Rechercher des projets européens

28 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
mySMARTLife project aims at the development of an Urban Transformation Strategy to support cities in the definition of transition models, as a suitable path to reach high level of excellence in its development process, addressing the main city challenges and progressing to the smart people and smart economy concepts.The main instrument to achieve this very ambitious strategy will be the definition ...
Voir le projet

 28

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 

Architecture for EurOpean Logistics Information eXchange (AEOLIX)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Supply chain visibility supported by easy access to, and exchange and use of relevant and abundant logistics-related information is an important prerequisite for the deployment of pan-European logistics solutions that are needed to increase efficiency and productivity, and to reduce environmental impact. Although there is a proliferative development of logistics-related data stores, information ch ...
Voir le projet

 34

 TERMINÉ 
The INDIGO-DataCloud project (INDIGO for short) aims at developing a data/computing platform targeted at scientific communities, deployable on multiple hardware, and provisioned over hybrid (private or public) e-infrastructures. This platform will be built by leading European developers, resource providers, e-infrastructures and scientific communities in order to ensure its successful exploitation ...
Voir le projet

 27

 TERMINÉ 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

"LNG Blue Corridors unites/mobilizes the critical mass of experience (know-how, expertise, (industrial) parties and stakeholders) in LNG transport and infrastructure technology. It involves cooperation between heavy duty vehicle manufacturers, fuel suppliers, fuel distributors and fleet operators. The project includes a first definition of European LNG Blue Corridors, with strategic LNG refuelling ...
Voir le projet

 27

 TERMINÉ 

COoperative loGISTICS for sustainable mobility of goods (CO-GISTICS)

Date du début: 1 janv. 2014, Date de fin: 31 mars 2017,

Key logistics stakeholders from seven European cities/logistics hubs (Bordeaux, Frankfurt, Thessaloniki, Trieste, Arad, Bilbao and Vigo) have joined forces to deploy, validate and set-up after project life of five piloted cooperative logistics services combining cooperative mobility services and intelligent cargo with real-life logistical aspects. CO-GISTICS services will increase energy efficienc ...
Voir le projet

 33

 TERMINÉ 
The goal of Viajeo PLUS is to benchmark outstanding solutions for innovative and green urban mobility in Europe, Latin America, China and Singapore and subsequently facilitate the uptake of these solutions across different cities in these regions, and Mediterranean Partner Countries (MPCs).Over a 36-month timeframe, the Viajeo PLUS consortium will engage with leading European innovative organisati ...
Voir le projet

 18

 TERMINÉ 
Cyber-physical networks based on embedded systems are part of our society and gain spread and importance. Next generations of aircrafts and cars will be tightly interconnected with each other, with the Internet and other infrastructures. The same holds for many industries and areas of our life. Ubiquitous, highly critical systems go online and create a domain of mixed criticalities, where security ...
Voir le projet

 15

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
"The WASH&LOAD project aim is to scientifically characterise latest achievements in science and technology for the development of Guidelines and Pre-normative research aimed at supporting the more than 20,000 SMEs involved in the functional clothing value chain in implementing cost-effective practices for reloading protective functionalities in protective clothing and bed linen textiles during lif ...
Voir le projet

 16

 TERMINÉ 
Plant food supplements, or botanicals, have high acceptance by European consumers. Potentially, they can deliver significant health benefits, safely, and at relatively low costs. New regulations and EFSA guidance are also now in. However, concerns about safety, quality and efficacy of these products remain, and bottle-necks in risk and benefit assessments need to be solved. PlantLIBRA (PLANT food ...
Voir le projet

 27

 TERMINÉ 

Helix Nebula - The Science Cloud (Helix Nebula)

Date du début: 1 juin 2012, Date de fin: 31 mai 2014,

...: ATOS, BT Global Services, CAP Gemini, CERN, CloudSigma, CNES, CNR, DLR, the EC, EGI.eu, EMBL, ENEA, ESA, Logica, OpenNebula, Orange Business Services, SAP, SIENA, StratusLab, Server Labs, Six2, T-Systems International, Terradue srl, Thales and TrustIT.The HELIX NEBULA Project will lead and co-ordinate these communities of interest through a two year pilot-phase during which procurement processes ...
Voir le projet

 11

 TERMINÉ 

Secure Web OS Application Delivery Environment (webinos)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

The webinos project will define and deliver an Open Source Platform and specific components for the Future Internet, which will enable web applications and services to be used and shared consistently and securely over a broad spectrum of converged and connected devices, including mobile, PC, home media (TV) and in-car units. Promoting a "single service for every device" vision, webinos will move t ...
Voir le projet

 23

 TERMINÉ 

Scoping the Single European Digital Identity Community (SSEDIC)

