knowledge and skills to provide bette ...
Voir le projet

 6

 TERMINÉ 

Widely scalable Mobile Underwater Sonar Technology (WiMUST)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

The WiMUST (Widely scalable Mobile Underwater Sonar Technology) project aims at expanding and improving the functionalities of current cooperative marine robotic systems, effectively enabling distributed acoustic array technologies for geophysical surveying with a view to exploration and geotechnical applications. Recent developments have shown that there is vast potential for groups of marine rob ...
Voir le projet

 10

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Calibrating Exoplanetary Atmospheres Using Benchmark Brown Dwarfs (CalExoPlan)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

Low-mass brown dwarfs in wide binary systems with young stars provide unparalleled opportunities for critically testing and improving the atmospheric model grids that are fundamental to interpreting observations of giant exoplanets. By data-mining the latest generation of wide field infrared surveys (e.g. VISTA, UHS, WISE) to select a sample of benchmark L and T dwarfs that maximise overlap in par ...
Voir le projet

 2

 TERMINÉ 
The population of children and young people with intellectual and developmental disabilities is growing with many more living with complex multi-morbidities. Due to their complexity of need children and young people with complex intellectual and developmental disabilities require access to practitioners across education, healthcare and social care who have a shared knowledge of their complex need ...
Voir le projet

 5

 TERMINÉ 

German Apprentices' Training X

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Our vocational college "Berufskolleg an der Lindenstraße für Wirtschaft und Verwaltung" in Köln, Germany applied for funding by the programme Erasmus+ to be able to carry out the project "German Apprentices' Training in Europe X" ("GATE X") for 25 trainees for the tenth time. GATE X should financially enable our very good vocational school students - mangement assistants in office communications, ...
Voir le projet

 3

 TERMINÉ 

Objective Control for TAlker VErification (OCTAVE)

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Industry needs alternatives to textual passwords for access control. While tokens can still be stolen or transferred to other persons, biometrics technology can provide reliable, cost-effective and user-friendly solutions.The proliferation of smart services calls for unsupervised authentication at a distance. Being natural, non-intrusive and readily compatible with smart and mobile devices, automa ...
Voir le projet

 13

 TERMINÉ 

testinG massivE STar formATion modEis (GESTATE)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2017,

The classic problem in the formation of high-mass stars is that, for all stars above ~20 Msun, the outward force exerted by the stars radiation on the dusty circumstellar gas should be capable of reversing or halting accretion flows. Core fragmentation, pressure from the expanding ionised gas, magnetic fields and mass loss through stellar winds, all work against the effects of gravity, thereby res ...
Voir le projet

 2

 TERMINÉ 
Since 2008, Europe has been shaken by an ongoing crisis. If relevant parts of populations are exposed to socioeconomic risks, it is a distinctive characteristic of European political ethics that they must not be left alone, but should be subject to support and solidarity by budget support policy, economic development policies and social policy at different levels. But, in analogy with medical and ...
Voir le projet

 10

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

German Apprentices' Training in Europe IX

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

Our vocational college "Berufskolleg an der Lindenstraße für Wirtschaft und Verwaltung" in Köln, Germany applies for funding by the programme Erasmus+ to be able to carry out the project "German Apprentices' Training in Europe IX" ("GATE IX") for 20 trainees for the ninth time. GATE IX shall financially enable our very good vocational school students - mangement assistants in office communications ...
Voir le projet

 2

 TERMINÉ 

Biological and Mathematical Basis of Interaction Computing (BIOMICS)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2016,

Interaction Computing (IC) takes inspiration from cellular processes rather than from evolution. BIOMICS aims to leverage existing cell metabolic and regulatory mechanisms as the ontogenetic basis of a model for IC. However, because the knowledge to properly mimic, exploit and adapt these systems to computer science is lacking, BIOMICS will also advance the state of the art in the mathematics of b ...
Voir le projet

