Rechercher des projets européens

37 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management ...
Voir le projet

 22

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

Secure Architectures of Future Emerging Cryptography (SAFEcrypto)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

SAFEcrypto will provide a new generation of practical, robust and physically secure post quantum cryptographic solutions that ensure long-term security for future ICT systems, services and applications. Novel public-key cryptographic schemes (digital signatures, authentication, public-key encryption, identity-based encryption) will be developed using lattice problems as the source of computational ...
Voir le projet

 8

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Homomorphic Encryption Applications and Technology (HEAT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

...momorphic cryptography (KU LEUVEN, UNIVBRIS and UL), with the leading expertise on lattice based cryptanalysis (UPMC), and three industrial partners with existing interests in the field (CRX, NXP and Thales UK). The goal of HEAT is to produce a step change in the efficiency and applicability of this technology. The proposal leverages existing ground breaking research in Europe, and links this with ...
Voir le projet

 7

 TERMINÉ 

Global ATM security management (GAMMA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

The GAMMA project stems from the recognition that while the SESAR initiative is effectively addressing some security issues in the new global ATM scenarios, there is a need to extend this scope to ensure a comprehensive assessment of the full set of security threats and vulnerabilities affecting ATM, considered as a system of systems and covering operational as well as technological aspects. In ad ...
Voir le projet

 23

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Demonstrator of EGNSS Services based on Time Reference Architecture (DEMETRA)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

DEMETRA aims to demonstrate the feasibility of delivering early EGNSS timing services to end users by utilising an operational demonstrator and conducting tests with pilot applications. Based on the current practice of national metrological laboratories, DEMETRA will define and develop a prototype of a European time disseminator, based on EGNSS., An array of important service features that are nec ...
Voir le projet

 14

 TERMINÉ 

COgnitive & Perceptive CAMeraS (COPCAMS)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Voir le projet

 25

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

Programmability In RINA for European supremacy of virTualised NEtworks (PRISTINE)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2016,

The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Voir le projet

 16

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
This Project aims to support Rolls Royce in the design of a of high temperature flexible PCB and through trials of flexible laminates manufactured from existing and brand new advanced polymers progress the temperature at which a flexible printed circuit can operate from the current state of the art maximum of 200°C into the desired range of 260°C (minimum) up to 400°C (target).The Project also aim ...
Voir le projet

 5

 TERMINÉ 
"ICT-based service and product innovation is curtailed by the growing vertical chain of dependence on poorly interoperable proprietary technologies in Europe. This issue was identified to have high impact on European innovation productivity by the Report of the Independent Expert Group on R&D and Innovation, commonly known as the Aho-report. The report demanded incentives for the convergence of sh ...
Voir le projet

 28

 TERMINÉ 
SARABAND project aims to take advantage of the Q-band frequency (40,5 to 43,5 GHz) in a cost effective way to provide higher performing and integrated network nodes for wireless backhaul of future mobile radio and last mile access for the digital divide by developing smart antennas and front-end radio modules. The use of millimeter waves, particularly the Q-band where 3GHz bandwidth has been regul ...
Voir le projet

 10

 TERMINÉ 

Container Security Advanced Information Networking (CONTAIN)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

CONTAIN will specify and demonstrate a European Shipping Containers Surveillance system which will encompass regulatory, policy and standardisation recommendations, new business models and advanced container security management capabilities. CONTAIN will:1. Support transport security stakeholders in managing container security threats as part of an integrated approach to the management of transpor ...
Voir le projet

 24

 TERMINÉ 

Open Platform for EvolutioNary Certification Of Safety-critical Systems (OPENCOSS)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

Safety assurance and certification are amongst the most expensive and time-consuming tasks in the development of safety-critical embedded systems. European innovation and productivity in this market is curtailed by the lack of affordable (re)certification approaches. Major problems arise when evolutions to a system entail reconstruction of the entire body of certification arguments and evidence. F ...
Voir le projet

 21

 TERMINÉ 
During the last century, significant scientific progress has more than doubled the average lifetime of developed countries inhabitants. This amazing result is the indirect consequence of X-rays discoveryin 1901, of antibiotics in the late 20s, of advances in surgery with the first heart transplant in the late 60s, to name just a few representative examples. In the new millennium, eHealth will like ...
Voir le projet

 11

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Voir le projet

 42

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Voir le projet

 34

 TERMINÉ 

Simulator for Moving Target Indicator System (SIMTISYS)

