Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Energy-efficient Heterogeneous COmputing at exaSCALE (ECOSCALE)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

In order to reach exascale performance current HPC servers need to be improved. Simple scaling is not a feasible solution due to the increasing utility costs and power consumption limitations. Apart from improvements in implementation technology, what is needed is to refine the HPC application development as well as the architecture of the future HPC systems.ECOSCALE tackles this challenge by pro ...
Voir le projet

 8

 TERMINÉ 

Exploiting eXascale Technology with Reconfigurable Architectures (EXTRA)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

To handle the stringent performance requirements of future exascale High Performance Computing (HPC) applications, HPC systems need ultra-efficient heterogeneous compute nodes. To reduce power and increase performance, such compute nodes will require reconfiguration as an intrinsic feature, so that specific HPC application features can be optimally accelerated at all times, even if they regularly ...
Voir le projet

 10

 TERMINÉ 

A Novel, Comprehensible, Ultra-Fast, Security-Aware CPS Simulator (COSSIM)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

One of the main problems the CPS designers face is “the lack of simulation tools and models for system design and analysis”. This is mainly because the majority of the existing simulation tools for complex CPS handle efficiently only parts of a system while they mainly focus on the performance. Moreover, they require extreme amounts of processing resources and computation time to accurately simula ...
Voir le projet

 8

 TERMINÉ 
The growing number of fine-granular data streams opens up new opportunities for improved risk analysis, situation and evolution monitoring as well as event detection. However, there are still some major roadblocks for leveraging the full potential of data stream processing, as it would, for example, be needed the highly relevant systemic risk analysis in the financial domain.The QualiMaster projec ...
Voir le projet

 5

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 

Transceiver Design for Distributed Wireless Networks (TRADENET)

Date du début: 16 août 2012, Date de fin: 15 juin 2016,

Due to the demand for high data transmission rates in modern wireless communication networks, recently there has been research interest in distributed systems operated through cooperation between network nodes. In contrast to contemporary centralized systems, there are certain issues that appear especially in distributed systems, such as node synchronization in terms of time/frequency, uncertainty ...
Voir le projet

 1

 TERMINÉ 

Spoken Dialogue Analytics (SpeDial)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2015,

The speech services industry has been growing both for telephony applications and, recently, also for smartphones (e.g., Siri). Despite recent progress in spoken dialogue system (SDS) technologies the development cycle of speech services still requires significant effort and expertise. A significant portion of this effort is geared towards the development of the domain semantics and associated gra ...
Voir le projet

 6

 TERMINÉ 

LEADS: Large-Scale Elastic Architecture for Data as a Service (LEADS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

There is a wealth of publicly available data in today's Internet (e.g., Web pages, government law texts, public statistics, media archives, etc.) that can be exploited by large and small companies in various business domains. Storing, processing, and querying such ever increasing amounts of data is becoming a major challenge, and having the capability to do so is a strong asset for the few big com ...
Voir le projet

 8

 TERMINÉ 

Future Internet Social and Technological Alignment Research (FI-STAR)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Voir le projet

 44

 TERMINÉ 

WSN Development, Planning and Commissioning & Maintenance ToolSet (WSN DPCM)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

Despite the considerable research and important advances of the Wireless Sensor Networks (WSN) field, large scale application of the technology is still hindered by technical, complexity and cost issues. Ongoing R&D projects are addressing the shortcomings by focusing on energy harvesting, middleware, network intelligence, standardization, network reliability, adaptability and scalability. These a ...
Voir le projet

 11

 TERMINÉ 

autoNomous, self-Learning, OPTImal and compLete Underwater Systems (NOPTILUS)

Date du début: 1 avr. 2011, Date de fin: 30 juin 2015,

Description Current multi-AUV (autonomous underwater vehicle) systems are far from being capable of fully autonomously taking over real-life complex situation-awareness operations. As such operations require advanced reasoning and decision-making abilities the existing designs have to heavily rely on human operators. But humans can easily be ...
Voir le projet

 10

 TERMINÉ 
"The E-SPONDER is a suite of real-time data-centric technologies which will provide actionable information and communication support to first responders that act during abnormal events (crises) occurring in critical infrastructures. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and ou ...
Voir le projet

 17

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 

Innovative, Highly Efficient Road Surface Measurement and Control System (HERMES)

Date du début: 1 août 2012, Date de fin: 31 juil. 2014,

One of the most important aims in today’s transport systems is the security they provide. Even-though in air and rail transports we have managed to have extremely low accident and death rates this is not the case with road transport. The majority of the EU countries are now heading towards “the Vision Zero philosophy” in which road deaths become as unacceptable as they are in a factory, in the air ...
Voir le projet

