Rechercher des projets européens

13 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Regions of Connected Knowledge (RoCK)

Date du début: 30 juin 2007, Date de fin: 29 juin 2015,

Overall aim of RoCK is to improve connectivity within and between regions of knowledge. by development of railway connections into high quality efficient and user-friendly interoperable systems. Within the RoCK-project. connectivity will be improved by making use of existing connections and by developing and implementing smart solutions to improve their quality. Partnership The RoCK partnershi ...
Voir le projet

 13

 TERMINÉ 

Intelligent Transportation for Dynamic Environment (InTraDE)

Date du début: 2 oct. 2007, Date de fin: 30 mars 2014,

The world seaborne trade has been developed in the last decade. mainly due to globalization and development of emerging countries. This world growth has an influence on the development of ports and maritime terminals. Within North West Europe (NWE). few ports are able to keep pace with this growth. despite the importance of this coastal area (stretching from Ireland to the Netherlands (see Figures ...
Voir le projet

 7

 TERMINÉ 
...en countries. England has one of the highest rates of landfill. Methane emissions from UK landfill account for 40% of all UK methane emissions and 3% of all UK greenhouse gas emissions. In 2006, the South East of England sent to landfill more total waste, more construction demolition and excavation (CD&E) waste, and more commercial and industrial (C&I) waste, than any other of the eight regions i ...
Voir le projet

 2

 TERMINÉ 

s adapting to change (PATCH)

Date du début: 31 déc. 2007, Date de fin: 29 juin 2012,

... were 3 B2B, 1 workshop, 1 conference, 1 stand (Just-in-Log workshop), 2 pilots developped by lead partner and partner 5.In addition 1 workshop on intermodality was held in Nieuwdorp, 3 stands at the Southern Manufacturing Fair and Seawork, 2 port master plans developped by partner 6 and partner 7, 2 transport connectivity studies by partner 8, 1 report on cooling systems by partner 6, 3 BC Water, ...
Voir le projet

 9

 TERMINÉ 

Intermodal Port Access and Commodities Transport in Europe

Date du début: 31 mai 2005, Date de fin: 29 juin 2008,

International traffic between the UK and continental Europe is a specific territorial issue which the partnership will address through sustainable distribution and the economic development of ports. They will also develop a maritime integrated network and strategy.
Voir le projet

 26

 TERMINÉ 

HST Integration

Date du début: 31 août 2002, Date de fin: 29 juin 2008,

between high speed rail stations in North West Europe. The project, whose lead partner is the South East England Development Agency, working in conjunction with a total of 18 partners from the UK, Belgium, Germany and the Netherlands, aims to investigate and demonstrate the means by which HST stations and station area developments can serve the internal cohesion as well as the external strength an ...
Voir le projet

 19

 TERMINÉ 

SMART ECONOMIC GROWTH - SEG (SEG)

Date du début: 31 déc. 2004, Date de fin: 29 juin 2008,

The partners will develop a definition of "Smart Economic Growth" and engage businesses and local governance in a thought process towards smarter and sustainable approches to economic development.The study will focus on multi-layered issues surrounding economic growth such as traffic congestion, land and labour costs, and skill management.
Voir le projet

 7

 TERMINÉ 

HST Connect

Date du début: 31 mai 2003, Date de fin: 29 févr. 2008,

High speed transport has a key role to play in promoting balanced spatial development across NW Europe. Therefore any attempt to improve HST needs to work on a transnational basis. The prime objective of the 15 partner, 21.893m euro HST Connect project is to forge closer connections between regional rail services and the trans-European High Speed Train network, with the aim of increasing the latte ...
Voir le projet

 14

 TERMINÉ 

Connected Cities (CC)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

European citizens travel much further to work and leisure facilities today than in the past. Despite bringing benefits, this huge increase in mobility has led to traffic congestion and pollution, holding back efforts to achieve sustainable development. Public transport can form the basis of more sustainable approaches to mobility. However, the mismatch between older public transport networks and m ...
Voir le projet

 25

 TERMINÉ 

Espace Manche Development Initiative (EMDI)

Date du début: 10 mars 2003, Date de fin: 29 sept. 2007,

The English Channel is both the world’s busiest maritime thoroughfare and the main gateway to NW Europe. And it is likely to become busier as the traffic of goods and people between the UK and the Continent grows. The common problems generated by this vital artery strengthen the need for transnational co-operation , which will be tested by the EMDI project through pilot initiatives on a series of ...
Voir le projet

 22

 TERMINÉ 

FINESSE (Freight Intermodality and Exchange on Sea and Straits in Europe) (FINESSE)

Date du début: 31 août 2002, Date de fin: 30 janv. 2006,

This 3-year project led by the UK’s South East England Development Agency brings together 11 partners with the objective of developing sustainable freight transport services between the South East of England, France and Belgium, including rail-ferry services and hinterland connections. The FINESSE project entails research and practical preparations for sustainable, intermodal transport and logisti ...
Voir le projet

 10

 TERMINÉ 
According to the text of the proposal, there are 38 millions of persons with disabilities across Europe and only 35% of them are in the position to earn their own living. Add to these data the persons who have responsibilities of care, who are millions too, and often prevented to get a regular job due to constraints of time and mobility caused by the quoted responsibilities of care. The project is ...
Voir le projet

 7

 TERMINÉ 
The project is devoted to the implementation of a training plan for SMEs employees such as to allow them to share and apply knowledge and know how in team activities, together with other team member. Collaborative knowledge demands, as a pre-requisite, appropriate skills and abilities: the training programme, e.learning based, has that purpose. As a preliminary activity, a research is envisaged on ...
Voir le projet

 21