Date du début: 1 juin 2011, Date de fin: 30 nov. 2013,

"Within the framework of the FP7 3° call several policies are related to the maritime surveillance for safety purposes as border surveillance, traffic safety, fishery control and environmental protection and monitoring (i.e. sea platform infrastructures and sea ports).Within all these policies the detection and the tracking of small vessels assumes a central strategic issue. A common tool, useful ...
Voir le projet

 7

 TERMINÉ 

Cooperative Networking for High Capacity Transport Architectures (CONECT)

Date du début: 1 mai 2010, Date de fin: 31 août 2013,

CONECT proposes a holistic network design approach that drastically enhances performance in wireless networks by unlocking the hidden potential of the broadcast wireless medium. Information and communication theory, and protocol design engineering are used as the foundations for developing provably optimal cooperative information forwarding strategies, from multi-signal fusion to packet relay and ...
Voir le projet

 6

 TERMINÉ 

HIRF Synthetic Environment (HIRF SE)

Date du début: 1 déc. 2008, Date de fin: 31 mai 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Voir le projet

 45

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 

Quality of Service and MObility driven cognitive radio Systems (QoSMOS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

QoSMOS is a 3-year Integrated Project that aims at researching, developing and integrating a Cognitive Radio (CR) framework to enable mobile broadband systems to improve utilisation of licensed and/or unlicensed bands, by adding dynamic exploitation of under-utilised spectrum. The technical focus is on opportunistic use of spectrum combined with managed Quality of Service (QoS) and seamless mobili ...
Voir le projet

 15

 TERMINÉ 

Integrated Mobile Security Kit (IMSK)

Date du début: 1 mars 2009, Date de fin: 28 févr. 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Voir le projet

 29

 TERMINÉ 
Due to the need of supporting diversified services with vastly expanded use of wireless access, the Future Internet will set the networks under stress for resources. This motivates the quest for efficiency, through technologies that achieve: (i) higher utilization of resources; (ii) lower transmission powers and energy consumption (decisions with "green" footprint); (iii) reductions in the total c ...
Voir le projet

 12

 TERMINÉ 

Spectrum and energy efficiency through multi-band Cognitive Radio (SACRA)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

As highlighted in the Work Programme, energy efficiency and flexibility in the use of spectrum resources are two major research challenges for the development of future wireless communications technologies.To address these challenges, SACRA project proposes to develop a multi-band cognitive radio technology. In SACRA, new techniques for the global efficiency of wireless systems will be developed i ...
Voir le projet

 11

 TERMINÉ 

Internet of Things Initiative (IoT-i)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Voir le projet

 17

 TERMINÉ 
Virtualised service platforms and cloud computing hold great promise for delivery of large applications in e-Government. However, to date, the fundamental shared-resource nature of virtualisation technologies has raised legitimate security concerns for Government and other organisations with duties to protect confidential data.The PASSIVE project proposes an improved model of security for such vir ...
Voir le projet

 8

 TERMINÉ 

INtegrated European Signalling System (INESS)

Date du début: 1 oct. 2008, Date de fin: 31 mars 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Voir le projet

 31

 TERMINÉ 

New European WAtcher (NEWA)

Date du début: 1 août 2010, Date de fin: 31 mars 2012,

"The NEWA project aims at addressing and fully characterizing limiting factors in EU which limit the access to required technology and capabilities, creating large dependence on critical technologies from outside Europe specifically in space techniques applications.This mainly originates from the large number of past and on-going efforts conducted in space-based and air-based surveillance systems ...
Voir le projet

 9

 TERMINÉ 

Integrating the Physical with the Digital World of the Network of the Future (SENSEI)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

In order to realise the vision of Ambient Intelligence in a future network and service environment, heterogeneous wireless sensor and actuator networks (WS&AN) have to be integrated into a common framework of global scale and made available to services and applications via universal service interfaces. SENSEI creates an open, business driven architecture that fundamentally addresses the scalabilit ...
Voir le projet

 20

 TERMINÉ 
Description INTERSECTIONINTERSECTION (INfrastructure for heTErogeneous, Resilient, SEcure, Complex, Tightly Inter-Operating Networks) aims at enhancing the European potential in the field of security by assuring the protection of heterogeneous networks and infrastructures. The project will focus on vulnerabilities at the intersection poin ...
Voir le projet

 10

 TERMINÉ 

End-to-End Efficiency (E3) (E3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Voir le projet

 23