Date du début: 15 nov. 2010, Date de fin: 31 oct. 2013,

The objective of this network will be to provide a platform for all the stakeholders of eID (electronic identity) to work together and collaborate to prepare the agenda for a proposed Single European Digital Identity Community. The network will identify the actions and the timetable for the Digital Agenda (DAE) and the successful launch of the European Large Scale Action (ELSA), as well as to prov ...
Voir le projet

 34

 TERMINÉ 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Date du début: 1 sept. 2009, Date de fin: 28 févr. 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Voir le projet

 70

 TERMINÉ 

Secure Identity Across Borders Linked (STORK)

Date du début: 1 juin 2008, Date de fin: 31 déc. 2011,

Description eID - easier access to public services across the EUSeveral barriers to free movement of workers still exist in the EU: for example, it is not easy to access public services while working or living in another country. The European Commission has launched a pilot project to remedy this situation with an EU-wide system for the r ...
Voir le projet

 35

 TERMINÉ 
This Trilogy proposal is for a 3-year Integrated Project targeting Challenge 1 of the 7th Framework Programme: "Pervasive and Trusted Network and Service Infrastructures". The project scope lies entirely within Objective 1.1, "The Network of the Future".The aim of the project is to develop new solutions for the control architecture of the Internet that remove the known and emerging technical defic ...
Voir le projet

 12

 TERMINÉ 

Pan-European Laboratory Infrastructure Implementation (PII)

Date du début: 1 juin 2008, Date de fin: 31 mars 2011,

PII addresses the need for large-scale testing facilities in the communications area by implementing an infrastructure for federating testbeds. The central objective of PII is to create a testbed federation among regional innovation clusters in Europe. This will enable companies participating in these clusters to test new communication services and applications across Europe. The testbed federatio ...
Voir le projet

 22

 TERMINÉ 

CARrier grade MEsh Networks (CARMEN)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

CARMEN, CARrier grade MEsh Networks, will study and specify a wireless mesh network supporting carrier grade triple-play services for mobile/fixed network operators. Future operator networks will be comprised of a common core network and several access networks, and the CARMEN access network will complement other access technologies by providing a low cost and fast deployment mesh network access t ...
Voir le projet

 9

 TERMINÉ 
The existing licensing models for commercial applications are focusing on software used on compute resources within an administrative domain. A problem occurs when we want to use this software in a distributed service oriented infrastructure where the resources are often not in the same administrative domain that hosts the license server which is authorizing the application use. Today licenses usu ...
Voir le projet

 14

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39

 TERMINÉ 

Secure Widespread Identities for Federated Telecommunications (SWIFT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Identity Management is considered key to private, legal and business transactions as in the European eIDM2010. IdM frameworks are however currently confined to the web services domain. SWIFT goes beyond this by including user centricity and network operators as additional interdependent domains with IdM at the core.This new view of user centricity provides a novel perspective: Identity as central ...
Voir le projet

 10

 TERMINÉ 

End-to-End Efficiency (E3) (E3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Voir le projet

 23

 TERMINÉ 
The project is based on the results of a project developed during the first stage of the Leonardo da Vinci programme, with the objective of providing training in industrial maintenance.During this first project, the partners monitored the training of some IT technicians using the teaching pack. Their reactions led the partnership to adapt the teaching pack for industrial maintenance for use in aft ...
Voir le projet

 14

 TERMINÉ 
Die Förderung der Gesundheitsvorsorge und Prävention ist ein klares Ziel der Gesamteuropäischen, aber auch jeder nationalstaatlichen Gesundheitspolitik, dessen schnellstmögliche Umsetzung – besonders vor dem Grund der explodierenden Sozial- und Gesundheitskosten von den unterschiedlichsten ExpertInnen immer vehementer eingefordert wird. Diese Umsetzung vor dem Hintergrund des gesellschaftlichen Wa ...
Voir le projet

 10

 TERMINÉ 
iTV is an interactive channel of information and training, which has already been tested in selective training environments. The aim of this project is not the further technical development, but most of all the testing of transferability to the specific learning conditions of SMEs. The in-firm training with SMEs, which needs to be independent of location, costs and needs to be problem solving orie ...
Voir le projet

 30

 TERMINÉ 
Die Förderung der Gesundheitsvorsorge und Prävention ist ein klares Ziel der Gesamteuropäischen, aber auch jeder nationalstaatlichen Gesundheitspolitik, dessen schnellstmögliche Umsetzung – besonders vor dem Grund der explodierenden Sozial- und Gesundheitskosten von den unterschiedlichsten ExpertInnen immer vehementer eingefordert wird. Diese Umsetzung vor dem Hintergrund des gesellschaftlichen Wa ...
Voir le projet

 10