 4

 TERMINÉ 

Prospective Memory in Mild Cognitive Impairment (PMINMCI)

Date du début: 1 oct. 2014, Date de fin: 31 mars 2016,

Population in Europe is ageing rapidly. Consequently, there is an urgent need to find ways to help the growing population of older people to live independent lives and preserve well being into old age. To address this pressing issue, PMinMCI will conduct the first systematic and innovative investigation of prospective memory in older adults at risk of Alzheimer’s disease. Prospective memory refers ...
Voir le projet

 2

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

The project is student and staff mobility at University of Hertfordshire. One of the key objectives of the University's Strategic Plan is to offer student overseas learning opportunities. The number of students undertaking mobility under Erasmus has slightly fallen, with 65 students studying and 23 students on work placements. However, the pleasing feature is the growing diversity of countries as ...
Voir le projet

 1

 TERMINÉ 
"ICT-based service and product innovation is curtailed by the growing vertical chain of dependence on poorly interoperable proprietary technologies in Europe. This issue was identified to have high impact on European innovation productivity by the Report of the Independent Expert Group on R&D and Innovation, commonly known as the Aho-report. The report demanded incentives for the convergence of sh ...
Voir le projet

 28

 TERMINÉ 

Network of Excellence in Internet Science (EINS)

Date du début: 1 déc. 2011, Date de fin: 31 mai 2015,

The goal of EINS is coordinating and integrating European research aimed at achieving a deeper multidisciplinary understanding of the development of the Internet as a societal and technological artefact, whose evolution is increasingly interwined with that of human societies. Its main objective is to allow an open and productive dialogue between all the disciplines which study Internet systems und ...
Voir le projet

 48

 TERMINÉ 

Towards an Embodied Science of InterSubjectivity (TESIS)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2015,

TESIS, “Towards an Embodied Science of InterSubjectivity”, is an integrated ITN programme to investigate the foundations of human sociality. It brings together the complementary expertise of 13 European research institutes, clinical centres and private enterprises that span the biomedical sciences and the humanities. Thus, TESIS provides critical mass in the fields of philosophy, cognitive neurosc ...
Voir le projet

 8

 TERMINÉ 

Multibody Advanced Airship for Transport (MAAT)

Date du début: 1 sept. 2011, Date de fin: 28 févr. 2015,

"The MAAT project aims to investigate aerial transportation possibility by airship based cruiser-feeder system. MAAT is composed by tree modules :- the cruiser, named PTAH, (acronym of Photovoltaic Transport Aerial High altitude system);- the feeder, named ATEN (Aerial Transport Elevator Network feeder), is a VTOL system (Vertical Take Off and Landing) which ensure the connection ...
Voir le projet

 12

 TERMINÉ 

Cognitive Control Framework for Robotic Systems (CORBYS)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

Description The focus of the CORBYS project is on robotic systems that have symbiotic relationship with humans. These systems have to cope with highly dynamic environments as humans are demanding, curious and often act unpredictably. CORBYS will design and implement a cognitive robot control architecture that allows the integration of 1) hig ...
Voir le projet

 11

 TERMINÉ 
"In response to threats to global food security from population increase and climate change, there is an urgent need to develop UK crops that suffer less losses from diseases and produce sustainable yields, despite withdrawal of fungicides (EU legislation) and the need to mitigate climate change from agriculture (UK government targets). Thus, there is a need to develop strategies for deployment of ...
Voir le projet

 2

 TERMINÉ 

Supervised Care & Rehabilitation Involving Personal Tele-robotics (SCRIPT)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

Recent development in robot-mediated rehabilitation has shown the potential of robotic devices for delivering repetitive training thus allowing for a large number of repetitions to be delivered during acute and chronic phases of stroke rehabilitation. While there is growing evidence that such technologies are beneficial to patient's recovery of functional and motor outcome, our goals are:1: To use ...
Voir le projet

 8

 TERMINÉ 

Interpretation and Parameterization of Extremely Red COOL dwarfs (IPERCOOL)

