Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The physical laws of diffraction generally limit the spatial resolution of optical systems, being about 200 nm for light in the visible range. Within ChipScope we want to overcome this limit by developing the scientific and technological basis for a completely new approach to optical superresolution, based on semiconductor nano Light Emitting Diode (nanoLED) arrays with individual pixel operation. ...
Voir le projet

 7

 TERMINÉ 
A central discipline of chemistry is the design und creation of molecules with defined structural and chemical properties. Stretching synthetic horizons is a never-ending endeavor to inspirit the chemist’ s creativity in preparing compounds and materials yet to be discovered. Relying on their high strain energy cyclopropanes, as carriers of the most fundamental ring geometry, offer a unique reacti ...
Voir le projet

 1

 TERMINÉ 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Voir le projet

 9

 TERMINÉ 
Fog computing brings cloud computing capabilities closer to the end-device and users, while enabling location-dependent resource allocation, low latency services, and extending significantly the IoT services portfolio as well as market and business opportunities in the cloud sector. With the number of devices exponentially growing globally, new cloud and fog models are expected to emerge, paving ...
Voir le projet

 10

 TERMINÉ 
The estimated average gap between calculated and actual energy performance of the European building stock is 25% for energy performance and 1,5% for comfort performance (as scored by building occupants). Comprehensive research has shown that faultily commissioned and operated building management systems are a main cause for this gap mainly caused by the lack of appropriate and coherent quality man ...
Voir le projet

 14

 TERMINÉ 
SARAH is concerned with establishing novel holistic, simulation-based approaches to the analysis of aircraft ditching. It is build up from a consortium of experts from OEM industries, experienced suppliers of simulation technologies, established research institutions and representatives of the certification authorities. Results of SARAH are expected to support a performance-based regulation and ce ...
Voir le projet

 12

 TERMINÉ 

Nanodevice Engineering for a Better Chemical Gas Sensing Technology (BETTERSENSE)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2019,

BetterSense aims to solve the two main problems in current gas sensor technologies: the high power consumption and the poor selectivity. For the former, we propose a radically new approach: to integrate the sensing components and the energy sources intimately, at the nanoscale, in order to achieve a new kind of sensor concept featuring zero power consumption. For the latter, we will mimic the biol ...
Voir le projet

 2

 TERMINÉ 
Supermarkets comprise various technical disciplines: buildings, heating-, cooling- and ventilations systems. Over one million supermarkets across Europe require ca. 4% of the total electricity. New integrated technologies for more efficient supermarkets are now available and efficiency improvements up to 30% have already been demonstrated. These heating and cooling technologies offer in the mid-te ...
Voir le projet

 11

 TERMINÉ 

Cognitive Interaction in Motion (CogIMon)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2019,

Compliant control in humans is exploited in a variety of sophisticated skills. These include solitary actions such as soft catching, sliding, pushing large objects as well as joint actions performed in teams such as mainpulation of large scale objects or mutual adaptation through phyiscal coupling for learning, in walking or in execution of joint tasks. We refer to this advanced ability of organiz ...
Voir le projet

 10

 TERMINÉ 
In BIOCASCADES, nine early-stage researchers (ESRs) will investigate the development of sustainable (chemo)enzymatic cascade reactions under the ‘green chemistry’ philosophy. The proposed BIOCASCADES project combines different techniques such as compartmentalization, protein engineering and reaction engineering in order to develop commercially viable and environmentally benign one pot reactions. B ...
Voir le projet

 12

 TERMINÉ 
ReDSHIFT will address barriers to compliance for spacecraft manufacturers and operators presented now and in the future by requirements and technologies for de-orbiting and disposal of space objects. This will be achieved through a holistic approach that considers from the outset opposing and challenging constraints for the safety of the human population when these objects re-enter the atmosphere, ...
Voir le projet

 13

 TERMINÉ 

Autonomous Unmanned Aerial Systems for Marine and Coastal Monitoring (MarineUAS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