 8

 TERMINÉ 

Language Resources for Portable Multilingual Spoken Dialogue Systems (PortDial)

Date du début: 1 juin 2012, Date de fin: 31 mai 2014,

Speech services are becoming an increasingly important market segment for Europe's SMEs. A major roadblock in producing low-cost high-quality spoken dialogue system (SDS) applications is the lack of linguistic resources that will enable the porting of SDS to new domains or languages. Currently, porting spoken dialogue systems to new domains is time-consuming, requires expertise in language enginee ...
Voir le projet

 5

 TERMINÉ 

Danube Inland Harbour Development (DaHar)

Date du début: 31 mars 2011, Date de fin: 30 mars 2014,

The DaHar partnership represents small and medium sized Danube cities with ports of international importance. The economic development and participation in the economic circulation of these cities could be enhanced through the optimal utilisation of port development in the frame of enhancing waterway cargo transport on the Danube in a transnational context. To this end, DaHar partners wish to util ...
Voir le projet

 23

 TERMINÉ 
"Europe has a strong leadership in the domains of intelligent telecommunications, multimedia, and automotive systems. However, the exponential increase in complexity of intelligent systems threatens the European competitiveness.In order to solve today’s challenges of high-complex design for embedded electronic systems, a number of approaches have been tried. Hardware-software codesign is the first ...
Voir le projet

 6

 TERMINÉ 
PowerUp aims to develop the Vehicle-2-Grid (V2G) interface, involving a full development cycle of physical/link-layer specification, charging control protocol design, prototyping, conformance testing, field trials, and standardisation. Its results will ensure that FEVs smoothly integrate into emerging smart-grid networks. Thereby the efficiencies resulting from robust grid operation may be achieve ...
Voir le projet

 11

 TERMINÉ 
Euro coinage has been steadily subject to increasing outlawed counterfeiting activities. The most recent figures bring to 14 the number of illegal mints discovered to date, accompanied with a significant cumulative total of counterfeit coins detected or confiscated. Over 80 classes of counterfeit coins and corresponding tooling and working methods are identified, which by European Technical and Sc ...
Voir le projet

 10

 TERMINÉ 

COmpact MOdelling Network (COMON) (COMON)

Date du début: 1 déc. 2008, Date de fin: 30 nov. 2012,

"The goal of our Network is to address the full development chain of Compact Modeling (CM) of advanced CMOS and III-V technologies, from the technology level to the system level. Our mission is driven by the need to enhance scientific knowledge, transfer scientific and technological knowledge from academia to industry, to strengthen the European integrated circuit (IC) industry with powerful desi ...
Voir le projet

 16

 TERMINÉ 

Healthcare Interoperability Testing and Conformance Harmonization (HITCH)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2011,

"eHealth, the beneficial application of ICT-based systems and solutions, has been identified as potentially the key enabler to fundamentally improve patient safety in clinical contexts" . However, with ICT becoming a mission critical component of healthcare processes, the interoperability of the multitude of systems that together form the eHealth infrastructure of a hospital, region or nation, is ...
Voir le projet

 13

 TERMINÉ 

Open Source Modelling and Hardware Software Codesign of Embedded Systems (OSMOSIS)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2010,

"Europe has a strong leadership in the domains of intelligent communications, multimedia, and automotive systems. However, the exponential increase in complexity threatens the European competitiveness. Current challenges when designing mixed HW/SW embedded systems are (1) mastering the complexity of the integration between the HW and the SW parts, (2) shortening time-to-market, and (3) reducing de ...
Voir le projet

 6

 TERMINÉ 

Ad-hoc PAN and WIreless Sensor SEcure NETwork (AWISSENET)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2010,

Description AWISSENET (Ad-hoc PAN & WIreless Sensor SEcure NETwork)AWISSENET (Ad-hoc personal area network and WIreless Sensor SEcure NETwork) is a project focused on security and resilience across ad-hoc Personal Area Networks (PANs) and wireless sensor networks. AWISSENET motivation is to implement and validate a scalable, secure, trust ...
Voir le projet

 8

 TERMINÉ 
Standardisation, and associated regulations, in respect of RFID is of critical importance in realising open systems applications of global significance, such as supply chain traceability and logistics. Of parallel significance is the numbering and identification coding required to facilitate global systems applications. While much of the emphasis of European attentions to RFID focuses upon electro ...
Voir le projet

 8

 TERMINÉ 
The regions of southeast Mediterranean are characterized by expanded inner space and isolated areas. Those makes difficult the socially, technologically, and economical integration and consequently, the equally and efficient provision of services like health care services. The main objective of the project INTERMED is to implement a platform that will enhance the provision of medical services for ...
Voir le projet

 5