Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The GELCLAD project aims at creating a novel cost-effective, durable, industrialised and easy to install composite insulation cladding system, based on a single multi-meso-structured panel with excellent insulation properties, made from functional bio-polymer composite (ecoWPC) as skin coupling with unique advanced foamable extrudable aerogel (FEA) as insulation core/layer. The GELCLAD is produced ...
Voir le projet

 12

 TERMINÉ 

ENERGY EFFICIENT DEMO MULTIRESIDENTIAL HIGH RISE BUILDING (EE-HIGHRISE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

The overall objective of the project is to demonstrate and validate new technologies, concepts, and systems used in EE-HIGHRISE project, in order to test and assess the technological and economical feasibility of innovative energy solutions in high rise demo building Eco Silver House. Demo high rise building Eco Silver House is located in the city centre of Ljubljana. The net total area covers the ...
Voir le projet

 10

 TERMINÉ 
Current methods to provide fire protection of light steel structures lack performance and has resulted in a decrease in structural steel market share. State-of-the-art intumescent coatings (ICs) is not a robust technology due to extensive coating and drying times, and low fire resistance (FR) values. There have not been any innovative solutions to overcome such problems in the last few years, resu ...
Voir le projet

 7

 TERMINÉ 
The increasing cost of traditional energy sources and the availability of new emerging building technologies in lighting, heating, ventilation, air conditioning, isolation, energy monitoring and management of the buildings, are expected to increase the global market for low carbon solutions. However, some financial, organizational and social innovation enablers are required to leverage the transfo ...
Voir le projet

 19

 TERMINÉ 
40% of energy consumption and 36% CO2 emissions in Europe are directly related to the buildings due mainly to inefficient insulation materials and systems. Currently required insulation performance may only be achieved either by installing extremely thick ordinary insulation materials and sacrificing living spaces or by using unaffordable the state-of-the-art insulation materials (e.g. silica aero ...
Voir le projet

 8

 TERMINÉ 
New building strategies addressing climate change effects and reduction of heating/cooling energy are two fundamental issues at EU level. Figures as the 35,000 excess deaths attributed to the last heat wave in the continent in 2003, or 10% of the world’s energy being used just for heating of buildings support European citizen’s concerns and new EU legislation. New national and communitarian string ...
Voir le projet

 11

 TERMINÉ 
The overall objective of OPEN HOUSE is to develop and to implement a common European transparent building assessment methodology, complementing the existing ones, for planning and constructing sustainable buildings by means of an open approach and technical platform. OPEN HOUSE will develop a transparent approach able to emerge collectively in an open way across the EU. This approach will be commu ...
Voir le projet

 20

 TERMINÉ 

Multi-source Energy Storage System Integrated in Buildings (MESSIB)

Date du début: 1 mars 2009, Date de fin: 28 févr. 2013,

The overall objective of MESSIB is the development, evaluation and demonstration of an affordable multi-source energy storage system (MESS) integrated in building, based on new materials, technologies and control systems, for significant reduction of its energy consumption and active management of the building energy demand. This new concept will reduce and manage smartly the electrical energy req ...
Voir le projet

 24

 TERMINÉ 

INNOVATIVE FIRE PROTECTIVE COATINGS FOR STEEL STRUCTURES (STEELPROST)

Date du début: 1 mai 2010, Date de fin: 31 oct. 2012,

Current methods to provide fire protection of light steel structures include the nowadays most efficient approach of intumescent paints, which are typically applied on-site on a mounted structure using brushes or spray guns. Such treatments are generally achieved through the preparation of the surface by grit/shot blasting, followed by the application of a primer, and followed by the application o ...
Voir le projet

 11

 TERMINÉ 
The overall technological aim is to develop a mould-brick acoustic solution based on noise absorption and insulation due material density and porosity that will at least increase levels in 6 dB in performance but at a 20% lower weight and will avoid or minimize noise flanking. The acoustic insulation and absorption of the brick will be achieved by developing the concept of layers oand forms in the ...
Voir le projet

 9

 TERMINÉ 
The driving idea of REG CON is the advancement of the concept of “R&D based clustering” across regions of Europe with a thematic focus on construction. This sector is both dynamic in creation of growth and employment [~7% of national employment/GDP, ~14% when add design and materials], but relatively backward in absorbing innovation. The Strategic Research Agenda prepared by European Construction ...
Voir le projet

 15