European countries have vast coasts and economic zones that go far into the Atlantic and Arctic oceans and are challenging to monitor and manage. The need to protect and manage the vulnerable natural environment and marine resources in a sustainable manner is an important policy that is manifested in European legislation such as the European Strategy for Marine and Maritime Research. Moreover, the ...
Voir le projet

 10

 TERMINÉ 

Satellite Swarm Sensor NETwork (S3NET)

Date du début: 1 mai 2016, Date de fin: 31 oct. 2018,

The implementation of the S3NET concept as proposed by this consortium, will significantly advance the knowledge and decision-making capabilities for the space community in general and mission planners in particular. Through the enhancement and efficient use of on-board resources (computing power, communications and fuel) the improvements in performance of Earth observations (EO) using fractionate ...
Voir le projet

 8

 TERMINÉ 

Production harmonizEd Reconfiguration of Flexible Robots and Machinery (PERFoRM)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2018,

PERFoRM - Production harmonizEd Reconfiguration of Flexible Robots and Machinery aims to the conceptual transformation of existing Production Systems towards plug&produce production systems in order to achieve a flexible manufacturing environments based on rapid and seamless reconfiguration of machinery and robots as response to operational or business events.These objectives require research acti ...
Voir le projet

 18

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
There are many degenerative diseases affecting the cerebellum (as certain cerebellar ataxia) with severe locomotor symptoms, in which the Purkinje cells (PCs), the sole-output cerebellar neurons, suffer from degeneration. The adult regenerative capacity of neurons in mammals is extremely low. However, the zebrafish is a model organism that exhibits extensive adult neurogenesis and regeneration, an ...
Voir le projet

 1

 TERMINÉ 
Present approaches to increasing resource efficiency in manufacturing companies are mainly focused on single process optimisation. A wider and integrated optimisation is assumed to have significantly higher savings potential.In fact, a pilot study has been performed by Greenovate!Europe, showing resource saving potentials of 70%Such a strategy should include optimisation across the interfaces betw ...
Voir le projet

 16

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
This project (R-Wake) aims at developing a simulation framework to assess the risk and hazards of potential wake vortex encounters for the en-route phase of flight.
Voir le projet

 6

 TERMINÉ 
"Dry, wet and multiphase particulate materials constitute over 75% of raw material feedstock to industry. Despite their significance, many industrial particulate processes display unpredictable behaviour due to both their multiscale nature and the coexistence of different phases: this leads to undesirable losses in resources, energy, money and time. Considerable progress can be achieved using mult ...
Voir le projet

 11

 TERMINÉ 

Secure Enclaves for REactive Cloud Applications (SERECA)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

Cloud security is of immediate concern to organisations that must comply with strict confidentiality and integrity policies. More broadly, security has emerged as a commercial imperative for cloud computing across a wide range of markets. The lack of adequate security guarantees is becoming the primary barrier to the broad adoption of cloud computing.The Secure Enclaves for REactive Cloud Applicat ...
Voir le projet

 9

 TERMINÉ 

Adaptive self-Governed aerial Ecosystem by Negotiated Traffic (AGENT)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

Present traffic alert and collision avoidance system, TCAS II, was designed to operate in traffic densities of up to 0.3 aircraft per square nautical mile (NM), providing an excellent performance in pairwise encounters but with some shortages due to induced collision scenarios that could emerge in certain surrounding traffic scenarios. Therefore, this project proposal seeks to implement a new fram ...
Voir le projet

 4

 TERMINÉ 
"SAFURE targets the design of cyber-physical systems by implementing a methodology that ensures safety and security "by construction". This methodology is enabled by a framework developed to extend system capabilities so as to control the concurrent effects of security threats on the system behaviour.The current approach for security on safety-critical embedded systems is generally to keep subsyst ...
Voir le projet

 12

 TERMINÉ 

Satellite Technology for Advanced Railway Signalling (STARS)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Voir le projet

 18

 TERMINÉ 

Scalable Hybrid Variability for Distributed Evolving Software Systems (HyVar)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