Date du début: 15 nov. 2010, Date de fin: 14 nov. 2014,

"We propose a collaboration of Torino Observatory (OATo), the Center for Astrophysical Research at the University of Hertfordshire (CAR-UH), the National Brazilian Observatory (ON/MCT) and the Shanghai Astronomical Observatory (SHAO) on the interpretation of low mass star and brown dwarf observations. We have a number of ongoing observational collaborations to determine the distance to over 200 ne ...
Voir le projet

 3

 TERMINÉ 

Acceptable robotiCs COMPanions for AgeiNg Years (ACCOMPANY)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

Description ACCOMPANY provides a robotic companion as part of an intelligent environment. It helps older people to live independently at home by providing physical, cognitive and social assistance in everyday home tasks. ACCOMPANY contributes to the re-enablement of the user by assisting him or her to carry out tasks independently. Services ...
Voir le projet

 9

 TERMINÉ 

Adaptive Strategies for Sustainable Long-Term Social Interaction (ALIZ-E)

Date du début: 1 mars 2010, Date de fin: 31 août 2014,

Description From theory to practice: Methods for an adaptive and prolonged child-robot interaction The goal of ALIZ-E is to develop novel methods for developing and testing interactive, mobile robots which will be able to socially interact with human users over extended periods of time, i.e. a pos ...
Voir le projet

 12

 TERMINÉ 

Sustainable Hydrogen Evaluation in Logistics (SHEL)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2014,

"Materials handling vehicles are currently powered by either electric motors based on lead-acid batteries or combustion engines employing diesel or liquefied petroleum gas. A number of disadvantages have been encountered with these current power systems and many efforts have been undertaken to find new ways to power the vehicles..Here, fuel cells offer advantages over the competing electrochemical ...
Voir le projet

 14

 TERMINÉ 
Description To investigate a statistical-runtime-feedback-driven optimisation that will improve performance of multicore interconnected processors with applications in medical imaging and biometric recognitionWhereas in the 1990s the speed of computer hardware doubled every 18 months while the software technologies remained largely stable ...
Voir le projet

 10

 TERMINÉ 

Portable Real Time Detection of Airborne Asbestos Fibres for Tradespersons (ALERT)

Date du début: 2 août 2010, Date de fin: 1 août 2013,

"Asbestos-related diseases are the leading cause of occupational death in Europe. 500,000 European workers, mostly within the construction, demolition and remediation industries, are expected to die by 2030. Despite a ban on asbestos use, our members’ workers are continually exposed to this potent, invisible carcinogen from legacy products such as insulation, water tanks, ceiling panels, floor til ...
Voir le projet

 13

 TERMINÉ 
The external parameters generally used in the traditional processing of structural metals are temperature, pressure and time. External electromagnetic fields (EMF) have significant potential for use in materials processing. Experimental data reasonably indicate that EMF can influence the microstructure and mechanical properties of materials. They suggest that application of EMF may be an effective ...
Voir le projet

 2

 TERMINÉ 
ACCORDANCE introduces a novel ultra high capacity (even reaching the 100Gbps regime) extended reach optical access network architecture based on OFDMA (Orthogonal Frequency Division Multiple Access) technology/protocols, implemented through the proper mix of state-of-the-art photonics and electronics. Such architecture is not only intended to offer improved performance compared to evolving TDMA-PO ...
Voir le projet

 10

 TERMINÉ 

LIving with Robots and intEractive Companions (LIREC)

Date du début: 1 mars 2008, Date de fin: 31 août 2012,

LIREC aims to establish a multi-faceted (memory, emotions, cognition, communication, learning, etc.) theory of artificial long-term companions, embody it in robust and innovative technology, verify the theory and technology experimentally in real social environments, and provide resulting guidelines for designing such companions. Whether as robots, social toys or graphical and mobile synthetic cha ...
Voir le projet

 10