HyVar proposes a development framework for continuous and individualized evolution of distributed software applications running on remote devices in heterogeneous environments. The framework will combine variability modeling from software product lines with formal methods and software upgrades, and be integrated in existing software development processes. HyVar's objectives are (O1) to develop a D ...
Voir le projet

 6

 TERMINÉ 
The demand for broadband content and services has been growing at tremendous rates, and predictions indicate that wireless data-rates of multiple tens of Gbps will be required by the year 2020, essentially for short-range connectivity. Currently available wireless technology cannot support these future demands, and so there is an urgent need to develop new technology platforms that are cost and en ...
Voir le projet

 11

 TERMINÉ 

Secure Hardware-Software Architectures for Robust Computing Systems (SHARCS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Developing new security paradigms, architectures, and software, for more secure and trustworthy ICT systems and services has clear social, scientific, and market motivation. This motivation is becoming stronger due to the changing threat landscape; over the past decade we are witnessing an ever-increasing amount of cyberattacks on the Internet.We believe that to advance the field of cybersecurity, ...
Voir le projet

 8

 TERMINÉ 

Nanometrology Standardization Methods for Magnetic Nanoparticles (NANOMAG)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

The NanoMag project is to improve and redefine existing analyzing methods and in some cases, to develop new analyzing methods for magnetic nanostructures. Using improved manufacturing technologies we will synthesize magnetic nanoparticles with specific properties that will be analyzed with a multitude of characterization techniques (focusing on both structural as well as magnetic properties) and b ...
Voir le projet

 18

 TERMINÉ 
"The objective is to deliver a trans-European network of industrially oriented specialists fully trained in the development and application of microbioreactor (MBR) technology to support development of innovative bio-based manufacturing processes. The specialistis will be trained by leaders in the field and with state of the art equipment and methodologies. MBRs are a promising tool for screening ...
Voir le projet

 13

 TERMINÉ 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Voir le projet

 39

 TERMINÉ 
"Cell polarity and directed growth (tropism) are fundamental biological processes. Most fungi are dependent on these processes because they grow as polarised filaments called hyphae, whose growth and developmentare governed by physical and chemical cues from the environment. Such cues include surface-contact, light, nutrients, mating partners, host organisms, or ‘self’ hyphae from within the fung ...
Voir le projet

 13

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Date du début: 1 oct. 2011, Date de fin: 30 juin 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20 ...
Voir le projet

 39

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Reconfigurable ROS-based Resilient Reasoning Robotic Cooperating Systems (R5-COP)

Date du début: 1 févr. 2014, Date de fin: 31 mars 2017,

European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Voir le projet

 34

 TERMINÉ 

MOBILISING THE POTENTIAL OF ACTIVE AGEING IN EUROPE (MOPACT)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

The starting point for MOPACT is the ambitious goals set by Horizon 2020 and the European Innovation Partnership Pilot Project on Active and Healthy Ageing (EIPAHA). Our response is ambitious too: we aim to provide the research and practical evidence upon which Europe can make longevity an asset for social and economic development. MOPACT will create a high quality, multi-disciplinary critical mas ...
Voir le projet

 32

 TERMINÉ 
The cerebellum coordinates the body’s movements. It consists of distinct layers of neuronal populations, but during embryonic development, these neurons are generated distantly from their final locations. In zebrafish, this means that cerebellar neurons have to migrate from the upper rhombic lip to the midbrain-hindbrain boundary and further. While descriptions of the migratory pathways for the di ...
Voir le projet

 1

 TERMINÉ 

High Altitude Ice Crystals (HAIC)

Date du début: 1 août 2012, Date de fin: 31 janv. 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Voir le projet

 40

 TERMINÉ 
MacSpace will research, innovate, architect, design, develop and validate a Non-Dependent High-Performance ManyCore Rad-Hard Processor and DSP Computer for Computation-Intensive Space Applications. When this 33-month project ends the MacSpace Processor will reach computational performance over 10x higher than the emerging alternatives, which merely set 1GFLOPS as minimum required for space DSP.The ...
Voir le projet

 7